Current practices of engineering change management in UK manufacturing industries
Tóm tắt
Từ khóa
Tài liệu tham khảo
Balcerak, K.J. and Dale, B.G. (1992, “Engineering change administration: the key issues”, Computer‐Integrated Manufacturing Systems, Vol. 5 No. 2, pp. 125‐32.
Boznak, R.G. (1993, Competitive Product Development, Business One Irwin/Quality Press, Milwaukee, WI.
Carter, D.E. and Baker, B.S. (1992, Concurrent Engineering: The Product Development Environment for the 1990s, Addison‐Wesley Publishing Company, Reading, MA.
Dale, B.G. (1982, “The management of engineering change procedure”, Engineering Management International, Vol. 1, pp. 201‐8.
Diprima, M. (1982, “Engineering change control and implementation considerations”, Production and Inventory Management Journal, Vol. 23 No. 1, pp. 81‐7.
Harhalakis, G. (1986, “Engineering changes for made‐to‐order products: how an MRP II system should handle them”, Engineering Management International, Vol. 4, pp. 19‐36.
Harris, S.B, (1996, “Business strategy and the role of engineering product data management: a literature review and summary of the emerging research questions, Part B”, Journal of Engineering Manufacture, Proceedings of IMechE, Vol. 210, pp. 207‐19.
Hegde, G.G., Kekre, S.H. and Su, H. (1992, “Engineering changes and time delays: a field investigation”, International Journal of Production Economics, Vol. 28, pp. 341‐52.
Huang, G.Q. and Mak, K.L. (1997a, “Engineering changes: a survey within UK manufacturing industries”, in Proceedings of International Conference on Managing Enterprises, Loughborough University, July.
Huang, G.Q. and Mak, K.L. (1997b, “Good practice in engineering change management”, International Conference on Industrial Engineering: Practice and Applications.
Huang, G.Q. and Mak, K.L. (1997c, “Computer aids for engineering change management”, in Proceedings of International Conference on Computer Aided Production Engineering, Poland, June.
Leech, D.J. and Turner, B.T. (1985, Engineering Design for Profit, Ellis Horwood, Chichester, Ch. 12.
Maull, R., Hughes, D. and Bennett, J. (1992, “The role of the bill‐of‐materials as a CAD/CAPM interface and the key importance of engineering change control”, Computing & Control Engineering Journal, March, pp. 63‐70.
Monahan, R.E. (1995, Engineering Documentation Control Practices and Procedures, Marcel Dekker, New York, NY.
Nicholls, K. (1990, “Getting engineering changes under control”, Journal of Engineering Design, Vol. 1 No. 1, pp. 1‐6.
Reidelbach, M.A. (1991, “Engineering change management in long‐lead‐time environments”, Production and Inventory Management Journal, Vol. 32 No. 2, pp. 84‐8.
Saeed, I., Bowen, D.M. and Sohoni, V.S. (1993, “Avoiding engineering changes through focused manufacturing knowledge”, IEEE Transactions on Engineering Management, Vol. 40 No. 1, pp. 54‐8.
Watts, F. (1984, “Engineering changes: a case study”, Production and Inventory Management Journal, Vol. 25 No. 4, pp. 55‐62.