Managing public transport: Commercial profitability and social service
Tài liệu tham khảo
Barret, 1979, The National Bus Company “MAP” Market Analysis Project, Traffic Engng & Control, 20, 471
Bird, 1981, Analysis of six techniques to identify need for public transport
Bland, 1982, The “LUTE” land-use and transportation model
Bly, 1976, Depleted bus services: the effect of rescheduling
Bly, 1974, Optimisation of a simple model bus network
Bly, 1985, Relationships between public transport subsidies and fares, service, costs and productivity
Bly, 1986, An analytic assessment of subsidies to bus services, Transpn. Sci., 20, 200, 10.1287/trsc.20.3.200
Buchanan, 1985, The deregulation of buses: lessons and questions from Pirates, 1
Cervero, 1984, Examining the performance impacts of transit operating subsidies, J. Transpn. Engng., 110, 467, 10.1061/(ASCE)0733-947X(1984)110:5(467)
Chartered Institute of Public Finance and Accountancy, 1974
Command 9300, 1984
Dasgupta, 1985, Factors affecting mode choice for the work journey: a Manchester/Sheffield comparison
Department of Transportation, 1977, Urban mass transportation industry uniform system of accounts and records and reporting system, DOT Urban Mass Transportation Administration Report UMTA-IT-06-0094-77-1
Fairhead, 1984, Deregulation of bus services in the trial areas 1981–1984
Fairhurst, 1979, Bus service levels, waiting times and patronage
Gault, 1979, Measurement of the performance of bus services, University of Newcastle-upon-Tyne Transport Operations Research Group, Research Report 28
Glaister, 1985, Competition on an urban bus route, J. Transpn. Econ. Pol., 19, 65
Glaister, 1978, Theory and practice of maximising passenger miles, J. Transpn. Econ. Pol., 12, 304
Goldsack, 1984, Fare collection: the automatic answer, Mass Transit, 11
Haywood, 1980, The West Midlands continuous on-bus survey—how the data is used
Higginson, 1985, The London Regional Transport Act, 1984: a model for public transport in the 1980's, 57
Higginson, 1982, The efficiency of British urban bus operators, Polytechnic of Central London Report
Institute of Transportation Engineers, 1982, Measuring transit system productivity and performance, Report of ITE Committee 6F-22. ITE Journal, 52, 24
Kemp, 1981, Bus costing information in short-range planning: survey of principles and practice, Transpn. Res. Rec., 799, 28
Kilvington, 1986, Testing a technique for the assessment of accessibility problems in rural areas: a study in the Breckland district of Norfold
Lynam, 1974, Application of CRISTAL to evaluate changes in travel charges in London
Mayworm, 1981, Patronage impacts of changes in transit fares and service, Department of Transportation Report DOT-UT-90014
Mellor, 1985, Electronic ticketing systems, Polytechnic of Central London Report
Miller, 1980, The use of performance-based methodologies for the allocation of transit operating funds, Traffic Quarterly, 34, 555
Nash, 1978, Management objectives in bus transport, J. Transp. Econ. Pol., 12
OECD, 1978
Oldfield, 1979, Model for estimating effects of fares, traffic restraint and bus priority in Central London
Oldfield, 1985, Using smaller buses in Central London
Pickerell, 1985, Rising deficits and the uses of transit subsidies in the US, J. Transp. Econ. Pol., 19, 281
Pucher, 1983, Impacts of subsidies on the costs of urban public transport, J. Transp. Econ. Pol., 17, 155
Rock, 1982, Applying S-index to transportation financing alternatives, Transpn. Res. Rec., 858, 36
Ruhl, 1985, Monitoring fares policy in the Netherlands, 95
Walters, 1979, The benefits of minibuses, J. Transp. Econ. Pol., 13, 320
Webster, 1976, Fare structure for bus stage services
Webster, 1982, The importance of cost minimisation in public transport
Webster, 1986, Transport in towns: some of the options, J. Transp. Econ. Pol.
1980
Webster, 1985