Resource leveling scheduling by an ant colony-based model

Mohsen Garmsiri1, Mohammad Reza Abassi1
1MBA Program, Payame Noor University, Tehran, Iran

Tóm tắt

Từ khóa


Tài liệu tham khảo

Abdallah H, Emara HM, Dorrah HT, Bahgat A: Using ant colony optimization algorithm for solving project management problems. Expert Syst Appl 2009, 36: 10004–10015. 10.1016/j.eswa.2008.12.064

Blum C, Dorigo M: The hyper-cube framework for ant colony optimization. Transactions on Systems, Man and Cybernetics – Part B. Cybernetics 2004,34(2):1161–1172.

Bonabeau E, Dorigo M, Theraulaz G: Swarm intelligence from natural to artificial systems. Oxford University Press, Oxford; 1999.

Buddhakulsomsiri J, Kim DS: Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. Eur J Oper Res 2006, 175: 279–295. 10.1016/j.ejor.2005.04.030

Chen P-H, Weng H: A two-phase GA model for resource-constrained project scheduling. Autom Constr 2009, 18: 485–498. 10.1016/j.autcon.2008.11.003

Chtourou H, Haouari M: A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling. Comput Ind Eng 2008, 55: 183–194. 10.1016/j.cie.2007.11.017

Christodoulou S, Ellinas G, Pooyan A: Entropy-based scheduling of resource-constrained construction projects. Autom Constr 2009, 18: 919–928. 10.1016/j.autcon.2009.04.007

Damaka N, Jarbouia B, Siarryb P, Loukil T: Differential evolution for solving multi-mode resource-constrained project scheduling problems. Comput Oper Res 2009, 36: 2653–2659. 10.1016/j.cor.2008.11.010

Dorigo M, Maniezzo V, Colorni A: Ant system: Optimization by a colony of cooperating agents. IEEE Transactions on Systems, Man, and Cybernetics – Part B 1996,  : 29–41.

Easa SM: Resource leveling in construction by optimization. J Constr Eng Manag 1989, 115: 302–316. 10.1061/(ASCE)0733-9364(1989)115:2(302)

Elazouni AM, Metwally FG: Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management 2007, 133: 86–90. 10.1061/(ASCE)0733-9364(2007)133:1(86)

Gambardella LM, Taillard E, Dorigo M: Ant Colonies for QAP. Technical Report Number: IDSIA 97–4, IDSIA, Lugano, Switzerland; 1997.

He Z, Wang N, Jia T, Xu Y: Simulated annealing and tabu search for multi-mode project payment scheduling. Eur J Oper Res 2009, 198: 688–696. 10.1016/j.ejor.2008.10.005

Jiang G, Shi J: Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management 2005, 131: 986–992. 10.1061/(ASCE)0733-9364(2005)131:9(986)

Kastor A, Sirakoulis K: The effectiveness of resource levelling tools for resource constraint project scheduling problem. Int J Proj Manag 2009, 27: 493–500. 10.1016/j.ijproman.2008.08.006

Kim K, de la Garza JM: Evaluation of the resource-constrained critical path method algorithms. Journal of Construction Engineering and Management 2005, 131: 522–532. 10.1061/(ASCE)0733-9364(2005)131:5(522)

Kim KW, Yun YS, Yoon JM, Gen M, Yamazaki G: Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling. Comput Ind 2005, 56: 143–160. 10.1016/j.compind.2004.06.006

Leu S-S, Yang C-H, Huang J-C: Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. Automation in Construction 2000, 10: 27–41. 10.1016/S0926-5805(99)00011-4

Lova A, Tormos P, Cervantes M, Barber F: An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes. Int J Production Economics 2009, 117: 302–316. 10.1016/j.ijpe.2008.11.002

Moumene K, Ferland JA: Activity list representation for a generalization of the resource-constrained project scheduling problem. Eur J Oper Res 2009, 199: 46–54. 10.1016/j.ejor.2008.10.030

Najafia AA, Niaki STA, Moslem S: A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations. Comput Oper Res 2009, 36: 2994–3001. 10.1016/j.cor.2009.01.016

Pan N-H, Hsaio P-W, Chen K-Y: A study of project scheduling optimization using tabu search algorithm. Eng Appl Artif Intel 2008, 21: 1101–1112. 10.1016/j.engappai.2007.11.006

Ranjbar MR, Kianfar F: Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms. Appl Math Comput 2007, 191: 451–456. 10.1016/j.amc.2007.02.109

Shi JJ, Deng Z: Object-oriented resource-based planning method (ORPM) for construction. Int J Proj Manag 2000, 18: 179–188. 10.1016/S0263-7863(99)00013-7

Van Peteghem V, Vanhoucke M: A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. Eur J Oper Res 2009, 201: 409–418.

Wuliang P, Chengen W: A multi-mode resource-constrained discrete time–cost trade-off problem and its genetic algorithm based solution. Int J Proj Manag 2009, 27: 600–609. 10.1016/j.ijproman.2008.10.009