Developing a barrier management framework for dealing with Natech domino effects and increasing chemical cluster resilience
Tài liệu tham khảo
Abdolhamidzadeh, 2010, A new method for assessing domino effect in chemical process industry, J. Hazard. Mater., 182, 416, 10.1016/j.jhazmat.2010.06.049
Chen, 2021, Numerical investigation on performance of protective layer around large-scale chemical storage tank against impact by projectile, J. Loss Prev. Process Ind., 69, 10.1016/j.jlp.2020.104351
Cincotta, 2019, Resilience-based optimal firefighting to prevent domino effects in process plants, J. Loss Prev. Process Ind., 58, 82, 10.1016/j.jlp.2019.02.004
Cozzani, 2021
Cozzani, 2014, Quantitative assessment of domino and NaTech scenarios in complex industrial areas, J. Loss Prev. Process Ind., 28, 10, 10.1016/j.jlp.2013.07.009
Hauge, S., Øien, K., 2016. Guidance for barrier management in the petroleum industry (Accessed in January 27, 2022). 〈https://www.sintef.no/globalassets/project/pds/reports/pds-report-guidance-for-barrier-management-in-the-petroleum-industry.pdf〉.
IEC 61511, 2003
Jia, 2017, Equipment vulnerability assessment (EVA) and pre-control of domino effects using a five-level hierarchical framework (FLHF), J. Loss Prev. Process Ind., 48, 260, 10.1016/j.jlp.2017.05.004
Jung, 2019, Plant layout and blast wall optimization with the consideration of operating conditions and potential explosions, Process Saf. Environ. Prot., 132, 285, 10.1016/j.psep.2019.10.010
Khakzad, 2013, Domino effect analysis using Bayesian networks, Risk Anal., 33, 292, 10.1111/j.1539-6924.2012.01854.x
Khakzad, 2017, Application of dynamic Bayesian network to performance assessment of fire protection systems during domino effects, Reliab. Eng. Syst. Saf., 167, 232, 10.1016/j.ress.2017.06.004
Khakzad, 2018, Cost-effective fire protection of chemical plants against domino effects, Reliab. Eng. Syst. Saf., 169, 412, 10.1016/j.ress.2017.09.007
Krausmann, 2016
Landucci, 2012, Release of hazardous substances in flood events: damage model for atmospheric storage tanks, Reliab. Eng. Syst. Saf., 106, 200, 10.1016/j.ress.2012.05.010
Men, 2022, An event-driven probabilistic methodology for modeling the spatial-temporal evolution of natural hazard-induced domino chain in chemical industrial parks, Reliab. Eng. Syst. Saf., 226, 10.1016/j.ress.2022.108723
Meng, 2018, Modeling patterns for reliability assessment of safety instrumented systems, Reliab. Eng. Syst. Saf., 180, 111, 10.1016/j.ress.2018.06.026
Necci, 2014, Accident scenarios triggered by lightning strike on atmospheric storage tanks, Reliab. Eng. Syst. Saf., 127, 30, 10.1016/j.ress.2014.02.005
PSA – Petroleum Safety Authority Norway, 2013. Principles for barrier management in the petroleum industry (Accessed 27 January, 2022). 〈https://www.ptil.no/contentassets/11851dc03a84473e8299a2d80e656356/principles-for-barrier-management-in-the-petroleum-industry_2013.pdf〉.
Rana, 2010, Forced dispersion of LNG vapor with water curtain, J. Loss Prev. Process Ind., 23, 768, 10.1016/j.jlp.2010.08.008
Rathnayaka, 2011, SHIPP methodology: predictive accident modeling approach. Part II. Validation with case study, Process Saf. Environ. Prot., 89, 75, 10.1016/j.psep.2010.12.002
Reniers, 2013
Reniers, 2018, The impact of nature on chemical industrial facilities: dealing with challenges for creating resilient chemical industrial parks, J. Loss Prev. Process Ind., 56, 378, 10.1016/j.jlp.2018.09.010
Ricci, 2021, A comprehensive analysis of the occurrence of Natech events in the process industry, Process Saf. Environ. Prot., 147, 703, 10.1016/j.psep.2020.12.031
Salzano, 2003, Seismic risk of atmospheric storage tanks in the framework of quantitative risk analysis, J. Loss Prev. Process Ind., 16, 403, 10.1016/S0950-4230(03)00052-4
Sun, 2017, Investigation on the approach of intercepting fragments generated by vessel explosion using barrier net, J. Loss Prev. Process Ind., 49, 989, 10.1016/j.jlp.2016.10.012
Xie, 2018, Common Cause Failures and Cascading Failures in Technical Systems: Similarities, Differences and Barriers, 2401