Two-stage production scheduling with an option of outsourcing from a remote supplier
Tóm tắt
Từ khóa
Tài liệu tham khảo
Agnetis, A., Hall, N.G. & Pacciarelli, D. (2006). Supply chain scheduling: sequence coordination. Discrete Applied Mathematics, 154: 2044–2063
Aydinliyim, T. & Vairaktarakis, G.L. (2006). Coordination of outsourcing operations. Working paper
Cai, X., Lee, C.Y. & Vairaktarakis, G.L. (2005). Optimization of processing and delivery decisions involving third-party machines. Nonlinear Analysis, 63: 2269–2278
Chang, Y.C. & Lee, C.Y. (2004). Machine scheduling with job delivery coordination. European Journal of Operational Research, 158: 470–487
Chen, Z.L. & Li, C.L. (2008). Scheduling with subcontracting options. IIE Transactions, 40: 1171–1184
Chen, Z.L. & Pundoor, G. (2006). Order assignment and scheduling in a supply chain. Operations Research, 54: 555–572
Chen, Z.L. & Vairaktarakis, G.L. (2005). Integrated scheduling of production and distribution operations. Management Science, 51: 614–628
Cheng, T.C.E. & Kovalyov, M.Y. (2001). Single supplier scheduling for multiple deliveries. Annals of Operations Research, 107: 51–63
Chung, D., Lee, K., Shin, K. & Park, J. (2005). A new approach to job shop scheduling problems with due date constraints considering operation subcontracts. International Journal of Production Economics, 98: 238–250
Dawande, M., Geismar, H.N., Hall, N.G. & Sriskandarajah, C. (2006). Supply chain scheduling: distribution systems. Production and Operations Management, 15: 243–261
Hall, N.G. & Potts, C.N. (2003). Supply chain scheduling: batching and delivery. Operations Research, 51: 566–584
Hall, N.G. & Potts, C.N. (2005). The coordination of scheduling and batch deliveries. Annals of Operations Research, 135: 41–64
Kreipl, S. & Pinedo, M. (2004). Planning and scheduling in supply chains: an overview of issues in practice. Production and Operations Management, 13: 77–92
Kyparisis, G.J. & Koulamas, C. (2006). A note on makespan minimization in two-stage flexible flow shops with uniform machines. European Journal of Operational Research, 175: 1321–1327
Lee, C.Y. & Vairaktarakis, G.L. (1994). Minimizing makespan in hybrid flowshops. Operations Research Letters, 16: 149–158
Lee, C.Y. & Chen, Z.L. (2001). Machine scheduling with transportation considerations. Journal of Scheduling, 4: 3–24
Lee, C.Y., Leung, J.Y.T. & Yu, G. (2006). Two machine scheduling under disruptions with transportation considerations. Journal of Scheduling, 9: 35–48
Lee, I.S. & Sung, C.S. (2008a). Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed. European Journal of Operational Research, 186: 931–952
Lee, I.S. & Sung, C.S. (2008b). Single machine scheduling with outsourcing allowed. International Journal of Production Economics, 101: 623–634
Lee, Y.H., Jeong, C.S. & Moon, C. (2002). Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering, 43: 351–374
Lenstra, J.K., Rinnooy Kan, A.H.G. & Brucker, P. (1977). Complexity of machine scheduling problems. Annuals of Discrete Mathematics, 1: 343–362
Li, C.L. & Xiao, W.Q. (2004). Lot streaming with supplier-manufacturer coordination. Naval Research Logistics, 51: 522–542
Li, C.L., Vairaktarakis, G.L. & Lee, C.Y. (2005). Machine scheduling with deliveries to two customer locations. European Journal of Operational Research, 164: 39–51
Oguz, C. & Ercan, M. (2005). A genetic algorithm for hybrid flow-shop scheduling ith multiprocessor tasks. Journal of Scheduling, 8: 323–351
Qi, X. (2005). A logistics scheduling model: inventory cost reduction by batching. Naval Research Logistics, 52: 312–320
Qi, X. (2006). A logistics scheduling model: scheduling and transshipment for two processing centers. IIE Transactions, 38: 609–618
Qi, X. (2008). Coordinated logistics scheduling for in-house production and outsourcing. IEEE Transactions on Automation Science and Engineering, 5: 188–192
Ruiz-Torres, A.J., Ho, J.C. & Lopez, F.J. (2006). Generating Pareto schedules with outsource and internal parallel resources. International Journal of Production Economics, 103: 810–825
Sundararaghavan, P.S., Kunnathur, A.S. & Viswanathan, I. (1997). Minimizing makespan in parallel flowshops. Journal of the Operational Research Society, 48: 834–842
Tang, L., Xuan, H. & Liu, J. (2006). A new Lagrangian relaxation algorithm for hybrid lowshop scheduling to minimize total weighted completion time. Computers & Operations Research, 33: 3344–3359
Vairaktarakis, G.L. (2006a). Non-cooperative outsourcing games. Working paper
Vairaktarakis, G.L. (2006b). Cooperative strategies for manufacturing planning with negotiable third-party capacity. Working paper.