Network design: taxi planning

Springer Science and Business Media LLC - Tập 157 - Trang 135-151 - 2007
Angel Marín1, Esteve Codina2
1Applied Mathematics and Statistics Department, Polytechnic University of Madrid, Madrid, Spain
2Statistics and Operations Research Department, Polytechnic University of Catalonia, Barcelona, Spain

Tóm tắt

The effect of managing aircraft movements on the airport’s ground is an important tool that can alleviate the delays of flights, specially in peak hours or congested situations. Although some strategic design decisions regarding aeronautical and safety aspects have a main impact on the airport’s topology, there exists a number of other additional factors that must be evaluated according to the on ground operations, i.e. previous to the taking-off or after landing. Among these factors one can consider capacities at waiting points and directions of some corridors. These factors are related to the demand situation of a given period and influence the aircraft’s routing on the ground or short term Taxi Planning problem (or TP-S). While the TP-S problem studies the aircraft routing and scheduling on the airport’s ground under a dynamic point of view, this paper presents a Taxi Planning network design model (or TPND), attending to these additional factors of the airport’s topology and the conflicting movements of the aircraft on them with the same modelling approach used in the TP-S problem. The TPND model is formulated as a binary multicommodity network flow problem with additional side constraints under a multiobjective approach. The side constraints included are the classical limitations due to capacity and also as a distinctive approach, constraints that restrict the interference of aircraft in order to decrease the intervention of human controllers during the operations or increase their safety margins. The multiobjective approach adopted for the TPND model balances conflicting objectives: airport’s throughput, travel times, safety of operations and costs. In the paper computational results are included on two test airports solving the TPND model by “Branch and Bound” showing the effect of the conflicting objectives in the design decisions.

Tài liệu tham khảo