Beyond make-or-buy: cross-company short-term capacity backup in semiconductor industry ecosystem
Tóm tắt
Từ khóa
Tài liệu tham khảo
Cachon G (2003). Supply chain coordination with contracts in handbooks in operations research and management science. In Graves S, KoK T (eds) Elsevier, The Netherlands
Cachon G, Lariviere MA (2001) Contracting to assure supply: how to share demand forecast in a supply chain. Manag Sci 47(5):629–646
Chien CF (2005) Decision analysis and management. Yeh-Yeh Book Gallery, Taipei, Taiwan
Chien CF, Chen YJ, Peng JT (2010) Manufacturing intelligence for semiconductor demand forecast based on technology diffusion and product life cycle. Int J Prod Econ 128(2):496–509
Chien CF, Hsu CY (2011) UNISON analysis to model and reduce step-and-scan overlay errors for semiconductor manufacturing. J Intell Manuf 22(3):399–412
Chien CF, Wang HJ, Wang M (2007) A UNISON framework for analyzing alternative strategies of IC final testing for enhancing overall operational effectiveness. Int J Prod Econ 107(1):20–30
Erkoc M, Wu SD (2005) Managing high-tech capacity expansion via reservation contracts. Prod Oper Manag 14(2):232–251
Fine CH, Whitney DE (1996) Is the make-buy decision process a core competence. Working paper, Massachusetts Institute of Technology
Grewal NS, Bruska AC, Wulf TM, Robinson JK (1998). Integrating targeted cycle-time reduction into the capital planning process. In: Proceedings of 1998 winter simulation conference, pp 1005–1010
Hood S, Bermon S, Barahona F (2003) Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Trans Semiconductor Manuf 16(2):273–280
Jin M, Wu SD (2001) Modeling capacity reservation in hi-tech manufacturing. Working paper, Pennsylvania: Lehigh University
Kuo RT, Lin TK, Jao JS (2003) Performance measurement and monitoring for clustered fab backup, 2003. In: International conference of industrial engineering and engineering management, Shanghai, RID: B048
Leachman RC, Ding SW, Chien CF (2007) Economic efficiency analysis of wafer fabrication. IEEE Trans Autom Sci Eng 4(4):501–512
Moore GE (1965) Cramming more components onto integrated circuits. Electronics 38(8):114–117
Moore JF (1993) Predators and prey: a new ecology of competition. Har Bus Rev 75–86
Murto P, Nasakkala E, Keppo J (2004) Timing of investments in oligopoly under uncertainty: a framework for numerical analysis. Eur J Oper Res 157:486–500
Ozer O, Wei W (2006) Strategic commitments for an optimal capacity decision under asymmetric forecast information. Manag Sci 52(8):1239–1258
Padillo JM, Diaby M (1999) A multiple-criteria decision methodology for the make-or-buy problem. Int J Prod Res 37(14):3203–3229
Platts KW, Probert DR, Canez L (2002) Make versus buy decisions: a process incorporating multi-attribute decision-making. Int J Prod Econ 77(3):247–257
Shih W, Chien CF, Shih CT, Chang J (2009) The TSMC way: meeting customer needs at Taiwan Semiconductor Manufacturing Co, Harvard Business School Case Study 9-610-003
Silver EA, Jain K (1994) Some ideas regarding reserving supplier capacity and selecting replenishment quantities in a project context. Int J Prod Econ 35(1–3):177–182
Simchi-Levi D, Kaminski P, Simchi-Levi E (2008) Designing and managing the supply chain: concepts, strategies, and case study, 3rd edn. McGraw-Hill, New York
Tu YM, Chao YH, Chang SH, You HC (2005) Model to determine the backup capacity of a wafer foundry. Int J Prod Res 43(2):339–359
Wang KJ, Lin SH (2002) Capacity expansion and allocation for a semiconductor testing facility under constrained Budget. Prod Plan Control 13(5):429–437
Witte JD (1996). Using static capacity modeling techniques. In: Proceedings of 1996 IEEE/SEMI advanced semiconductor manufacturing conference, pp 31–35
Wu MC, Chang WJ (2007) A short-term capacity trading method for semiconductor fabs with partnership. Expert Syst with Appl 33(2):476–483
Wu MC, Chang WJ (2008) A multiple criteria decision for trading capacity between two semiconductor fabs. Expert Syst Appl 35:938–945