Using the EPQ for coordinated planning of a product with partial backordering and its components
Tài liệu tham khảo
Banerjee, 1990, Input/output lot sizing in single batch production systems under constant demand, Computers & Industrial Engineering, 19, 37, 10.1016/0360-8352(90)90073-U
Banerjee, 1989, Lot sizing and work-in-process inventories in single stage production systems, 283
Sharma, 2004, Economic procurement cycles in response to JIT concept, Journal of the Institution of Engineers (India)—Part PR, 85, 36
Sharma, 2009, A composite model in the context of a production–inventory system, Optimization Letters, 3, 239, 10.1007/s11590-008-0104-7
Pentico, 2009, The deterministic EPQ with partial backordering: a new approach, Omega, 37, 624, 10.1016/j.omega.2008.03.002
D.W. Pentico, M.J. Drake, A survey of deterministic models for the EOQ and EPQ with partial backordering, Working Paper, 2010.
Mak, 1987, Determining optimal production–inventory control policies for an inventory system with partial backlogging, Computers & Operations Research, 14, 299, 10.1016/0305-0548(87)90067-0
Zeng, 2001, A partial backordering approach to inventory control, Production Planning & Control, 12, 660, 10.1080/09537280010016008
Sharma, 1997, Effects of lost sales on composite lot sizing, Computers & Industrial Engineering, 32, 671, 10.1016/S0360-8352(96)00307-5
Sharma, 2007, Minimizing the difference between intermittent and continuous production with back orders, Journal of Engineering Manufacture, 221, 1617, 10.1243/09544054JEM789
Taleizadeh, 2010, Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint, Journal of Computational and Applied Mathematics, 233, 1834, 10.1016/j.cam.2009.09.021
Sharma, 2006, Incorporating fractional backordering in the multi-product manufacturing situation with shelf lives, Journal of Engineering Manufacture, 220, 1151, 10.1243/09544054JEM340
Sharma, 2004, Optimal production policy with shelf life including shortages, Journal of the Operational Research Society, 55, 902, 10.1057/palgrave.jors.2601760
Sharma, 2007, A procedure for benchmarking in multi-product manufacturing, Journal of Engineering Manufacture, 221, 541, 10.1243/09544054JEM723SC
Franca, 1997, A heuristic method for lot-sizing in multi-stage systems, Computers & Operations Research, 24, 861, 10.1016/S0305-0548(96)00097-4
Bard, 1991, Determining the number of kanbans in a multiproduct, multistage production system, International Journal of Production Research, 29, 881, 10.1080/00207549108930108
Rees, 1989, A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation, International Journal of Production Research, 27, 1427, 10.1080/00207548908942632
Grubbstrom, 2003, A stochastic model of multi-item/multi-stage capacity-constrained production–inventory systems, International Journal of Production Economics, 483, 10.1016/S0925-5273(02)00358-4
Clark, 1960, Optimal policies for a multi-echelon inventory problem, Management Science, 6, 475, 10.1287/mnsc.6.4.475
Maxwell, 1985, Establishing consistent and realistic reorder intervals in production–distribution systems, Operations Research, 33, 1316, 10.1287/opre.33.6.1316
Roundy, 1985, 98% effective integer-ratio lot-sizing rule for one warehouse multi-retailer systems, Management Science, 31, 1416, 10.1287/mnsc.31.11.1416
Zipkin, 2000
Anwar, 1997, Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite setups, International Journal of Production Research, 35, 1447, 10.1080/002075497195416