Exploring the rate of adoption and implementation depth of building information modeling (BIM): A case of Kuwait
Tài liệu tham khảo
Abdulfattah, 2023, Predicting implications of design changes in BIM-based construction projects through machine learning, Autom. Constr., 155, 10.1016/j.autcon.2023.105057
Abdulfattah, 2017, Lack of BIM training: Investigating practical solutions for the state of Kuwait, Int. J. Civ. Environ. Eng., 11, 1106
Al Tabtabai, H.M. (2002). Causes for delays in construction projects in Kuwait.
Alshammari, 2020, Project Manager’s Skills for improving the performance of complex projects in Kuwait Construction Industry: A Review, Vol. 713
Alyatama, M. (2021). Application of Agile Project Management in Kuwait Oil and Gas Capital Projects (Doctoral dissertation, University of Northampton).
Amer, 2021, Automated methods and systems for construction planning and scheduling: Critical review of three decades of research, J. Constr. Eng. Manag., 147, 10.1061/(ASCE)CO.1943-7862.0002093
Arshad, 2019, Contractual risks of building information modeling: Toward a standardized legal framework for design-bid-build projects, J. Constr. Eng. Manag., 145, 10.1061/(ASCE)CO.1943-7862.0001617
Ashkanani, 2023, Gaps in megaproject management system literature: a systematic overview, Eng., Constr. Archit. Manag., 30, 1300, 10.1108/ECAM-12-2021-1113
Atabay, 2020, Incorporating BIM and Green Building in Engineering Education: Assessment of a school building for LEED Certification, Pract. Period. Struct. Des. Constr., 25, 10.1061/(ASCE)SC.1943-5576.0000528
Baffoe, 2019, Exploring the utility of Analytic Hierarchy Process (AHP) in ranking livelihood activities for effective and sustainable rural development interventions in developing countries, Eval. Program Plan., 72, 197, 10.1016/j.evalprogplan.2018.10.017
Becerik-Gerber, 2010, Building information modeling in architecture, engineering, and construction: Emerging research directions and trends, J. Prof. Issues Eng. Educ. Pract., 136, 139, 10.1061/(ASCE)EI.1943-5541.0000023
Boje, 2020, Towards a semantic Construction Digital Twin: Directions for future research, Autom. Constr., 114, 10.1016/j.autcon.2020.103179
Boton, 2015, The challenge of level of development in 4D/BIM simulation across AEC project lifecycle. A case study, Procedia Eng., 123, 59, 10.1016/j.proeng.2015.10.058
Bryde, 2013, The project benefits of building information modeling (BIM), Int. J. Proj. Manag., 31, 971, 10.1016/j.ijproman.2012.12.001
Büchmann-Slorup, 2010, BIM-based scheduling of Construction–A comparative analysis of prevailing and BIM-based scheduling processes, Proc., 27th Int. Conf. CIB W78, 113
Crowther, 2021, Impacts of 4D BIM on construction project performance, Int. J. Constr. Manag., 21, 724
Gholizadeh, 2018, Diffusion of building information modeling functions in the construction industry, J. Manag. Eng., 34, 04017060, 10.1061/(ASCE)ME.1943-5479.0000589
Hackshaw, 2008, Small studies: strengths and limitations, Eur. Respir. J., 32, 1141, 10.1183/09031936.00136408
Hartmann, 2012, Model-based scheduling for construction planning, 14th Int. Conf. Comput. Civ. Build. Eng., 27
Jung, 2016, Slim BIM charts for rapidly visualizing and quantifying levels of BIM adoption and implementation, J. Comput. Civ. Eng., 30, 04015072, 10.1061/(ASCE)CP.1943-5487.0000554
Kamel, 2019, Review of BIM's application in energy simulation: Tools, issues, and solutions, Autom. Constr., 97, 164, 10.1016/j.autcon.2018.11.008
Kaswan, 2023, Green lean six sigma sustainability–oriented project selection and implementation framework for manufacturing industry, Int. J. Lean Six. Sigma, 14, 33, 10.1108/IJLSS-12-2020-0212
Keskin, 2022, Architecting a BIM-based digital twin platform for airport asset management: a model-based system engineering with SysML approach, J. Constr. Eng. Manag., 148, 10.1061/(ASCE)CO.1943-7862.0002271
Koushki, 2005, Delays and cost increases in the construction of private residential projects in Kuwait, Constr. Manag. Econ., 23, 285, 10.1080/0144619042000326710
Kreider, 2013, The uses of BIM: Classifying and selecting BIM uses, Pa. State Univ., 0
Kuwait National Development Plan (Internet). (n.d.) cited 2020 Aug 16]. Available from: 〈http://www.newkuwait.gov.kw/plan.aspx〉.
Liu, 2019, Towards comprehensive support for business process behavior similarity measure, IEICE Trans. Inf. Syst., 102, 588, 10.1587/transinf.2018EDP7127
Marzouk, 2022, Analysing BIM implementation in the Egyptian construction industry, Eng., Constr. Archit. Manag., 29, 4177, 10.1108/ECAM-07-2020-0523
Matarneh, 2021, Building Information Modeling for facilities management: skills, implementation and teaching map, 73
Memon, 2011, Preliminary study on causative factors leading to construction cost overrun, Int. J. Sustain. Constr. Eng. Technol., 2, 1
Mikulakova, 2010, Knowledge-based schedule generation and evaluation, Adv. Eng. Inform., 24, 389, 10.1016/j.aei.2010.06.010
Mohamed, 2019, SRL-ESA-TextSum: A text summarization approach based on semantic role labeling and explicit semantic analysis, Inf. Process. Manag., 56, 1356, 10.1016/j.ipm.2019.04.003
Mohammed, 2022, Applying BIM to achieve sustainability throughout a building life cycle towards a sustainable BIM model, Int. J. Constr. Manag., 22, 148
Oesterreich, 2019, Behind the scenes: Understanding the socio-technical barriers to BIM adoption through the theoretical lens of information systems research, Technol. Forecast. Soc. Change, 146, 413, 10.1016/j.techfore.2019.01.003
Parsamehr, 2023, A review of construction management challenges and BIM-based solutions: perspectives from the schedule, cost, quality, and safety management, Asian J. Civ. Eng., 24, 353, 10.1007/s42107-022-00501-4
Public Authority for Housing Welfare, 2013
Rasouli, 2019, Intelligent process-aware information systems to support agility in disaster relief operations: a survey of emerging approaches, Int. J. Prod. Res., 57, 1857, 10.1080/00207543.2018.1509392
Ridder, 2017, The theory contribution of case study research designs, Bus. Res., 10, 281, 10.1007/s40685-017-0045-z
Rosenfeld, 2014, Root-cause analysis of construction-cost overruns, J. Constr. Eng. Manag., 140, 04013039, 10.1061/(ASCE)CO.1943-7862.0000789
Saaty, 2008, Decision making with the analytic hierarchy process, Int. J. Serv. Sci., 1, 83
Samimpay, 2020, Benefits of implementing building information modeling (BIM) in infrastructure projects, J. Eng., Proj., Prod. Manag., 10, 123
Seyis, 2019, Pros and cons of using building information modeling in the AEC industry, J. Constr. Eng. Manag., 145, 04019046, 10.1061/(ASCE)CO.1943-7862.0001681
Shahhosseini, 2021, A conceptual framework for developing a BIM-enabled claim management system, Int. J. Constr. Manag., 21, 208
Sigalov, 2017, Recognition of process patterns for BIM-based construction schedules, Adv. Eng. Inform., 33, 456, 10.1016/j.aei.2016.12.003
Sigalov, 2018, 4D BIM model adaptation based on construction progress monitoring, 337
Singh, 2021, BIM-based approach for automatic pipe systems installation coordination and schedule optimization, J. Constr. Eng. Manag., 147, 04021143, 10.1061/(ASCE)CO.1943-7862.0002077
Singh, 2011, Determinants of cost overruns in public procurement of infrastructure: Roads and railways, 97
Tauscher, 2007, Generating construction schedules with case-based reasoning support, Comput. Civ. Eng. (2007), 119, 10.1061/40937(261)15
Wang, 2020, Mapping global research on sustainability of megaproject management: A scientometric review, J. Clean. Prod., 259, 10.1016/j.jclepro.2020.120831
Wang, 2019, Transformation from IT-based knowledge management into BIM-supported knowledge management: A literature review, Expert Syst. Appl., 121, 170, 10.1016/j.eswa.2018.12.017
Wang, 2019, BIM-based draft schedule generation in reinforced concrete-framed buildings, Constr. Innov., 19, 280, 10.1108/CI-11-2018-0094
Xia, 2019, RMSEA, CFI, and TLI in structural equation modeling with ordered categorical data: The story they tell depends on the estimation methods, Behav. Res. Methods, 51, 409, 10.3758/s13428-018-1055-2
Yan, 2010, Fast business process similarity search with feature-based similarity estimation, 60
Yun, 2020, Exploring the missing link between top management team characteristics and megaproject performance, Eng., Constr. Archit. Manag., 27, 1039, 10.1108/ECAM-12-2018-0566