Trade‐off between maximizing throughput rate and minimizing system time in kanban systems

Emerald - Tập 17 Số 5 - Trang 429-445 - 1997
A.Andijani1
1KFUPM, Dhahran, Saudi Arabia

Tóm tắt

Investigates the trade‐off between the average throughput rate and the average systems time using kanban discipline. Considers a multistage serial production line system with materials in the system controlled by kanban discipline. Presents simulation results to evaluate the production system performance in terms of the average throughput rate and the average system time for a fixed total number of kanbans over a given number of serial workstations. Constructs and compares efficient allocation sets for three and four workstations that are generated by kanban discipline for two processing time distributions, namely, uniform and exponential distributions. Based on the simulation results from three and four work‐stations, develops a general design rule to maximize the average throughput rate and to minimize the average system time. Analyses five and six workstations using the general design rule. Tests the validity of the general design rule by considering five and six workstations with a different number of kanbans. The results show that most of the efficient sets generated by the design rule are identical to those generated by enumerating all combinations of kanban allocations. However, using the general design rule reduces the simulation work tremendously.

Từ khóa


Tài liệu tham khảo

Andijani, A. and Clark, G. (1991, “Kanban allocation to serial production lines in a stochastic environment”, in Satir, A. (Ed.), JIT Manufacturing Systems: Operational Planning and Control Issues, Elsevier, Amsterdam, pp. 175‐90.

Fishman, G.S. (1978, Principles of Discrete Event Simulation, John Wiley & Sons, Inc., New York, NY.

Hall, R.W. (1983, Zero Inventories, Dow Jones‐Irwin, Homewood, IL.

Law, A.M. and Kelton, D.W. (1991, Simulation Modeling and Analysis, McGraw‐Hill, Inc., New York, NY.

Little, J.D.C. (1961, “A proof for the queuing formula: L = λ W”, Operations Research, Vol. 9, pp. 383‐7.

Mitra D. and Mitrani, I. (1990, “Analysis of a kanban discipline for cell coordination in production lines I”, Management Science, Vol. 36, pp. 1548‐66.

Muckstadt, J.A. and Tayur, S.R. (1995, “A comparison of alternative kanban control mechanisms. I. Background and structural results”, IIE Transactions, Vol. 27, pp. 140‐50.

Muckstadt, J.A. and Tayur, S.R. (1995, “A comparison of alternative kanban control mechanisms. II. Experimental results”, IIE Transactions, Vol. 27, pp. 151‐61.

Steuer, R. (1986, Multiple Criteria Optimization: Theory, Computation, and Application, John Wiley & Sons, Inc., New York, NY.

Tayur, S. (1993, “Structural results and a heuristic for kanban control serial lines”, Management Science, Vol. 39, pp. 1347‐68.