Incremental bus service design: combining limited-stop and local bus services
Tóm tắt
Từ khóa
Tài liệu tham khảo
Ceder A (1989) Optimal design of transit short-turn trips. Transp Res Rec 1221:8–22. http://trid.trb.org/view.aspx?id=308479
Ceder A (2007) Public transit planning and operation: theory, modelling and practice. Elsevier, Butterworth-Heinemann
Ceder A, Stern H (1981) Deficit function bus scheduling with deadheading trip insertions for fleet size reduction. Transp Sci 15(4):338–363. doi: 10.1287/trsc.15.4.338 . http://transci.journal.informs.org/cgi/content/abstract/15/4/338
Ceder A, Wilson N (1986) Bus network design. Transp Res, Part B, Methodol 20(4):331–344. doi: 10.1016/0191-2615(86)90047-0
Desaulniers G, Hickman M (2007) Public transit. In: Barnhart C, Laporte G (eds) Transportation, handbooks in operations research and management science, vol 14. Elsevier, Amsterdam, pp 69–127. Chap. 2. doi: 10.1016/S0927-0507(06)14002-5
Furth P (1985) Alternating deadheading in bus route operations. Transp Sci 19(1):13–28. doi: 10.1287/trsc.19.1.13
Furth P (1986) Zonal route design for transit corridors. Transp Sci 20(1):1–12. doi: 10.1287/trsc.20.1.1 . http://transci.journal.informs.org/cgi/content/abstract/20/1/1
Furth P (1987) Short turning on transit routes. Transp Res Rec 1108:42–52. http://trid.trb.org/view.aspx?id=288816
Guihaire V, Hao J (2008) Transit network design and scheduling: a global review. Transp Res, Part A, Policy Pract 42(10):1251–1273. doi: 10.1016/j.tra.2008.03.011
Jordan W, Turnquist M (1979) Zone scheduling of bus routes to improve service reliability. Transp Sci 13(3):242–268. doi: 10.1287/trsc.13.3.242
Larrain H, Giesen R, Muñoz J (2010) Choosing the right express services for bus corridor with capacity restrictions. Trans Res Rec: J Trans Res Board 2197:63–70. doi: 10.3141/2197-08
Leiva C, Muñoz J, Giesen R, Larrain H (2010) Design of limited-stop services for an urban bus corridor with capacity constraints. Transp Res, Part B, Methodol 44(10):1186–1201. doi: 10.1016/j.trb.2010.01.003
Schwarcz S (2004) Service design for heavy demand corridors: limited-stop bus service. Master thesis, Massachusetts Institute of Technology
Scorcia H (2010) Design and evaluation of BRT and limited-stop services. Master thesis, Massachusetts Institute of Technology
Tétreault P, El-Geneidy A (2010) Estimating bus run times for new limited-stop service using archived AVL and APC data. Transp Res, Part A, Policy Pract 44(6):390–402. doi: 10.1016/j.tra.2010.03.009
Transportation Research Board (2002) Estimating the benefits and costs of public transit projects: a guidebook for practitioners. TCRP Report 78
Transportation Research Board (2007) Bus rapid transit practitioner’s guide. TCRP report 118