“Bow-tie” model in layer of protection analysis

Process Safety and Environmental Protection - Tập 89 - Trang 205-213 - 2011
Adam S. Markowski1, Agata Kotynia1
1Safety Engineering Department, Faculty of Process and Environmental Engineering, Technical University of Lodz, 90-133 Lodz, ul. Wolczanska 213, Poland

Tài liệu tham khảo

Bowles, 1995, Application of fuzzy logic to reliability engineering, Proc. IEEE, 80, 435, 10.1109/5.364489 CCPS, 2001 Dianous, 2005, ARAMIS project: A more explicit demonstration of risk control through the use of bow–tie diagrams and the evaluation of safety barrier performance, J. Hazard. Mater., 130, 220, 10.1016/j.jhazmat.2005.07.010 Dubois, 1980 Fussell, 1972, A new methodology for obtaining cut sets for fault trees, Trans. Am. Nucl. Soc., 15, 262 Markowski, 2006 Markowski, 2008, Fuzzy risk matrix, J. Hazard. Mater., 159, 152, 10.1016/j.jhazmat.2008.03.055 Markowski, 2009, Fuzzy logic for piping risk assessment (pfLOPA), J. Loss Prev. Proc. Ind., 22, 921, 10.1016/j.jlp.2009.06.011 Markowski, 2009, Fuzzy logic for process safety analysis, J. Loss Prev. Proc. Ind., 22, 695, 10.1016/j.jlp.2008.11.011 Markowski, 2010, Uncertainty aspects in process hazard analysis, J. Loss Prev. Proc. Ind., 23, 446, 10.1016/j.jlp.2010.02.005 Pokorádi, 2010, Application of fuzzy set theory for risk assessment, J. KONBiN, 2–3, 1895 Singer, 1990, A fuzzy set approach to fault tree and reliability analysis, Fuzzy Sets Syst., 34, 145, 10.1016/0165-0114(90)90154-X Yen, 1999