Surgical site infections in patients who undergo radical cystectomy: Excess mortality, stay prolongation and hospital cost overruns

Actas Urológicas Españolas (English Edition) - Tập 39 - Trang 210-216 - 2015
E. Gili-Ortiz1, R. González-Guerrero1, L. Béjar-Prado2, J. López-Méndez2,3, G. Ramírez-Ramírez2,3
1Servicio de Anestesiología y Bloque Quirúrgico, Hospital Universitario Virgen Macarena, Sevilla, Spain
2Departamento de Medicina Preventiva y Salud Pública, Facultad de Medicina, Universidad de Sevilla, Sevilla, Spain
3Servicio de Medicina Preventiva y Salud Pública, Hospital Universitario Virgen Macarena, Sevilla, Spain

Tài liệu tham khảo

Knap, 2004, Early and late treatment related morbidity following radical cystectomy, Scand J Urol Nephrol, 38, 153, 10.1080/00365590310020060 Konety, 2006, Complications after radical cystectomy: analysis of population-based data, Urology, 68, 58, 10.1016/j.urology.2006.01.051 Shabsigh, 2009, Defining early morbidity of radical cystectomy for patients with bladder cancer using a standardized reporting methodology, Eur Urol, 55, 164, 10.1016/j.eururo.2008.07.031 Kim, 2012, Contemporary trends of in-hospital complications and mortality for radical cystectomy, Brit J Urol, 110, 1163, 10.1111/j.1464-410X.2012.10990.x Richards, 2013, Perioperative outcomes in radical cystectomy: how to reduce morbidity, Curr Opin Urol, 23, 456, 10.1097/MOU.0b013e32836392bb Kim, 2012, The implications of hospital acquired adverse events on mortality, length of stay and costs for patients undergoing radical cystectomy for bladder cancer, J Urol, 187, 2011, 10.1016/j.juro.2012.01.077 Davies, 2009, Effect of poscystectomy infectious complications on cost, length of stay, and mortality, Urology, 73, 598, 10.1016/j.urology.2008.09.080 Pérez Arbej, 2010, Infección de herida quirúrgica en pacientes urológicos. Revisión de los casos registrados en 4 años, Actas Urol Esp, 34, 258, 10.1016/j.acuro.2010.01.014 Hu, 2014, Sharpening the focus on causes and timing of readmission after radical cystectomy for bladder cancer, Cancer, 120, 1409, 10.1002/cncr.28586 Ministerio de Sanidad, Servicios Sociales e Igualdad, 2012 Charlson, 1987, A new method of classifying prognostic comorbidity in longitudinal studies: development and validation, J Chronic Dis, 40, 373, 10.1016/0021-9681(87)90171-8 Quan, 2005, Coding algorithms for defining comorbidities in ICD-9-CM and ICD-10 administrative data, Med Care, 43, 1130, 10.1097/01.mlr.0000182534.19832.83 Gili-Miner, 2014, Alcohol use disorders among surgical patients: unplanned 30-days readmissions, length of hospital stay, excessive costs and mortality, Drug Alcohol Depend, 137, 55, 10.1016/j.drugalcdep.2014.01.009 De Wit, 2012, Health care-associated infections in surgical patients undergoing elective surgery: are alcohol use disorders a risk factor?, J Am Coll Surg, 215, 229, 10.1016/j.jamcollsurg.2012.04.015 Rothman, 2008 Iezzoni, 1997, Dimensions of risk, 43 Gore, 2012, Hospital-level variation in the quality of urologic cancer surgery, Cancer, 118, 987, 10.1002/cncr.26373 Rosenbaum, 1985, Constructing a control group using multivariate matched sampling methods that incorporate the propensity score, Am Stat, 39, 33 Zhan, 2003, Excess length of stay, charges, and mortality attributable to medical injuries during hospitalization, J Am Med Assoc, 290, 1868, 10.1001/jama.290.14.1868 Asensio, 2014, Infección de la localización quirúrgica. Profilaxis antimicrobiana en cirugía, Enferm Infecc Microbiol Clin, 32, 48, 10.1016/j.eimc.2013.11.003 Haynes, 2009, A surgical safety checklist to reduce morbidity and mortality in a global population, N Engl J Med, 360, 491, 10.1056/NEJMsa0810119 Horan, 2004, Surveillance of nosocomial infections, 1659 Goto, 2014, Accuracy of administrative code data for the surveillance of healthcare-associated infections: a systematic review and meta-analysis, Clin Infect Dis, 58, 688, 10.1093/cid/cit737 Powell, 2003, Using routine comparative data to assess the quality of healthcare: understanding and avoiding common pitfalls, Qual Saf Health Care, 12, 122, 10.1136/qhc.12.2.122 Needham, 2005, A systematic review of the Charlson comorbidity index using Canadian administrative databases: a perspective on risk adjustment in critical care research, J Crit Care, 20, 12, 10.1016/j.jcrc.2004.09.007 Kirby, 2009, Prevention of surgical site infection, Surg Clin N Am, 89, 365, 10.1016/j.suc.2009.01.001 Sorensen, 2012, Wound healing and infection in surgery. The clinical impact of smoking and smoking cessation: a systematic review and meta-analysis, Arch Surg, 147, 373, 10.1001/archsurg.2012.5 Villalbí, 2014, Políticas para prevenir los daños causados por el alcohol, Rev Esp Salud Pública, 88, 515, 10.4321/S1135-57272014000400006 Cerantola, 2013, Guidelines for perioperative care after radical cystectomy for bladder cancer: Enhanced Recovery After Surgery (ERAS) society recommendations, Clin Nutr, 32, 879, 10.1016/j.clnu.2013.09.014 Patel, 2014, Enhanced recovery after surgery: are we ready, and can we afford not to implement these pathways for patients undergoing radical cystectomy, Eur Urol, 65, 263, 10.1016/j.eururo.2013.10.011