Key indicators for evaluating the performance of construction companies from the perspective of owners and consultants

Results in Engineering - Tập 15 - Trang 100596 - 2022
Momen M.A. Abu Oda1, Bassam A. Tayeh1, S.A. Alhammadi2, Yazan I. Abu Aisheh3
1Civil Engineering Department, Faculty of Engineering, Islamic University of Gaza, P.O. Box 108, Gaza Strip, Palestine
2Princess Nourah Bint Abdulrahman University, P.O. Box 84428, Riyadh, 11671, Saudi Arabia
3Department of Civil Engineering, Middle East University, Amman 11831, Jordan

Tài liệu tham khảo

Enshassi, 2010, Subcontractor prequalification practices in Palestine, International Journal of Construction Management, 10, 45, 10.1080/15623599.2010.10773154 Tayeh, 2018, Factors affecting the success of construction projects in Gaza Strip, Open Civ. Eng. J., 12, 10.2174/1874149501812010301 El-Hallaq, 2016, Strategic planning in construction companies in Gaza strip, Journal of Engineering Research and Technology, 2 Chandra, 2021, Evaluating the effect of key performance indicators of vaccine supply chain on sustainable development of mission indradhanush: a structural equation modeling approach, Omega, 101, 10.1016/j.omega.2020.102258 Abiodun, 2017, Factors affecting contractors' performance in construction project delivery in Akure, Ondo State, Nigeria, Journal of Knowledge Management Economics Information Technology, 7, 1 Jari, 2013, To study critical factors necessary for a successful construction project, Int. J. Innovative Technol. Explor. Eng., 2, 331 Kasabreh, 2021, Investigating the impact of contractor's performance on the success of Jordanian residential construction projects, International journal of construction management, 21, 468, 10.1080/15623599.2018.1560547 Hany Abd Elshakour, 2013, Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia, Journal of King Saud University-Engineering Sciences, 25, 125, 10.1016/j.jksues.2012.03.002 Butcher, 2010 Sweis, 2014, Factors affecting contractor performance on public construction projects, Life Sci. J., 11, 28 Ur Rehman, 2022, A multi-facet BIM based approach for Green Building design of new multi-family residential building using LEED system, International Journal of Construction Management, 1 Masood, 2022, A systematic review on supply chain management in prefabricated house-building research, Buildings, 12, 40, 10.3390/buildings12010040 Naji, 2022, An adaptive neurofuzzy inference system for the assessment of change order management performance in construction, J. Manag. Eng., 38, 10.1061/(ASCE)ME.1943-5479.0001017 Dani, 2022, A comparative study on the life cycle assessment of New Zealand residential buildings, Buildings, 12, 50, 10.3390/buildings12010050 Enshassi, 2012, Analysis of contractors performance in Gaza strip construction projects, International Journal of Construction Management, 12, 65, 10.1080/15623599.2012.10773191 Alhammadi, 2021, Occupational health and safety practice in infrastructure projects, Int. J. Occup. Saf. Ergon., 1 Abu Aisheh, 2021, Health and safety improvement in construction projects: a lean construction approach, Int. J. Occup. Saf. Ergon., 1 Maliha, 2021, Safety barriers identification, classification, and ways to improve safety performance in the architecture, engineering, and construction (AEC) industry: review study, Sustainability, 13, 3316, 10.3390/su13063316 Kasabreh, 2019, Investigating the impact of contractor's performance on the success of Jordanian residential construction projects, International Journal of Construction Management, 21, 468, 10.1080/15623599.2018.1560547 Tayeh, 2019, Contractors' attitudes towards the factors affecting sustainability performance: evidence from Palestine, Business Strategy & Development, 2, 173, 10.1002/bsd2.51 Enshassi, 2012, Major causes of problems between contractors and subcontractors in the Gaza Strip, Journal of Financial Management of Property and Construction, 10.1108/13664381211211064 Edwards, 2005, Developing a municipal performance‐measurement system: reflections on the Atlanta Dashboard, Publ. Adm. Rev., 65, 369, 10.1111/j.1540-6210.2005.00461.x Radujković, 2010, Application of key performance indicators in South‐Eastern European construction, J. Civ. Eng. Manag., 16, 521, 10.3846/jcem.2010.58 Heravi, 2012 Toor, 2010, Beyond the ‘iron triangle’: stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects, Int. J. Proj. Manag., 28, 228, 10.1016/j.ijproman.2009.05.005 Babu, 2015, Critical success factors influencing performance of construction projects, International Journal of Innovative Research in Science, Engineering Technology, 4, 3285 Doloi, 2011, Structural equation model for assessing impacts of contractor's performance on project success, Int. J. Proj. Manag., 29, 687, 10.1016/j.ijproman.2010.05.007 Chan, 2001 Polit, 2014, vol. 8 LoBiondo-Wood, 1997 C.A. Moser, G. Kalton, Survey Methods in Social Investigation, second ed., Gower Publishing, Vermont USA1971. Rankin, 2008, Initial metrics and pilot program results for measuring the performance of the Canadian construction industry, Can. J. Civ. Eng., 35, 894, 10.1139/L08-018 Lam, 2021, Performance evaluation of construction companies using integrated entropy–fuzzy VIKOR model, Entropy, 23, 320, 10.3390/e23030320 Hamad, 2021, Critical factors affecting the success of construction projects in Oman, J. Sustain. Architect. Civ. Eng., 29, 121, 10.5755/j01.sace.29.2.29269 Skibniewski, 2009, Determination of key performance indicators with enterprise resource planning systems in engineering construction firms, J. Construct. Eng. Manag., 135, 965, 10.1061/(ASCE)0733-9364(2009)135:10(965) Michell, 2007, Stakeholder perceptions of contractor time, cost and quality management on building projects, 231 Samson, 2002 Ahmed, 2022, Evaluation of construction companies performance by using stepwise weight assessment ratio analysis, Period. Eng. Nat. Sci., 10, 253 Alarcón, 2001, Learning from collaborative benchmarking in the construction industry Roberts, 2009, KPIs in the UK's construction industry: using system dynamics to understand underachievement, Revista de la Construcción, 8, 69 Stanitsas, 2021, Integrating sustainability indicators into project management: the case of construction industry, J. Clean. Prod., 279, 10.1016/j.jclepro.2020.123774 Ugwu, 2007, Key performance indicators and assessment methods for infrastructure sustainability—a South African construction industry perspective, Build. Environ., 42, 665, 10.1016/j.buildenv.2005.10.018 Mahfuth, 2020 Tayeh, 2019, Factors affecting defects occurrence in structural design stage of residential buildings in Gaza Strip, Open Civ. Eng. J., 13, 10.2174/1874149501913010129 Pheng, 2006, Environmental factors and work performance of project managers in the construction industry, Int. J. Proj. Manag., 24, 24, 10.1016/j.ijproman.2005.06.001 Tayeh, 2020, Project manager interventions in occupational health and safety during the pre-construction phase in the Gaza Strip, Open Civ. Eng. J., 14, 10.2174/1874149502014010020 Chan, 2017 Abu Aisheh, 2021, Barriers of occupational safety implementation in infrastructure projects: gaza Strip case, Int. J. Environ. Res. Publ. Health, 18, 3553, 10.3390/ijerph18073553 Alhammadi, 2021, Risk management strategies in construction organizations, Open Civ. Eng. J., 15, 10.2174/1874149502115010406 Tayeh, 2020, Risk factors affecting the performance of construction projects in gaza strip, Open Civ. Eng. J., 14, 10.2174/1874149502014010094 Sadeh, 2000, The role of contract type in the success of R&D defense projects under increasing uncertainty, Proj. Manag. J., 31, 14, 10.1177/875697280003100303 Tayeh, 2020, Factors affecting sustainability performance during the construction stage in building projects-consultants’ perspective, Open Construct. Build Technol. J., 14 Nudurupati, 2007, Performance measurement in the construction industry: an action case investigating manufacturing methodologies, Comput. Ind., 58, 667, 10.1016/j.compind.2007.05.005 Wang, 2010, Bi-level framework for measuring performance to improve productivity of construction enterprises, 970 Yu, 2007, Comparable performance measurement system for construction companies, J. Manag. Eng., 23, 131, 10.1061/(ASCE)0742-597X(2007)23:3(131) Dissanayaka, 1998, Comparing contributors to time and cost performance in building projects, Build. Environ., 34, 31, 10.1016/S0360-1323(97)00068-1 Wong, 2004, Contractor performance prediction model for the United Kingdom construction contractor: study of logistic regression approach, J. Construct. Eng. Manag., 130, 691, 10.1061/(ASCE)0733-9364(2004)130:5(691)