A review on assembly sequence generation and its automation

M. V. A. Raju Bahubalendruni1, Bibhuti Bhusan Biswal1
1Department of Industrial Design, National Institute of Technology, Rourkela, India

Tóm tắt

Sequence of feasible mechanical assembly operations plays significant role in overall cost optimisation process for manufacturing industry and thus great importance is given to assembly sequence generation from past four decades. Though achieving at least one feasible sequence is focused in the earlier stages of research, the introduction of soft computing techniques attracted the industrial engineers towards cost-effective, optimised assembly sequences to attain economical manufacturing process. The integration of assembly sequence generation methods with computer aided design environment ensures more correctness and flexibility to automate the process. In this paper, a detailed review on various methods, their applications and limitations is presented and well discussed.

Từ khóa


Tài liệu tham khảo

Pan C. Integrating CAD files and automatic assembly sequence planning. PhD thesis, Iowa State University, USA, 2005.

Bourjault A. Contribution à une approche méthodologique de l'assemblage automatisé: élaboration automatique des séquences opératoires. PhD Thesis, Universite de Franche-Comte, France, 1984.

10.1109/JRA.1987.1087132

Homem de Mello L and Sanderson A. Automatic generation of mechanical assembly sequences Report no. CMU-FU-TR-88-19, December 1988. Pittsburgh: Carnegie Mellon University.

10.1109/70.54734

10.1109/70.75905

Lui MM. Generation and evaluation of mechanical assembly sequences using the liaison-sequence method. Master’s thesis, Massachusetts Institute of Technology, USA, 1988.

10.1109/70.68072

10.1016/S0007-8506(07)62644-4

De Floriani L and Nagy G. A graph model for face-to-face assembly. Proc IEEE Int Conf Robot Automat 1989; 1: 75–78.

Wolter JD. On the automatic generation of assembly plans. Proc IEEE Int Conf Robot Automat 1989; 1: 62–68.

Kim MG and Wu C. A Formal part mating model for generating compliance control strategies of assembly operations. IEEE Conf Syst Man Cybernet 1990; 611–616.

10.1016/S0007-8506(07)61140-8

10.1080/00207549508904862

10.1016/0010-4485(96)00001-2

10.3233/ICA-1996-3305

10.1016/S0360-8352(98)00106-5

10.1016/S0736-5845(99)00049-6

Mok S, Ong K and Wu CH. Automatic Generation of Assembly Instructions Using STEP. IEEE Int Conf Robot Automat 2001; 1: 313–318.

10.1115/1.1861473

10.4028/www.scientific.net/AMR.411.388

10.1142/S021968671100220X

10.1016/S0007-8506(07)63122-9

10.1016/S0967-0661(98)00177-4

10.1016/S0736-5845(99)00058-7

10.1016/S0954-1810(00)00011-X

10.1016/S0278-6125(01)80043-1

10.1016/j.compind.2003.08.001

Smith S, 2001, J Ind Technol, 17, 1

10.1016/S0736-5845(02)00029-7

10.1080/00207540210146152

10.1016/S1568-4946(02)00064-9

10.1016/j.cie.2005.07.007

10.1007/s00170-004-2155-y

10.1080/0020754042000203894

10.1016/j.eswa.2007.04.018

Wang W, 2009, J Chin Inst Ind Eng, 26, 44

10.1080/00207540110056135

10.1007/s00170-009-2264-8

Milner J, Graves S and Whitney D. Using simulated annealing to select least-cost assembly sequences. IEEE Int Conf Robot Automat 1994; 3: 2058–2063.

10.1016/S0360-8352(97)00014-4

Hong D and Cho H. Generation of robotic assembly sequences using a simulated annealing. IEEE/RSJ Int Conf Intell Robots Syst 1999; 2: 1247–1252.

10.1016/S0377-2217(00)00103-X

10.1007/s00170-003-1952-z

Sharma S, Biswal B, Dash P, et al. Generation of optimized robotic assembly sequence using ant colony optimization. IEEE Int Conf Automat Sci Eng 2008; 894-899.

10.1007/s00170-012-4695-x

10.1016/j.cad.2013.09.001

10.1016/j.rcim.2007.11.006

10.1007/s00170-010-2519-4

10.1016/j.rcim.2009.05.003

10.1007/s00170-011-3339-x

10.1007/s00170-013-4782-7

10.1109/21.260667

10.1016/0952-1976(94)00068-X

10.1016/j.eswa.2007.01.034

10.1007/s00170-005-0235-2

10.1016/j.engappai.2009.04.007

10.1016/j.eswa.2006.05.025

10.1016/j.proeng.2011.08.691

Shan H, Li S, Gong D, et al. Genetic simulated annealing algorithm-based assembly sequence planning. Technol Innovat Conf 2006; 1573–1579.

10.1007/s00170-007-1165-y

10.1080/00207540701362564

10.1007/s00170-010-2738-8

10.1016/j.asoc.2012.07.024

10.1007/BF01179417

10.1007/s00170-006-0438-1

10.1007/s00170-010-3093-5

Hoffman R. Automated assembly in a CSG domain. IEEE Int Conf Robot Automat 1989; 1: 210–215.

10.1016/0378-3804(89)90026-0

Liu Y and Popplestone R. Planning for assembly from solid models. IEEE Int Conf Robot Automat 1989; 1: 222–227.

Hoffman R. Automated assembly planning for B-rep products. IEEE Int Conf Syst Eng 1990; 391–394.

10.1016/0097-8493(90)90035-V

10.1016/S0007-8506(07)63012-1

10.1115/1.1429931

Bahubalendruni MVAR and Biswal BB. Computer aid for automatic liaisons extraction from CAD based robotic assembly. In: IEEE sponsored 8th international conference on intelligent systems and control, Coimbatore, India, 2014, pp.42–45.

Bahubalendruni MVAR, Biswal BB and Khanolkar G. Computer aid to obtain assembly cut-sets from 3D CAD product. Int Conf Des Manuf Mechatron 2014; 161–167.

10.1080/09511920500399425

10.1007/978-81-322-2012-1_29

Bahubalendruni MVAR, 2014, Trends Mech Eng Technol, 4, 11

10.1016/j.eswa.2009.05.098

10.1016/j.advengsoft.2012.01.005

10.1108/01445151211262410

10.1007/s12008-012-0165-9

10.1016/j.cad.2013.04.002