Level-Scheduling bei Variantenfließfertigung: Klassifikation, Literaturüberblick und Modellkritik
Tóm tắt
Từ khóa
Tài liệu tham khảo
Aigbedo H (2000) Some structural properties for the just-in-time level schedule problem. Prod Plann Control 11:357–362
Aigbedo H, Monden Y (1996) A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines. Int J Prod Res 34:3107–3124
Aigbedo H, Monden Y (1997) A parametric procedure for multicriterion sequence scheduling for just-in-time mixed-model assembly lines. Int J Prod Res 35:2543–2564
Balakrishnan A, Vanderbeck F (1999) A tactical planning model for mixed-model electronics assembly operations. Oper Res 47:395–409
Balinski M, Shahidi N (1998) A simple approach to the production rate variation problem via axiomatics. Oper Res Lett 22:129–135
Bard JF, Shtub A, Joshi SB (1994) Sequencing mixed-model assembly lines to level parts usage and minimize line length. Int J Prod Res 32:2431–2454
Bautista J, Companys R, Corominas A (1996a) Heuristics and exact algorithms for solving the Monden problem. Eur J Oper Res 88:101–113
Bautista J, Companys R, Corominas A (1996b) A note on the relation between the product rate variantion (PRV) and the apportionment problem. J Oper Res Soc 47:1410–1414
Boysen N (2005b) Reihenfolgeplanung bei Variantenfließfertigung: Ein integrativer Ansatz. Zeitschrift für Betriebswirtschaft 75:135–156
Boysen N, Fliedner M, Scholl A (2006a) Produktionsplanung bei Variantenfließfertigung: Planungshierarchie und Hierarchische Planung, Jenaer Schriften zur Wirtschaftswissenschaft 23/2006
Boysen N, Fliedner M, Scholl A (2006b) A classification of assembly line balancing problems, Erscheint in: Eur J Oper Res, doi:10.1016/j.ejor.2006.10.010
Brauner N, Crama Y (2004) The maximum deviation just-in-time scheduling problem. Discrete App Math 134:25–50
Brucker P, Drexl A, Möhring RH, Neumann K, Pesch E (1999) Resource-constrained project scheduling: Notation, classification, models and methods. Eur J Oper Res 112:3–41
Buzacott JA, Shanthikumar JG (1993) Stochastic models of manufacturing systems, 1. Auflage. Prentice Hall, Englewood Cliffs
Cakir A, Inman RR (1993) Modified goal chasing for products with non-zero/one bills of materials. Int J Prod Res 31:107–115
Cheng L, Ding FY (1996) Modifying mixed-model assembly line sequencing methods to consider weighted variations for just-in-time production systems. IIE Trans 28:919–927
Dahmala TN, Kubiak W (2005) A brief survey of just-in-time sequencing for mixed-model systems. Int J Oper Res 2:38–47
Ding F-Y, Cheng L (1993a) A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems. Oper Res Lett 13:27–36
Ding F-Y, Cheng L (1993b) An effective mixed-model assembly line sequencing heuristic for Just-In-Time production systems. J Oper Manage 11:45–65
Domschke W, Drexl A (2005) Einführung in Operations Research, 6. Auflage. Springer, Berlin
Domschke W, Scholl A, Voß S (1997) Produktionsplanung – Ablauforganisatorische Aspekte, 2. Auflage. Springer, Berlin
Drexl A, Kimms A (2001a) Belastungsorientierte Just-in-Time Variantenfließfertigung. Zeitschrift für Planung 12:101–115
Drexl A, Kimms A (2001b) Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints. Manage Sci 47:480–491
Drexl A, Kimms A, Matthießen L (2005) Algorithms for the car sequencing and the level scheduling problem. J Scheduling 9:153–176
Duplaga EA, Hahn CK, Hur D (1996) Mixed-model assembly line sequencing at Hyundai Motor Company. Prod Invent Manage J 37:20–26
Duplaga EA, Bragg DJ (1998) Mixed-model assembly line sequencing for smoothing component parts usage: A comparative analysis. Int J Prod Res 36:2209–2224
Engel C, Zimmermann J, Steinhoff A (1998) Objectives for order-sequencing in automobile production, In: Drexl A, Kimms A (Hrsg) Beyond Manufacturing resource planning (MRP II). Springer, Berlin
Fandel G, Francois P (1989) Just-in-Time-Produktion und -Beschaffung: Funktionsweise, Einsatzvoraussetzungen und Grenzen. Zeitschrift für Betriebswirtschaft 59:531–544
Fliedner M, Boysen N (2006) Solving the car sequencing problem via branch & bound, erscheint in: Eur J Oper Res
Gagné C, Gravel M, Price WL (2005) Solving real car sequencing problems with ant colony optimization, erscheint in: Eur J Oper Res
Graham RL, Lawler EL, Lenstra JK, Rinnooy Kan AHG (1979) Optimization and approximation in deterministic sequencing and scheduling: A survey. Ann Discret Math 5:287–326
Groeflin H, Luss H, Rosenwein MB, Wahls ET (1989) Final assembly for just-in-time manufacturing. Int J Prod Res 27:199–213
Gutenberg E (1983) Grundlagen der Betriebswirtschaftslehre, Band 1: Die Produktion, 24. Auflage. Springer, Berlin
Hopcroft J, Karp R (1973) An n2.5 algorithm for maximum matching in bipartite graphs. SIAM J Comput 2:225–231
Inman RR, Bulfin RL (1992) Quick and dirty sequencing for mixed-model multi-level JIT systems. Int J Prod Res 30:2011–2018
Jacob H (1990) Die Planung des Produktions- und Absatzprogramms, In: Industriebetriebslehre, H Jacob (Hrsg.), 4. Auflage, S. 405–590. Gabler, Wiesbaden
Joo S-H, Wilhelm WE (1993) A review of quantitative approaches in just-in-time manufacturing. Prod Plann Control 4:207–222
Kendall DG (1953) Stochastic processes occurring the theory of queues and their analysis by the method of imbedded Markov chains. Ann Math Stat 24:338–354
Klein R, Scholl A (2004) Planung und Entscheidung, 1. Auflage. Vahlen, München
Korkmazel T, Meral S (2001) Bicriteria sequencing methods for the mixed-model assembly line in just-in-time productions systems. Eur J Oper Res 131:188–207
Kotani S, Ito T, Ohno K (2004) Sequencing problem for a mixed-model assembly line in the Toyota production system. Int J Prod Res 42:4955–4979
Kovalyov MY, Kubiak W, Yeomans JS (2001) A computational study of balanced JIT optimization algorithms. INFOR 39:299–316
Kubiak W (1993) Minimizing variation of production rates in just-in-time systems: A survey. Eur J Prod Resh 66:259–271
Kubiak W (2003b) On small deviations conjecture. Bull Polish Acad Sci 51:189–203
Kubiak W (2004) Fair Sequences. In: Leung JY-T, Anderson JH (Hrsg) Handbook of scheduling: Algorithms, models, and performance analysis. Chapman & Hall, Boca Raton
Kubiak W (2005) Solution of the Liu-Layland problem via bottleneck just-in-time sequencing. J Scheduling 8:295–302
Kubiak W, Sethi S (1991) A note on schedules for mixed-model assembly lines in just-in-time production systems. Manage Sci 37:121–122
Kubiak W, Sethi S (1994) Optimal just-in-time schedules for flexible transfer lines. Int J Flexible Manuf Syst 6:137–154
Kubiak W, Steiner G, Yeomans JS (1997) Optimal level schedules for mixed-model multi-level just-in-time assembly systems. Ann Oper Res 69:241–259
Kurashige K, Yanagawa Y, Miyazaki S, Kameyama Y (2002) Time-based goal chasing method for mixed-model assembly line problem with multiple work stations. Prod Plann Control 13:735–745
Lee C-Y, Vairaktarakis GL (1997) Workforce planning in mixed model assembly systems. Oper Res 45:553–567
Lee TO, Kim Y, Kim YK (2001) Two-sided assembly line balancing to maximize work relatedness and slackness. Comp Ind Eng 40:273–292
Leu Y-Y, Matheson LA, Rees LP (1996) Sequencing mixed-model assembly lines with genetic algorithms. Comp Ind Eng 30:1027–1036
Leu Y-Y, Huang PY, Russel RS (1997) Using beam search techniques for sequencing mixed-model assembly lines. Ann Oper Res 70:379–397
Mansouri SA (2005) A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines. Eur J Oper Res 167:696–716
Mather H (1989) Competitive manufacturing, 1. Auflage. Prentice Hall, Englewood Cliffs
McMullen PR (1998) JIT sequencing for mixed-model assembly lines with setups using tabu search. Prod Plann Control 9:504–510
McMullen PR (2001a) An ant colony optimization approach to addressing a JIT sequencing problem with multiple objectives. Artif Intell Eng 15:309–317
McMullen PR (2001b) A Kohonen self-organizing map approach to addressing a multiple objective, mixed-model JIT sequencing problem. Int J Prod Econ 72:59–71
McMullen PR, Frazier GV (2000) A simulated annealing approach to mixed-model sequencing with multiple objectives on a JIT line. IIE Trans 32:671–679
McMullen PR, Tarasewich P, Frazier GV (2000) Using genetic algorithms to solve the multi-product JIT sequencing problem with setups. Int J Prod Res 38:2653–2670
Merengo C, Nava F, Pozzetti A (1999) Balancing and sequencing manual mixed-model assembly lines. Int J Prod Res 37:2835–2860
Miltenburg J (1989) Level schedules for mixed-model assembly lines in just-in-time production systems. Manage Sci 35:192–207
Miltenburg J (2002) Balancing and scheduling mixed-model U-shaped production lines. Int J Flexible Manuf Syst 14:119–151
Miltenburg J, Goldstein T (1991) Developing production schedules for balance part usage and smooth production loads for just-in-time production systems. Naval Res Logist 38:893–910
Miltenburg J, Sinnamon G (1989) Scheduling mixed-model multi-level just-in-time production systems. Int J Prod Res 27:1487–1509
Miltenburg J, Sinnamon G (1992) Algorithms for scheduling multi-level just-in-time production systems. IIE Trans 24:121–130
Miltenburg J, Sinnamon G (1995) Revisiting the mixed-model multi-level just-in-time scheduling problem. Int J Prod Res 33:2049–2052
Miltenburg J, Steiner G, Yeomans S (1990) A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems. Math Comp Modell 13:57–66
Monden Y (1998) Toyota Production System: An integrated approach to just-in-time, 3. Auflage. Engineering & Management Press, Norcross
Morabito MA, Kraus ME (1995) A note on scheduling mixed-model multi-level just-in-time production systems. Int J Prod Res 33:2061–2063
Ng WC, Mak KL (1994) A branch and bound algorithm for scheduling just-in-time mixed-model assembly lines. Int J Prod Econ 33:169–183
Ohno T (1993) Das Toyota-Produktionssystem, 1. Auflage. Campus-Verlag, Frankfurt am Main
Piller FT, Moeslein K, Stotko CM (2004) Does mass customization pay? An economic approach to evaluate customer integration. Prod Plann Control 15:435–444
Pine BJ (1993) Mass customization: The new frontier in business competition, 1. Auflage. Harvard Business School Press, Boston
Ponnambalam SG, Aravindan P, Rao MS (2003) Genetic algorithms for sequencing problems in mixed model assembly lines. Comput Ind Eng 45:669–690
Reichwald R, Dietl B (1991) Produktionswirtschaft. In: Heinen E (Hrsg) Industriebetriebslehre – Entscheidungen im Industriebetrieb, 9. Auflage. Gabler, Wiesbaden
Schneeweiß C (1992) Planung 2 – Konzepte der Prozeß- und Modellgestaltung, 1. Auflage. Springer, Berlin
Scholl A, Klein R, Domschke W (1998) Pattern based vocabulary building for effectively sequencing mixed-model assembly lines. J Heuristics 4:359–381
Schonberger RJ (1982) Japanese manufacturing techniques, 1. Auflage. Free Press, London
Steiner G, Yeomans S (1993) Level schedules for mixed-model just-in-time processes. Manage Sci 39:728–735
Steiner G, Yeomans S (1996) Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging. Eur J Oper Res 95:38–52
Sugimori Y, Kusunoki K, Cho F, Uchikawa S (1977) Toyota production system and kanban system materialization of JIT and respect-for-human system. Int J Prod Res 15:553–564
Sumichrast RT, Oxenrider KA, Clayton ER (2000) An evolutionary algorithm for sequencing production on a paced assembly line. Decision Sci 31:149–172
Sumichrast RT, Russel RS (1990) Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems. J Oper Manage 9:371–387
Sumichrast RT, Russel RS, Taylor BW (1992) A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system. Int J Prod Res 30:199–214
Tamura T, Long H, Ohno K (1999) A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass subline. Int J Prod Econ 60-61:557–564
Tsai L-H (1995) Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage. Manage Sci 41:485–495
Ventura JA, Radhakrishnan S (2002) Sequencing mixed model assembly lines for a just-in-time production system. Prod Plann Control 13:199–210
Wild R (1972) Mass-production management, 1. Auflage. Wiley & Sons, London
Xiaobo Z, Zhou Z, Asres A (1999) A note on Toyota's goal of sequencing mixed models on an assembly line. Comput Ind Eng 26:57–65
Xiaobo Z, Zhou Z (1999) Algorithms for Toyota's goal of sequencing mixed models on an assembly line with multiple workstations. J Oper Res Soc 50:704–710
Yu J, Yin Y, Chen Z (2006) Scheduling of an assembly line with a multi-objective genetic algorithm. Int J Adv Manuf Technol 29:551–555
Zaramdini W (2003) A study of just-in-time sequencing procedures for mixed-model assembly lines based on genetic algorithms. In: MIC2003: Fifth Metaheuristics International Conference, Kyoto
Zeramdini W, Aigbedo H, Monden Y (2000) Bicriteria sequencing for just-in-time mixed-model assembly lines. Int J Prod Res 38:3451–3470