Various optimizers for single‐stage production

Wiley - Tập 3 Số 1-2 - Trang 59-66 - 1956
W.E. Smith

Tóm tắt

Từ khóa


Tài liệu tham khảo

10.1002/nav.3800010110

Jackson J. R. “Scheduling a Production Line to Minimize Maximum Tardiness ” Research Report No. 43 36 pp Management Sciences Research Project University of California Los Angeles.

10.1287/opre.2.4.393

Kuhn H. W. “The Traveling Salesman Problem ” Proceedings of the Sixth Symposium in Applied Mathematics of the American Mathematical Society McGraw‐Hill Book Co.