Work Study Volume 24 Issue 5

Emerald - Tập 24 Số 5 - Trang 3-47 - 1975

Tóm tắt

Much of the working time expended by work study personnel in gathering statistical data at grass‐root level and in improving methods could, with foresight, be directed into more profitable channels. At the design stage, the draughtsman, for example, could break the job down to one operation instead of sending out a drawing that involves two operations on the shop floor. By being trained in method study draughtsmen could make a major contribution to productivity.

Từ khóa


Tài liệu tham khảo

Polya G., How to Solve It, 10.2307/j.ctvc773pk

Newell A., 1958, Operations Research, 1958

Tonge Fred M., A Heuristic Program for Assembly Line Balancing

Marks N, Marketing Logistics

Wiest J. D., 1966, Harvard Business Review, Sept.-Oct.

10.1108/eb038829

R., Decision Analysis