Stochastic network project scheduling with non-consumable limited resources
Tài liệu tham khảo
Luss, 1991, A non-linear minimax allocation problem with multiple knapsack constraints, Oper. Res. Lett., 10, 183, 10.1016/0167-6377(91)90057-V
Thesen, 1976, Heuristic scheduling of activities under resource and precedence restrictions, Mgmt. Sci., 23, 412, 10.1287/mnsc.23.4.412
Thesen, 1978
Pritzker, 1969, Multiproject scheduling with limited resources: a zero-one programming approach, Mgmt. Sci., 16, 93, 10.1287/mnsc.16.1.93
Lofts, 1974, Multiple allocation of resources in a network; an optimum scheduling algorithm, Can. J. Oper. Res. Inform. Process, 12, 25
Davis, 1971, An algorithm for optimal project scheduling under multiple resource constraints, Mgmt. Sci., 17, B803, 10.1287/mnsc.17.12.B803
Hastings, 1976, Project scheduling with resource constraint using branch and bound, Oper. Res. Quart., 27, 341, 10.1057/jors.1976.61
Willis, 1981, A note on the generation of project network diagrams, J. Oper. Res. Soc., 32, 235, 10.2307/2581066
Willis, 1985, Critical path analysis and resource constrained project scheduling. Theory and practice, Eur. J. Oper. Res., 21, 149, 10.1016/0377-2217(85)90026-8
Bell, 1991, A new heuristic solution method in resource-constrained project scheduling, Nav. Res. Logist., 38, 315, 10.1002/1520-6750(199106)38:3<315::AID-NAV3220380304>3.0.CO;2-7
Davis, 1973, Project scheduling under resource constraints. Historical review and categorization of procedures, AIIE Trans., 5, 297, 10.1080/05695557308974916
Davis, 1974, Networks: Resource allocation, J. Ind. Eng., 6, 22
Herroelen, 1972, Resource-constrained project scheduling. The state of art, Oper. Res. Quart, 2B, 261, 10.1057/jors.1972.48
Wiest, 1967, A heuristic model for scheduling large projects with limited resources, Mgmt. Sci., 13, B359, 10.1287/mnsc.13.6.B359
Wiest, 1977
Lorterapong, 1994, A fuzzy heuristic method for resource constrained project scheduling, Project Mgmt. J., 25, 12
Minciardi, 1994, Development of a heuristic project scheduler under resource constrains, Eur. J. Oper. Res., 79, 176, 10.1016/0377-2217(94)90349-2
Ulisoy, 1995, A heuristic scheduling algorithm for improving the duration and net present value of a project, Int. J. Oper. Prod. Mgmt., 15, 89, 10.1108/01443579510077241
Sampson, 1993, Local search techniques for the generalized resource constrained project scheduling problem, Navel. Res. Logist, 40, 665, 10.1002/1520-6750(199308)40:5<665::AID-NAV3220400509>3.0.CO;2-J
Zhan, 1994, Heuristics for scheduling resource-constrained projects in MPM networks, Eur. J. Oper. Res., 76, 192, 10.1016/0377-2217(94)90016-7
Toker, 1991, Scheduling under a non-renewable resource constraint, J. Oper. Res. Soc, 42, 811, 10.1057/jors.1991.152
Deckro, 1989, Resource constrained project crashing, Omega, 17, 69, 10.1016/0305-0483(89)90022-4
McBride, 1985, Solving embedded generalized network problems, Eur. J. Oper. Res., 21, 82, 10.1016/0377-2217(85)90091-8
Kidd, 1987, A comparison between the VERT program and other methods of project duration estimates, Omega, 15, 129, 10.1016/0305-0483(87)90027-2
Williams, 1992, Practical use of distributions in activity analysis, J. Oper. Res. Soc., 43, 265, 10.1057/jors.1992.35
Schonberger, 1981, Why projects are always late: a rationale based on simulation of a PERT/CPM method, Interfaces, 11, 66, 10.1287/inte.11.5.66
Golenko-Ginzburg, 1993, A two-level decision-making for controlling stochastic projects, Int. J. Prod. Econom., 32, 117, 10.1016/0925-5273(93)90014-C
Golenko-Ginzburg, 1996, On-line model for COST-Simulation network projects, J. Oper. Res. Soc., 47, 266, 10.1057/jors.1996.24
Taha, 1976
Golenko-Ginzburg, 1988, On the distribution of activity time in PERT, J. Oper. Res. Soc., 39, 767, 10.1057/jors.1988.132