Claims management in the Egyptian industrial construction sector
Tóm tắt
Tài liệu tham khảo
Al Bawaba (2005), “UAE construction claims up to 10 times”, available at: www.albawaba.com/en/countries/UAE/184821.
Burati, J. (1992), “Causes of quality deviations in design and construction”, Construction Engineering and Management, Vol. 118 No. 1, pp. 34‐49.
Diekmann, E. and Nelson, C. (1985), “Construction claims: frequency and severity”, Journal of Construction Engineering and Management, Vol. 111 No. 1, pp. 74‐81.
Falqi, I. (2004), “Delays in project completion: a comparative study of construction delay factors in Saudi Arabia and the United Kingdom”, MSc thesis, School of the Built Environment, Herriot‐Watt University, September.
Fourie, F. (1993), “Quantifying costs due to change”, South Africa Institute of Civil Engineers”, Vol. 135 No. 3, pp. 23‐5.
Gransberg, D. and Joplin, C. (2000), “Developing construction claims for arbitration: two arbitrators' viewpoint”, Cost Engineering, Vol. 42 No. 7, pp. 29‐31.
Hamilton, D. (1991), “Records management in engineering firms”, Management in Engineering, Vol. 7 No. 4, pp. 346‐56.
Hanna, S. and Russel, S. (1998), “Quantifying the effect of change orders on electrical construction labor efficiency”, Cost Engineering, Vol. 40 No. 2, pp. 36‐40.
Hanna, S., Russell, S., Nordheim, V. and Bruggink, J. (1999a), “Impact of change orders on labor efficiency for electrical construction”, Construction Engineering and Management, Vol. 125 No. 4, pp. 224‐32.
Hanna, S., Russell, S., Gotzion, W. and Nordheim, V. (1999b), “Impact of change orders on labor efficiency for mechanical construction”, Construction Engineering and Management, Vol. 125 No. 3, pp. 176‐84.
Hughes, A. and Barber, J. (1992), Claims in Perspective, Longman Scientific and Technical, Harlow.
James, R. (1993), “World Trade Center at the International Conference Center”, Proceedings from the Gulf Construction Conference Held in Dubai.
Jergease, G. and Hartman, T. (1994), “Contractors' construction claims avoidance”, Construction Engineering and Management, Vol. 120 No. 3, pp. 553‐60.
Pinnell, S. (1998), How to Get Paid for Construction Changes, McGraw Hill, New York, NY.
Semple, C., Hartman, T. and Jergeas, G. (1994), “Construction claims and disputes: causes and cost/time overruns”, Construction Engineering and Management, Vol. 120 No. 4, pp. 785‐94.
Thomas, R., Gray, R. and Dennis, E. (1991), “Legal aspects of oral change orders”, Construction Engineering and Management, Vol. 117 No. 1, pp. 148‐62.
Veenendal, A. (1998), “Analyzing the impact of change orders on a schedule”, Cost Engineering, Vol. 40 No. 9, pp. 33‐9.
Vidogah, W. and Ndekugri, I. (1997), “Improving the management of claims on construction contracts: consultants perspective”, Construction Management and Economics, Vol. 16 No. 3, pp. 363‐72.
Zack, G. (1993), “Claimsmanship: a current perspective”, Construction Engineering and Management, Vol. 119 No. 3, pp. 480‐97.