Optimal use of the SCE-UA global optimization method for calibrating watershed models
Tài liệu tham khảo
Baffaut, 1989, Expert system for calibrating SWMM, J. Water Resour. Planning Manage., 115, 278, 10.1061/(ASCE)0733-9496(1989)115:3(278)
Burnash, 1973
Duan, 1988, A maximum likelihood criterion for use with data collected at unequal time intervals, Water Resour. Res., 24, 1163, 10.1029/WR024i007p01163
Gupta, 1983, Uniqueness and observability of conceptual rainfall-runoff model parameters: the percolation process examined, Water Resour. Res., 19, 269, 10.1029/WR019i001p00269
Harlin, 1991, Development of a process oriented calibration scheme for the HBV hydrological model, Nordic Hydrol., 22, 15, 10.2166/nh.1991.0002
Hendrickson, 1988, Comparison of Newton-type and direct search algorithms for calibration of conceptual rainfall-runoff models, Water Resour. Res., 24, 691, 10.1029/WR024i005p00691
Holland, 1975
Ibbitt, 1972, Effects of random data errors on the parameter values for a conceptual model, Water Resour. Res., 8, 70, 10.1029/WR008i001p00070
Ibbitt, 1984, Model parameter consistency and fitting criteria, Vol. 4, 153
Johnston, 1976, Parameter optimization for watershed models, Water Resour. Res., 12, 477, 10.1029/WR012i003p00477
Manetsch, 1990, Towards efficient global optimization in large dynamic systems—adaptive complex method, IEEE Trans. Syst. Man Cybernet., 20, 257, 10.1109/21.47827
Nelder, 1965, A Simplex method for function minimization, Comput. J., 7, 308, 10.1093/comjnl/7.4.308
Pickup, 1977, Testing the efficiencies of algorithms and strategies for automatic calibration of rainfall-runoff models, Hydrogeol. Sci. Bull., 22, 257, 10.1080/02626667709491716
Price, 1983, Global optimization by controlled random search, J. Optimization Theory Appl., 40, 333, 10.1007/BF00933504
Pronzato, 1984, A general purpose global optimizer: implementation and applications, Math. Comput. Simulation, 26, 412, 10.1016/0378-4754(84)90105-8
Restrepo-Posada, 1982, Automatic parameter estimation of a large conceptual rainfall-runoff model: a maximum likelihood approach, 330
Sorooshian, 1980, Stochastic parameter estimation procedures for hydrologic rainfall-runoff models: correlated and heteroscedastic error cases, Water Resour. Res., 16, 430, 10.1029/WR016i002p00430
Sorooshian, 1983, Automatic calibration of conceptual rainfall-runoff models: the question of parameter observability and uniqueness, Water Resour. Res., 19, 251, 10.1029/WR019i001p00251
Sorooshian, 1985, The analysis of structural identifiability: theory and application to conceptual rainfall-runoff models, Water Resour. Res., 21, 487, 10.1029/WR021i004p00487
Sorooshian, 1983, Evaluation of maximum likelihood parameter estimation techniques for conceptual rainfall-runoff models—influence of calibration data variability and length on model credibility, Water Resour. Res., 19, 251, 10.1029/WR019i001p00251
Sorooshian, 1993, Calibration of conceptual rainfall-runoff models using global optimization: application to the Sacramento soil moisture accounting model, Water Resour. Res., 29, 1185, 10.1029/92WR02617
Troutman, 1985, Errors and parameter estimation in precipitation-runoff modeling: I. Theory, Water Resour. Res., 21, 1195, 10.1029/WR021i008p01195
Troutman, 1985, Errors and parameter estimation in precipitation-runoff modeling: II. Case study, Water Resour. Res., 21, 1214, 10.1029/WR021i008p01214
Wang, 1991, The genetic algorithm and its application to calibrating conceptual rainfall-runoff models, Water Resour. Res., 27, 2467, 10.1029/91WR01305