A fuzzy based algorithm to solve the machine-loading problems of a FMS and its neuro fuzzy petri net model

Rajeev Ranjan Kumar1, Amarjit Kumar Singh1, M. K. Tiwari1
1Department of Manufacturing Engineering, National Institute of Foundry and Forge Technology (NIFFT), Ranchi, India

Tóm tắt

This paper aims to develop a fuzzy-based solution approach to address a machine-loading problem of a flexible manufacturing system (FMS). The proposed solution methodology effectively deals with all the three main constituents of a machine loading problem, viz. job sequence determination, operation machine allocation and the reallocation of jobs. The main objectives of the FMS loading problem considered here are minimisation of system imbalance and maximisation of throughput; the constraints to be satisfied are the available machining time and tool slots. An analytical argument has been provided to support the membership function related to the operation machine allocation vector. Computational results revealed the superiority of the proposed algorithm over other heuristics when it is tested on a standard data set adopted from literature. A new class of petri net model called the “Extended neuro fuzzy petri net” is constructed to capture clearly the various details of the machine loading problem which can be further extended to learn from experience and perform inferences so that truly intelligent system characteristics can be realised.

Tài liệu tham khảo

Atlihan MK, Kayaligil S, Erkip N (1999) A generic model to solve tactical planning problems in flexible manufacturing systems. Int J Flex Manufact Sys 11:215–243

Lashkari RS, Dutta SP, Padhe AM (1987) A new formulation of operation allocation problem in flexible manufacturing system and computational experience. Int J Prod Res 25:1267–1283

Sawik TJ (1996) A multi level machine and vehicle scheduling in a FMS. Math Comput Model 23:71–83

Liang M, Dutta SP (1993a) Solving a combined part-selection, machine loading and tool-configuration problem in flexible manufacturing system. Prod Operat Manage 2:97–113

Shankar K, Tzen YJ (1985) A loading and dispatching problem in a random FMS. Int J Prod Res 23(3):579–593

Kim MM, Kim YD (1994) Simulation based real time scheduling in a FMS. J Manufact Sys 13:85–93

Choi RC, Malstorm EM (1988) Evaluation of traditional work scheduling in a FMS with a physical simulator. J Manufact Sys 7:3032–2045

Mukhopadhyay SK, Tiwari MK (1995) Solving machine-loading problems of flexible manufacturing systems by conjoint measurement. In: Proceedings of the 13th International Conference of Production Research (ICPR), Jerusalem, August 1995, pp 74–76.

Zadeh LA (1965) Fuzzy sets. Informat Control 8;338–353

Zimmerman HJ (1992) Approximate reasoning in manufacturing. In: Kusiah A (ed) Intelligent design and manufacturing, Wiley, Chichester, pp 701–722