Subcontracting within the supply chain for electronics assembly manufacture

Emerald - Tập 17 Số 9 - Trang 827-841 - 1997
M.Webster1, C.Alder2, A.P.Muhlemann1
1Management Centre, University of Bradford, UK
2Electronic Imaging and Media Communications Unit, University of Bradford, UK

Tóm tắt

Discusses issues associated with the subcontracting of manufacturing activity within the supply chain for electronics assembly products. The principal focus of the work is the operational issues surrounding the organization, management and control of the subcontract process, but related issues and research streams are also considered. Some of the operational issues are placed within the context of current practice by presenting case studies of two small to medium‐sized manufacturing enterprises (SMMEs) in the electronics assembly sector which use subcontract manufacture. The approaches of the two companies to the management and control of the process are compared and contrasted, and mapped onto generic models. This work is considered timely because of the increasing importance of the subcontracting of manufacture within the supply chain, and because of the lack of supporting theoretical and practical work. It identifies key issues which need to be addressed by academic researchers and by industry practitioners in the pursuit of world class manufacturing ideals, as part of a process of concentrating on core competencies and expertise.

Từ khóa


Tài liệu tham khảo

1.Webster, M., “Distributed manufacture using subcontracting in the UK Electronics Assembly Industry ‐ a literature review and case studies”, University of Bradford, Department of Electronic and Electrical Engineering Postgraduate Division, Internal report No. 582, November 1995.

2.Probert, D.R., “Make or buy: your route to improved manufacturing performance”, DTI report, 1995.

3.EIA (The Engineering Industries Association), “Make or buy ‐ strategies for optimizing manufacturing capability”, conference held on 4‐5 December 1995, Cavendish Square Conference Centre, London.

4.Thionet, F., “Outsourcing as a key strategy”, Lord Austin Lecture, IEE, Savoy Place, London, 25 May 1995 (abstracted inanufacturing Engineer, October 1995).

5.Dickson, T., “Subcontracting: a specialist route to beat the competition”, Financial Times, 5 August 1989, p. 9.

6.Imrie, R., “‘A strategy of last resort’? Reflections on the role of the subcontract in the United Kingdom”, Omega, International Journal of Management Science, Vol. 22 No. 6, 1994, pp. 569‐78.

7.Thoburn, J.T. and Takashima, M., “Improving British industrial performance: lessons from Japanese subcontracting”, National Westminster Bank Quarterly Review, February 1993, pp. 2‐12.

8.Hewett, W.G., “If outsourcing it is the answer ‐ what is the question?”, IFIP Transactions A ‐ Computer Science and Technology, Vol. 54, 1994, pp. 299‐308.

9.Quinn, J.B., “The intelligent enterprise: a new paradigm”, Academy of Management Executive, November 1992, Vol. 6 No. 4, pp. 48‐64.

10.Kraft, P. and Truex, D., “Postmodern management and information technology in the modern industrial corporation”, IFIP Transactions A ‐ Computer Science and Technology, Vol. 49, 1994, pp. 113‐27.

11.Anonymous, “The rise of the dedicated subcontractor”, Purchasing and Supply Management, March 1994, pp. 26‐9.

12.Eloranta, E., Lehtonen, A. and Tanskanen, K., “Fast flexible and co‐operative supply chains ‐ key issues for the survival of European industry”, Production Planning and Control, Vol. 6 No. 3, 1995, pp. 238‐45.

13.Mulkens, H. and Pithoud, F., “JIT and production management for subcontractors. A deductive and practical approach”, in Pappas, I.A. and Tatsiopoulos, I.P. (Eds), Advances in Production Management Systems, Vol. 13, 1993, pp. 363‐70.

14.Baxter, L.F., Ferguson, N., MacBeth, D.K. and Neil, G.C., “Getting the message across? Supplier quality improvement programmes: some issues in practice”, International Journal of Operations & Production Management, Vol. 9 No. 5, 1989, pp. 69‐76.

15.Morris, J. and Imrie, R., “Japanese style subcontracting ‐ its impact on European industries”, Long Range Planning, Vol. 26 No. 4, 1993, pp. 53‐8.

16.Shenas, D.G. and Derakhshan, S., “Organizational approaches to the implementation of simultaneous engineering”, International Journal of Operations & Production Management, Vol. 14 No. 10, 1994, pp. 30‐44.

17.Ansari, A. and Modaress, B., Just‐in‐time Purchasing, Free Press, New York, 1990.

18.Harrison, B. and Kelley, M.R., “Outsourcing and the search for flexibility”, Work, Employment and Society, Vol. 7 No. 2, 1993, pp. 213‐35.

19.Ravi Kumar, K. and Vannelli, A., “Strategic subcontracting for efficient disaggregated manufacturing”, International Journal of Production Research, Vol. 25 No. 12, 1987, pp. 1715‐28.

20.Shafer, S.M., Kern, G.M. and Wei, J.C., “A mathematical programming approach for dealing with exceptional elements in cellular manufacturing”, International Journal of Production Research, Vol. 30 No. 5, 1992, pp. 1029‐36.

21.Perdue, M., “PCB assemblers propose full‐service contracts”, Electronic Packaging and Production, November 1987, pp. 32‐4.

22.Heywood, J. and Seddon, H., “Manufacturing at arm’s length”, Engineering, October 1988, pp. 495‐6.

23.Annavajhula, J.C.B., “Subcontracting in electronics: a case study of Keltron”, Economic and Political Weekly, 27 August 1988, pp. M103‐M117.

24.Hibbert, E.P., “Global make‐or‐buy decisions”, Industrial Marketing Management, Vol. 22, 1993, pp. 67‐77.

25.Higgins, C., “Everything but your soul? (subcontracting)”, Management, May 1994, Vol. 41 No. 4, pp. 12‐15.

26.Johnson, N., “Horses for courses ‐ the ‘make or buy’ dilemma”, Purchasing and Supply Management, March 1994, pp. 28‐30.

27.Pfeffer, J. and Salacick, G.R., The External Control of Organizations: A Resource Dependence Perspective, Harper & Row, New York, NY, 1978.

28.Emerson, R.E., “Power‐dependence relations”, American Sociological Review, Vol. 27, 1962, pp. 31‐41.

29.Williamson, O.E., The Economic Institutions of Capitalism, The Free Press, New York, NY, 1985.

30.Kachmar, M., “Will subcontractors pass the 22‐cent challenge?”, Microwaves and RF, Vol. 25 No. 7, 1986, pp. 35‐8.

31.Kollock, P., “The emergence of exchange structures: an experimental study of uncertainty, commitment and trust”, American Journal of Sociology, Vol. 100 No. 2, 1994, pp. 313‐45.

32.Nishiguchi, T., Strategic Industrial Sourcing: The Japanese Advantage, Oxford University Press, Oxford, 1994.

33.Richardson, J., “Parallel sourcing and supplier performance in the Japanese automobile industry”, Strategic Management Journal, Vol. 14, 1993, pp. 339‐50.

34.McMillan, J., “Managing suppliers: incentive systems in Japanese and U.S. Industry”, California Management Review, Vol. 32 No. 4, Summer 1990, pp. 38‐55.

35.Granovetter, M., “Economic action and social structure: the problem of embeddedness”, American Journal of Sociology, Vol. 91 No. 3, 1985, pp. 481‐510.

36.Das, S.K., “Master scheduling with incremental capacity allocation and a rolling horizon”, Omega, International Journal of Management Science, Vol. 21 No. 3, 1993, pp. 353‐61.

37.Loerch, A.G. and Muckstadt, J.A., “An approach to production planning and scheduling in cyclically scheduled manufacturing systems”, International Journal of Production Research, Vol. 32 No. 4, 1994, pp. 851‐71.

38. Vercellis, C., “Multi‐criteria models for capacity analysis and aggregate planning in manufacturing systems”, International Journal of Production Economics, Vol. 23, 1991, pp. 261‐72.

39.Ng, E.S.O., Partington, E.C. and Sculli, D., “A computer system for inventory management of lighting products: a case study”, Computers in Industry, Vol. 22 No. 1, June 1993, pp. 71‐9.

40.Semich, J.W., “Information replaces inventory at the virtual corporation”, Datamation, Vol. 40 No. 14, 15 July 1994, pp. 37‐41.

41.Grieve, B. and Schmidt, F., “Integrating subcontract manufacture”, Computer Integrated Manufacturing Systems, Vol. 7 No. 1, 1994, pp. 3‐4.

42.Webster, M., Alder, C. and Muhlemann, A.P., “Scheduling of subcontract manufacture in the supply chain for electronics assembly products”; in Bramley, A.N., Mileham, A.R. and Owen, G.R. (Eds), Advances in Manufacturing Technology X, Proceedings of the 12th National Conference on Manufacturing Research, ISBN 1 85790 031 6, 1996, pp. 386‐90.

43.Baxter, L.F., Ferguson, N., MacBeth, D.K. and Neil, G.C., “Getting the message across? Supplier quality improvement programmes: some issues in practice”, International Journal of Operations & Production Management, Vol. 9 No. 5, 1989, pp. 69‐76.

44.Webster, M., “A survey of issues relating to the development of AI‐based, distributed, advisory resource planning and scheduling tools for manufacturing in SMEs”, University of Bradford, Department of Electronic and Electrical Engineering, Postgraduate Division, Internal report No. 544, April 1994.

45.Webster, M., Muhlemann, A.P. and Alder, C., “Towards virtual manufacturing: the case of the electronics assembly industry”, in Proceedings of the 32nd International MATADOR Conference, Macmillan, Basingstoke, ISBN 0 333 71655 8, 1997.

46.Webster, M. and Alder, C., “Hierarchical scheduling in a distributed electronics manufacturing environment”, in Khan, M.K., Wright, C.S. and Whalley, R. (Eds), Advanced Manufacturing Processes, Systems and Technologies, Mechanical Engineering Publications, ISBN 085 298 989X, 1996, pp. 549‐58.