New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing

Journal of Scheduling - Tập 14 - Trang 157-171 - 2009
Behzad Ashtiani1, Roel Leus2, Mir-Bahador Aryanezhad1
1Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
2Department of Decision Sciences and Information Management, Katholieke Universiteit Leuven, Leuven, Belgium

Tóm tắt

We study the resource-constrained project scheduling problem with stochastic activity durations. We introduce a new class of scheduling policies for solving this problem, which make a number of a-priori sequencing decisions in a pre-processing phase while the remaining decisions are made dynamically during project execution. The pre-processing decisions entail the addition of extra precedence constraints to the scheduling instance, hereby resolving some potential resource conflicts. We obtain new competitive results for expected-makespan minimization on representative datasets, which are significantly better than those obtained by the existing algorithms when the variability in the activity durations is medium to high.

Tài liệu tham khảo

Elmaghraby, S. (1977). Activity networks. New York: Wiley-Interscience.

Lambrechts, O. 2007. Robust project scheduling subject to resource breakdowns. Ph.D. thesis, Katholieke Universiteit Leuven, Belgium.

Neumann, K., Schwindt, C., & Zimmermann, J. (2002). Project scheduling with time windows and scarce resources. Berlin: Springer.

Pet-Edwards, J., Selim, B., Armacost, R. L., & Fernandez, A. (1998). Minimizing risk in stochastic resource-constrained project scheduling. In: Proceedings of INFORMS fall meeting, Seattle, USA.

Shtub, A., Bard, J., & Globerson, S. (2005). Project management. Processes, methodologies, and Economics. New York: Pearson, Prentice Hall.

Stork, F. 2001. Stochastic resource-constrained project scheduling. Ph.D. thesis, Technische Universität Berlin.

Wu, S. D., Byeon, E. S., & Storer, R. H. (1999). A graph-theoretic decomposition of job shop scheduling to achieve scheduling robustness. Operations Research, 47(1), 113–124.