Vision-Based Tower Crane Tracking for Understanding Construction Activity

Journal of Computing in Civil Engineering - Tập 28 Số 1 - Trang 103-112 - 2014
Jun Yang1, Patricio A. Vela2, Jochen Teizer3, Shi Zhong-ke4
1Assistant Professor, Northwestern Polytechnical Univ., Xi’an 710072, China (corresponding author).
2Assistant Professor, School of Electrical and Computer Engineering, Georgia Institute of Technology, Atlanta, GA 30332.
3Assistant Professor, School of Civil and Environmental Engineering, Georgia Institute of Technology, Atlanta, GA 30332.
4Professor, Northwestern Polytechnical Univ., Xi’an 710072, China.

Tóm tắt

Từ khóa


Tài liệu tham khảo

10.1061/(ASCE)0733-9364(1999)125:2(87)

10.1061/(ASCE)0887-3801(2002)16:4(269)

Bolivar A. and Mee A. S. (1997). “Activity analysis using computer-processed time lapse video.” Construction Congress V: Managing Engineered Construction in Expanding Global Markets ASCE Reston VA 462–469.

10.1016/j.aei.2011.01.003

10.1016/j.autcon.2011.05.001

Construction Industry Institute (CII). (2010). “Guide to activity analysis.” Rep. No. Implementation Resource 252-2a Univ. of Texas at Austin Austin TX.

10.1061/(ASCE)0733-9364(1993)119:1(23)

Gong J. and Caldas C. (2011). “Learning and classifying motions of construction workers and equipment using bag of video feature words and bayesian learning methods.” Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 274–281.

10.1061/(ASCE)CP.1943-5487.0000027

Grau D. and Caldas C. (2007). “A framework for automated localization of on-site construction components.” Proc. Construction Research Congress ASCE/CIP Reston VA.

10.1016/j.autcon.2009.04.001

Hartley R., 2003, Multiple view geometry in computer vision

10.1061/(ASCE)0733-9399(2005)131:1(88)

Kim S. H. and Bai Y. (2007). “Development of a real-time productivity measurement system for bridge replacement.” Proc. Mid-Continent Transpiration Research Symp. Iowa State University Ames IA.

Luo X. Leite F. and O’Brien W. (2011). “Requirements for autonomous crane safety monitoring.” Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 331–338.

Makhmalbaf A. Park M. Yang J. Brilakis I. and Vela P. (2010). “2D vision tracking methods’ performance comparison for 3D tracking of construction resources.” Proc. Construction Research Congress 2010: Innovation for Reshaping Construction Practice ASCE VA 459–469.

McCullouch B. (1997). “Automating field data collection in construction organizations.” Proc. 5th Construction Congress: Managing Engineered Construction in Expanding Global Markets ASCE Reston VA 957–963.

10.1016/j.autcon.2006.08.001

Oglesby C., 1989, Productivity improvement in construction

10.1109/TSMC.1979.4310076

Pradhan A. and Akinci B. (2007). “A planning based approach for fusing data from multiple sources for productivity monitoring.” Proc. Construction Research Congress ASCE/CIB Reston VA.

10.1016/j.autcon.2010.11.009

10.1061/(ASCE)0733-9364(2008)134:5(320)

10.1061/(ASCE)0887-3801(2008)22:1(21)

10.1016/j.aei.2009.06.011

10.1061/(ASCE)0733-9364(1991)117:3(423)

10.1109/34.598236

10.1016/j.aei.2010.06.008

Yang J. Vela P. A. Teizer J. and Shi Z. (2011). “Vision-based crane tracking for understanding construction activity.” Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 258–265.

Zavichi A. and Behzadan A. (2011). “A real time decision support system for enhanced crane operations in construction and manufacturing.” Proc. Int. Workshop on Computing in Civil Engineering ASCE Reston VA 586–593.

10.1061/(ASCE)0887-3801(2007)21:4(238)