Prefeasibility study—Geotechnical studies for introducing longwall top coal caving in Indian mines
Tóm tắt
Tài liệu tham khảo
Peng, S.S. and Chiang, H.S., Longwall Mining, New York: Wiley, 1983.
Cai, Y., Hebblewhite, B.K., Onder, U., Xu, B., Kelly, M., Wright, B., and Kraemer, M., Application of Longwall Top Coal Caving to Australian Operations, CSIRO-ACARP Report C11040, 2003.
Balusu, R., Adhikary, D., Khanal, M., Zhou, B., Poulsen, B., Sliwa, R., and Karekal, S., APP Report: Thick Coal Seam Extraction, APP—Coal Mining Task Force, Department of Resources, Energy and Tourism, 2012.
MeSy (India) Pvt. Ltd., In-Situ Stress and Permeability Measurements in Boreholes in the KTK.3 Incline Dipside Block and in the KTK. Longwall Block of Bhupalpalli Area of the Mulug Coal Belt of Warangal District, Andra Pradesh, Report no. SCCL_01/08, 2008.
NIRM, Investigation into In Situ Strength of Coal at GDK-10A Incline and GDK-10 Incline, RG-III Area, SCCL. NIRM Project No. GC-08-01-c, April, 2008.
SCCL, Draft PIB Note of Adriyala Shaft Project, Ramagundam Region, Internal Report, 2006.
Hoek, E. and Brown, E.T., Underground Excavations in Rock. The institution of Mining and Metallurgy, London, 1982.
McNally, G.H., The prediction of Geotechnical Rock Properties from Sonic and Neutron, Logs: Exploration Geophysics, 1990, vol. 21, pp. 65–71.
Zhong, M.J., Theory and Technology of Top Coal Caving Mining, China Coal Industry Publishing House, 2001.
Humphreys, P. and Poulsen, B., BMA-Geological Assessment and Numerical Modeling of LTCC, CSIRO Report, 2008.
Cosserat, E. and Cosserat, F., Theorie des corps deformables, Paris: Hermann, 1909.