Assessment of risks in high rise building construction in Jakarta

Emerald - Tập 10 Số 1 - Trang 43-55 - 2003
Djoen San Santoso1, Stephen O. Ogunlana2, Takayuki Minato3
1Djoen San Santoso is a Doctoral Student at the Design and Planning Laboratory, Department of Civil and Environmental Engineering, Saitama University, Saitama, Japan.
2Stephen O. Ogunlana is a Professor at the School of Civil Engineering, Asian Institute of Technology, Pathumthani, Thailand.
3Takayuki Minato is Associate Professor at the Institute of Environmental Studies, University of Tokyo, Tokyo, Japan.

Tóm tắt

Risk is inherent in every construction project, especially complex projects like high rise buildings. It is helpful to understand the significant risks in order to anticipate their possible negative effects on projects. This research identifies, ranks and categorizes high potential risks in high rise building projects in Jakarta. Questionnaire surveys and interviews were conducted on engineers from contracting firms in the city. The result shows that risks related to management and design are the most significant in high rise construction projects. It is also shown that client interference should be avoided or reduced in tandem with good communication and teamwork between contractors and consultants to minimize defects. Contractors also need to give attention to the maintenance of equipment in order to sustain high productivity levels.

Tài liệu tham khảo

Akinci, B. and Fischer, M. (1998), “Factors affecting contractors’ risk of cost overburden”, Journal of Management in Engineering, Vol. 14 No. 1, pp. 67‐76. Akintoye, A.S. and MacLeod, M.J. (1997), “Risk analysis and management in construction”, International Journal of Project Management, Vol. 15 No. 1, pp. 31‐8. Al‐Bahar, J.F. and Crandall, K.C. (1990), “Systematic risk management approach for construction project”, Journal of Construction Engineering and Management, Vol. 116 No. 3, pp. 533‐46. Arditi, D. and Mochtar, K. (1996), “Productivity improvement in the Indonesian construction industry”, Construction Management and Economics, Vol. 14 No. 1, pp. 13‐24. Asian Development Bank (1999), The Statistical Database System – Statistical Data of Indonesia, Economic and Development Resource Center, Asian Development Bank, available at: http://internotes.asiandevbank.org/notes/ino/INONACT.htm Chapman, C. and Ward, S. (1997), Project Risk Management: Processes, Techniques and Insights, John Wiley & Sons Ltd, Chichester. Edwards, L. (1995), Practical Risk Management in the Construction Industry, Thomas Telford, London. Flanagan, R. and Norman, G. (1993), Risk Management and Construction, Blackwell Scientific Publications, Oxford. Healy, N.J. (1981), “Risk management in giant civil engineering projects: a study for the science research council”, master’s thesis, University of Manchester, Manchester. Koentjaraningrat (1997), Kebudayaan, Mentalitas dan Pembangunan, 18th ed., PT. Gramedia Pustaka Utama, Jakarta (in Indonesian). Kumaraswamy, M.M. (1997), “Appropriate appraisal and apportionment of megaproject risks”, Journal of Professional Issues in Engineering Education and Practice, Vol. 123 No. 2, pp. 51‐6. Laokhongthavorn, L. (1998), “Recurrent risk assessment for Bangkok high‐rise building projects”, master’s thesis No. ST‐98‐31, Asian Institute of Technology, Pathumthani. Levitt, R.E., Ashley, D.B. and Logcher, R.D. (1980), “Allocating risk and incentive in construction”, Journal of the Construction Division, Vol. 106 No. C03, pp. 297‐305. Niwa, K. (1989), Knowledge‐based Risk Management in Engineering: A Case Study in Human Computer Cooperative System, John Wiley & Sons, Toronto. Norusis, M. (1994), SPSS Professional Statistics 6.1, SPSS Inc., Chicago, IL. Palmer, W.J., Maloney, J.M. and Heffron, J.L., III (1996), Construction Insurance, Bonding, and Risk Management, McGraw‐Hill Companies, Inc., New York, NY. Papageorge, T.E. (1988), Risk Management for Building Professionals, R.S. Means Company, Inc., Kingston, MA. Perry, J.G. (1985), “The development of contract strategies for construction projects”, doctoral dissertation, University of Manchester, Manchester. Perry, J.G. (1986), “Risk management – an approach for project managers”, International Journal of Project Management, Vol. 4 No. 4, pp. 211‐16. Porter, C.E. (1981), “Risk allocation in construction contracts”, master’s thesis, University of Manchester, Manchester. Ren, H. (1994), “Risk lifecycle and risk relationships on construction projects”, International Journal of Project Management, Vol. 12 No. 2, pp. 68‐74. Zhi, H. (1995), “Risk management for overseas construction projects”, International Journal of Project Management, Vol. 13 No. 4, pp. 231‐7.