Scheduling subject to resource constraints: classification and complexity
Tài liệu tham khảo
Blazewicz, 1979, Deadline scheduling of tasks with ready times and resource constraints, Information Processing Lett., 8, 60, 10.1016/0020-0190(79)90143-1
Conway, 1967
Even, 1975, An O(n2·5) algorithm for maximum matching in general graphs, Proc. 16th Annual IEEE Symp. Foundations of Computer Science, 100
Garey, 1975, Complexity results for multiprocessor scheduling under resource constraints, SIAM J. Comput., 4, 397, 10.1137/0204035
Garey, 1979
Gonzalez, 1978, Preemptive scheduling of uniform processor systems, J. Assoc. Comput. Mach., 25, 92, 10.1145/322047.322055
Graham, 1979, Optimization and approximation in deterministic sequencing and scheduling: a survey, Ann. Discrete Math., 5, 287, 10.1016/S0167-5060(08)70356-X
Karp, 1975, On the computational complexity of combinatorial problems, Networks, 5, 45, 10.1002/net.1975.5.1.45
Khachian, 1979, A polynomial algorithm in linear programming, Soviet Math. Dokl., 20, 191
Lageweg, 1981, Computer aided complexity classification of deterministic scheduling problems
Slowinski, 1980, Two approaches to problems of resource allocation among project activities — a comparative study, J. Operational Res. Soc., 31, 711
Ullman, 1976, Complexity of sequencing problems, 139
Weglarz, 1977, Algorithm 520: an automatic revised simplex method for constrained resource network scheduling, ACM Trans. Math. Software, 3, 295, 10.1145/355744.355755