The use of railway simulation as an input to economic assessment of timetables

Journal of Rail Transport Planning and Management - Tập 6 - Trang 255-270 - 2016
Jennifer Warg1, Markus Bohlin1
1Department of Transport Science, Royal Institute of Technology (KTH), 100 44, Stockholm, Sweden

Tài liệu tham khảo

Abril, 2008, An assessment of railway capacity, Transp. Res. Part E, 44, 774, 10.1016/j.tre.2007.04.001 Andersson, 2013, Quantifying railway timetable robustness in critical points, J. Rail Transp. Plan. Manag., 3, 95 Beaud, 2012, Value of travel time reliability: two alternative measures, Procedia - Soc. Behav. Sci., Volume 54, 349, 10.1016/j.sbspro.2012.09.754 Becker, 1965, A theory of the allocation of time, Econ. J., 75, 493, 10.2307/2228949 Bergström, 2013 Börjesson, 2014, Experiences from the Swedish value of time, Transp. Res. Part A Policy Pract., 59, 144, 10.1016/j.tra.2013.10.022 Börjesson, 2011, On the use of ‘‘average delay’’ as a measure of train reliability, Transp. Res. Part A Policy Pract., 45, 171, 10.1016/j.tra.2010.12.002 Cui, 2016, Calibration of disturbance parameters in railway operational simulation based on reinforcement learning, J. Rail Transp. Plan. Manag., 6, 1 Eijgenraam, 2000 Finger, 2012 Fosgerau, 2008 Frank, 2013 Goverde, 2013, Railway line capacity consumption of different railway signaling systems under scheduled and disturbed conditions Intraplan Consult GmbH, 2006 Lindfeldt, 2015 Lindfeldt, 2009, Validation of a simulation model for mixed traffic on Swedish double-track railway line Mátrai, 2012 Nicholson, 2015, Benchmarking and evaluation of railway operations performance, J. Rail Transp. Plan. Manag., 5, 274 OECD, 2010 Passenger Focus, 2010 Paulley, 2006, The demand for public transport: the effects of fares, quality of service, income and car ownership, Transp. Policy, 13, 295, 10.1016/j.tranpol.2005.12.004 Paulin, 2011 Pérez Herrero, 2014, The social cost of rail capacity constraint Pouryousef, 2015, Hybrid simulation approach for improving railway capacity and train schedules, J. Rail Transp. Plan. Manag., 5, 211 Radtke, 2001, Handling of railway operation problems with RailSys Rmcon, 2015 Sipilä, 2011 Sipilä, 2015 Staav, 2014 Törnquist Krasemann, 2014 TOI, 2010 Trafikverket, 2013 Trafikverket, 2014, Kapacitetsanalys Alingsås – Göteborg, Fastställd Kapacitetsanalys i enlighet Med. Järnvägslagen, 2004, 519 Trafikverket, 2014 Trafikverket, 2014 Trafikverket, 2015 Trafikverket, 2016 Vromans, 2006, Reliability and heterogeneity of railway services, Eur. J. Oper. Res., 172, 647, 10.1016/j.ejor.2004.10.010 Wardman, 2014, Travel time reliability: a review of late time valuations, elasticities and demand impacts in the passenger rail market in Great Britain, Transportation, 41, 1041, 10.1007/s11116-014-9526-5 Warg, 2013, Economic evaluation of capacity with simulations www.SJ.se. www.Trafikverket.se.