Two-stage production scheduling with an option of outsourcing from a remote supplier

Xiangtong Qi1
1Department of Industrial Engineering and Logistics Management, The Hong Kong University of Science and Technology, Hong Kong, Hong Kong

Tóm tắt

Từ khóa


Tài liệu tham khảo

Agnetis, A., Hall, N.G. & Pacciarelli, D. (2006). Supply chain scheduling: sequence coordination. Discrete Applied Mathematics, 154: 2044–2063

Aydinliyim, T. & Vairaktarakis, G.L. (2006). Coordination of outsourcing operations. Working paper

Cai, X., Lee, C.Y. & Vairaktarakis, G.L. (2005). Optimization of processing and delivery decisions involving third-party machines. Nonlinear Analysis, 63: 2269–2278

Chang, Y.C. & Lee, C.Y. (2004). Machine scheduling with job delivery coordination. European Journal of Operational Research, 158: 470–487

Chen, Z.L. & Li, C.L. (2008). Scheduling with subcontracting options. IIE Transactions, 40: 1171–1184

Chen, Z.L. & Pundoor, G. (2006). Order assignment and scheduling in a supply chain. Operations Research, 54: 555–572

Chen, Z.L. & Vairaktarakis, G.L. (2005). Integrated scheduling of production and distribution operations. Management Science, 51: 614–628

Cheng, T.C.E. & Kovalyov, M.Y. (2001). Single supplier scheduling for multiple deliveries. Annals of Operations Research, 107: 51–63

Chung, D., Lee, K., Shin, K. & Park, J. (2005). A new approach to job shop scheduling problems with due date constraints considering operation subcontracts. International Journal of Production Economics, 98: 238–250

Dawande, M., Geismar, H.N., Hall, N.G. & Sriskandarajah, C. (2006). Supply chain scheduling: distribution systems. Production and Operations Management, 15: 243–261

Hall, N.G. & Potts, C.N. (2003). Supply chain scheduling: batching and delivery. Operations Research, 51: 566–584

Hall, N.G. & Potts, C.N. (2005). The coordination of scheduling and batch deliveries. Annals of Operations Research, 135: 41–64

Kreipl, S. & Pinedo, M. (2004). Planning and scheduling in supply chains: an overview of issues in practice. Production and Operations Management, 13: 77–92

Kyparisis, G.J. & Koulamas, C. (2006). A note on makespan minimization in two-stage flexible flow shops with uniform machines. European Journal of Operational Research, 175: 1321–1327

Lee, C.Y. & Vairaktarakis, G.L. (1994). Minimizing makespan in hybrid flowshops. Operations Research Letters, 16: 149–158

Lee, C.Y. & Chen, Z.L. (2001). Machine scheduling with transportation considerations. Journal of Scheduling, 4: 3–24

Lee, C.Y., Leung, J.Y.T. & Yu, G. (2006). Two machine scheduling under disruptions with transportation considerations. Journal of Scheduling, 9: 35–48

Lee, I.S. & Sung, C.S. (2008a). Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed. European Journal of Operational Research, 186: 931–952

Lee, I.S. & Sung, C.S. (2008b). Single machine scheduling with outsourcing allowed. International Journal of Production Economics, 101: 623–634

Lee, Y.H., Jeong, C.S. & Moon, C. (2002). Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering, 43: 351–374

Lenstra, J.K., Rinnooy Kan, A.H.G. & Brucker, P. (1977). Complexity of machine scheduling problems. Annuals of Discrete Mathematics, 1: 343–362

Li, C.L. & Xiao, W.Q. (2004). Lot streaming with supplier-manufacturer coordination. Naval Research Logistics, 51: 522–542

Li, C.L., Vairaktarakis, G.L. & Lee, C.Y. (2005). Machine scheduling with deliveries to two customer locations. European Journal of Operational Research, 164: 39–51

Oguz, C. & Ercan, M. (2005). A genetic algorithm for hybrid flow-shop scheduling ith multiprocessor tasks. Journal of Scheduling, 8: 323–351

Qi, X. (2005). A logistics scheduling model: inventory cost reduction by batching. Naval Research Logistics, 52: 312–320

Qi, X. (2006). A logistics scheduling model: scheduling and transshipment for two processing centers. IIE Transactions, 38: 609–618

Qi, X. (2008). Coordinated logistics scheduling for in-house production and outsourcing. IEEE Transactions on Automation Science and Engineering, 5: 188–192

Ruiz-Torres, A.J., Ho, J.C. & Lopez, F.J. (2006). Generating Pareto schedules with outsource and internal parallel resources. International Journal of Production Economics, 103: 810–825

Sundararaghavan, P.S., Kunnathur, A.S. & Viswanathan, I. (1997). Minimizing makespan in parallel flowshops. Journal of the Operational Research Society, 48: 834–842

Tang, L., Xuan, H. & Liu, J. (2006). A new Lagrangian relaxation algorithm for hybrid lowshop scheduling to minimize total weighted completion time. Computers & Operations Research, 33: 3344–3359

Vairaktarakis, G.L. (2006a). Non-cooperative outsourcing games. Working paper

Vairaktarakis, G.L. (2006b). Cooperative strategies for manufacturing planning with negotiable third-party capacity. Working paper.

Wang, H. & Lee, C.Y. (2005). Production and transport logistics scheduling with two transport mode choices. Naval Research Logistics, 52: 796–809