Robotic Cells with Parallel Machines: Throughput Maximization in Constant Travel-Time Cells
Tóm tắt
Tài liệu tham khảo
Chen, H., C. Chu, and J. Proth, "Cyclic scheduling with time window constraints," IEEE Transactions on Robotics and Automation, 14(1), 144–152 (1998).
Crama, Y., V. Kats, J. van de Klundert, and E. Levner, "Cyclic scheduling in robotic flowshops," Annals of Operations Research, 96, 97–124 (2000).
Kumar, S., N. Ramanan, and C. Sriskandarajah, "Maximizing throughput in large robotic cells," IIE Transactions (to appear).
Lei, L. and T. J.Wang, "Determining optimal cyclic hoist schedules in a single-hoist electroplating line," IIE Transactions, 26(2), 25–33 (1994).