A Three-Layer Supply Chain EPQ Model for Price- and Stock-Dependent Stochastic Demand with Imperfect Item Under Rework
Tóm tắt
In this paper, we have developed an integrated supplier-manufacturer-retailer, joint economic lot-sizing model for the items with stochastic demand and imperfect quality. The supplier produces the item (raw material) up to certain time, which is a decision variable, and sends it to the manufacturer. Now, the manufacturer produces the item in small cycles and the production process of manufacturer is imperfect which produces certain number of defective items. A 100 % screening process for detecting the imperfect quality items is conducted, and at the end of each cycle, the imperfect items are accumulated and are reworked by the manufacturer. Thus, ultimately the retailer receives the perfect quality item. We consider that the delivery quantity to the retailer depends on the price and stock-dependent stochastic demand of the retailer. The model considers the impact of business strategies such as optimal time, optimal ordering size of raw material, production rate, etc. in different sectors on collaborating marketing system. An analytical method is applied to optimize the production time and production rate to obtain minimum total cost. Finally, numerical results, which have several interesting managerial insights and implications, and the sensitivity analysis are presented and discussed for illustrative purposes.
Tài liệu tham khảo
Abdelsalam, HM, Elassal, MM: Joint economic lot sizing problem for a three—layer supply chain with stochastic demand. Int. J. Prod. Econ (2014). doi:10.1016/j.ijpe.2014.01.015 (under press).
Alshamrani, AM: Optimal control of a stochastic production-inventory model with deteriorating items. J. King Saud Univ. Sci. 25(1), 7–13 (2013).
Ben-Daya, M, Al-Nassar, A: An integrated inventory production system in a three layer supply chain. Prod. Plan. Control. 19(2), 97–104 (2008).
Ben-Daya, M, Darwish, M, Ertogal, K: The joint economic lot-sizing problem: review and extensions. Eur. J. Oper. Res. 185, 726–742 (2008).
Ben-Daya, M, Hassini, E, Hariga, M, Al Durgama, M: Consignment and vendor managed inventory in single-vendor multiple buyers supply chains. Int. J. Prod. Res. 51(5), 1347–1365 (2013).
Browne, S, Paul, Z: Inventory models with continuous, stochastic demands. Ann. Appl. Probab. 1(3), 419–435 (1991).
Chen, S, Geunes, J: Optimal allocation of stock levels and stochastic customer demands to a capacitated resource. Ann. Oper. Res. 203, 33–54 (2013).
Chiu, YP: Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng. Optim. 35(4), 427–437 (2003).
Dellaert, NP, Melo, MT: Heuristic procedures for a stochastic lot-sizing problem in make-to-order manufacturing. Ann. Oper. Res. 59, 227–258 (1995).
El-Kassar, AN: Optimal order quantity for imperfect quality items. Proc. Acad. Inf. Manag. Sci. 13(1), 24–30 (2009).
El-Kassar, AN, Salameh, M, Bitar, M: EPQ model with imperfect quality items of raw material and finished product. Proceedings the Academic and Business Research Institute Conference, Orlando, Florida (2012).
Goyal, SK: An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 15, 107–111 (1977).
Goyal, SK: A one-vendor multi-buyer integrated inventory model a comment. Eur. J. Oper. Res. 82, 209–210 (1995).
Gumus, AT, Guneri, AF: A multi-echelon inventory management framework for stochastic and fuzzy supply chains. Expert Syst. Appl. 36(3–1), 5565–5575 (2009).
Hayek, PA, Salameh, MK: Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control. 12(6), 584–590 (2001).
He, Y, Zhao, X, Zhao, L, He, J: Coordinating a supply chain with effort and price dependent stochastic demand. Appl. Math. Model. 33(6), 2777–2790 (2009).
Hill, RM: The single vendor and single buyer integrated production inventory model with a generalized policy. Eur. J. Oper. Res. 97, 493–499 (1997).
Hoque, MA: An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors. Eur. J. Oper. Res. 215(1), 80–88 (2011).
Huang, CK, Tsai, DM, Wu, JC, Chung, KJ: An optimal integrated vendor–buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments. Int. J. Prod. Econ. 128, 445–451 (2010).
Jaber, MY, Zanoni, S, Zavanella, LE: Economic order quantity models for imperfect items with buy and repair options. Int. J. Prod. Econ. 155, 126–131 (2014).
Jana, DK, Maity, K, Roy, TK: A three-layer supply chain integrated production-inventory model under permissible delay in payments in uncertain environments. J. Uncertainty Anal. Appl (2013). doi:10.1186/2195-5468-1-6.
Jha, JK, Shanker, K: Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints. Appl. Math. Model. 37(4), 1753–1767 (2013).
Khan, M, Jaber, MY, Guiffrida, AL, Zolfaghari, S: A review of the extensions of a modified EOQ model for imperfect quality items. Int. J. Prod. Econ. 132(1), 1–12 (2011).
Kumar, M, Chauhan, A, Kumar, P: Economic production lot size model with stochastic demand and shortage partial backlogging rate under imperfect quality items. Int. J. Adv. Sci. Technol. 31, 1–22 (2011).
Lam, CY, Ip, WH: A customer satisfaction inventory model for supply chain integration. Expert Syst. Appl. 38(1), 875–883 (2011).
Liao, GL, Sheu, SH: Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance. Int. J. Prod. Econ. 130, 118–124 (2011).
Liberopoulos, G, Pandelis, DG, Hatzikonstantinou, O: The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers. Ann. Oper. Res. 209, 179–205 (2013).
Lieckens, K, Vandaele, N: Differential evolution to solve the lot size problem in stochastic supply chain management systems. Ann. Oper. Res (2015). doi:10.1007/s10479-014-1778-0.
Lin, CC, Wu, YC: Combined pricing and supply chain operations under price-dependent stochastic demand. Appl. Math. Model. 38(5–6), 1823–1837 (2014).
Lin, YJ, Ouyang, LY, Dang, YF: A joint optimal ordering and delivery policy for an integrated supplier–retailer inventory model with trade credit and defective items. Appl. Math. Comput. 218(14), 7498–7514 (2012).
Manna, AK, Dey, JK, Mondal, SK: Three-layer supply chain in an imperfect production inventory model with two storage facilities under fuzzy rough environment. J. Uncertainty Anal. Appl (2014). doi:10.1186/s40467-014-0017-1.
Pal, B, Sana, SS, Chaudhuri, KS: A mathematical model on EPQ for stochastic demand in an imperfect production system. J. Manuf. Syst. 32(1), 260–270 (2013).
Pal, S, Mahapatra, GS, Samanta, GP: An inventory model of price and stock dependent demand rate with deterioration under inflation and delay in payment. Int. J. Syst. Assur. Eng. Manag. 5(4), 591–601 (2014).
Pasandideh, SHR, Niaki, STA, Asadi, K: Optimizing a bi-objective multi-product multi-period three echelon supply chain network with warehouse reliability. Expert Syst. Appl. 42(5), 2615–2623 (2015).
Pasandideh, SHR, Niaki, STA, Tokhmehchi, N: A parameter-tuned genetic algorithm to optimize two-echelon continuous review inventory systems. Expert Syst. Appl. 38(9), 8–11714 (2011).
Prasad, K, Mukherjee, B: Optimal inventory model under stock and time dependent demand for time varying deterioration rate with shortages. Ann. Oper. Res (2014). doi:10.1007/s10479-014-1759-3.
Ramakrishna, KS, Sharafali, M, Lim, YF: A two-item two-warehouse periodic review inventory model with transhipment. Ann. Oper. Res (2013). doi:10.1007/s10479-013-1483-4.
Salameh, MK, Jaber, MY: Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64, 59–64 (2000).
Sana, SS: An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201, 158–170 (2010).
Sana, SS: A production-inventory model of imperfect quality products in a three layer supply chain. Decis. Support. Syst. 50, 539–547 (2011).
Sana, SS: An EOQ model for stochastic demand for limited capacity of own warehouse. Ann. Oper. Res (2013). doi:10.1007/s10479-013-1510-5.
Sarkar, BR, Diponegoro, A: Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers. Eur. J. Oper. Res. 194, 753–773 (2009).
Sarkar, B, Sarkar, S: An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand. Econ. Model. 30, 924–932 (2013).
Solyal, O, Sural, H: The one-warehouse multi-retailer problem: reformulation, classification, and computational results. Ann. Oper. Res. 196, 517–541 (2012).
Soni, HN, Patel, KA: Optimal strategy for an integrated inventory system involving variable production and defective items under retailer partial trade credit policy. Decis. Support. Syst. 54(1), 235–247 (2012).
Srinivas, C, Rao, CSP: Optimization of supply chains for single-vendor-multibuyer consignment stock policy with genetic algorithm. Int. J. Adv. Manuf. Technol. 48, 407–420 (2010).
Ting, PS, Chung, KJ: Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management. Appl. Math. Model. 38(7-8), 2290–2295 (2014).
Varyani, A, Jalilvand-Nejad, A, Fattahi, P: Determining the optimum production quantity in three-echelon production system with stochastic demand. The Int. J. Adv. Manuf. Technol. 72(1-4), 119–133 (2014).
Zavanella, L, Zanoni, S: A one-vendor multi-buyer integrated production-inventory model: The Consignment Stock case. Int. J. Prod. Econ. 118, 225–232 (2009).
Zavanella, L, Zanoni, S: Erratum to ’A one-vendor multi-buyer integrated production-inventory model: the “Consignment Stock” case’. Int. J. Prod. Econ. 125(1), 212–213 (2010).
Zhou, Z, Guan, Y: Two-stage stochastic lot-sizing problem under cost uncertainty. Ann. Oper. Res. 209, 207–230 (2013).