Use of float consumption rate in resource leveling of construction projects
Tóm tắt
Từ khóa
Tài liệu tham khảo
Ahuja H N (1976). Construction Performance Control by Networks. New York: John Wiley and Sons
Al-Gahtani K (2009). Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135(2): 88–95
Ammar M (2003). Float analysis of non-serial repetitive activities. Construction Management and Economics, 21(5): 535–542
Anagnostopoulos K P, Koulinas G K (2010). A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(2): 163–175
Arditi D, Tokdemir O B, Suh K (2001). Effect of learning on line of balance scheduling. International Journal of Project Management, 19(5): 265–277
Arditi D, Tokdemir O B, Suh K (2002). Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6): 545–556
Benjaoran V, Tabyang W, Sooksil N (2015). Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9): 711–723
Burgess A R, Killebrew J B (1962). Variation in activity level on a cyclical arrow diagram. Journal of Industrial Engineering, 13(2): 76–83
Christodoulou S E, Ellinas G, Aslani P (2009). Entropy-based scheduling of resource-constrained construction projects. Automation in Construction, 18(7): 919–928
Christodoulou S E, Ellinas G, Michaelidou-Kamenou A (2010). Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5): 518–527
Damci A, Arditi D, Polat G (2013a). Resource leveling in line-of-balance scheduling. Computer-Aided Civil and Infrastructure Engineering, 28(9): 679–692
Damci A, Arditi D, Polat G (2013b). Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9): 1108–1116
Damci A, Arditi D, Polat G (2016). Impacts of different objective functions on resource leveling in line-of-balance scheduling. KSCE Journal of Civil Engineering, 20(1): 58–67
Damci A, Polat G (2014). Impacts of different objective functions on resource leveling in construction projects. Journal of Civil Engineering and Management, 20(4): 537–547
Damci A, Polat G, Akin F D, Turkoglu H (2019). Resource levelling with float consumption rate. In: Proceedings of the Creative Construction Conference 2019. Budapest, 597–602
de la Garza J, Prateapusanond A, Ambani N (2007). Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11): 836–845
de la Garza J, Vorster M, Parvin M (1991). Total float traded as commodity. Journal of Construction Engineering and Management, 117(4): 716–727
Easa S M (1989). Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2): 302–316
El-Sayegh S (2018). Resource levelling optimization model considering float loss impact. Engineering, Construction, and Architectural Management, 25(5): 639–653
Gong D, Rowings Jr J E (1995). Calculation of safe float use in risk-analysis-oriented network scheduling. International Journal of Project Management, 13(3): 187–194
Gould F E (2012). Managing the Construction Process: Estimating, Scheduling, and Project Control. 4th ed. Upper Saddle River, NJ: Prentice Hall
Hajdu M (2015). Point-to-point versus traditional precedence relations for modeling activity overlapping. Procedia Engineering, 123: 208–215
Hajdu M (2018). Survey of precedence relationships: Classification and algorithms. Automation in Construction, 95: 245–259
Hariga M, El-Sayegh S M (2011). Cost optimization model for the multiresource leveling problem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1): 56–64
Harris R B (1978). Precedence and Arrow Networking Techniques for Construction. New York: John Wiley and Sons
Harris R B (1990). Packing method for resource leveling (PACK). Journal of Construction Engineering and Management, 116(2): 331–350
Hashemi Doulabi S H, Seifi A, Shariat S Y (2011). Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2): 137–146
Hiyassat MAS (2000). Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4): 278–284
Hiyassat MAS (2001). Applying modified minimum moment method to multiple resource leveling. Journal of Construction Engineering and Management, 127(3): 192–198
Householder J L, Rutland H E (1990). Who owns the float? Journal of Construction Engineering and Management, 116(1): 130–133
Kyriklidis C, Vassiliadis V, Kirytopoulos K, Dounias G (2014). Hybrid nature-inspired intelligence for the resource leveling problem. Operations Research, 14(3): 387–407
Lu M, Li H (2003). Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4): 412–420
Naylor H F W (2012). Construction Project Management: Planning and Scheduling. New York: Delmar Pub
Ponce de Leon G (1986). Float ownership: Specs treatment. Cost Engineering, 28(10): 12–15
Ponz-Tienda J L, Yepes V, Pellicer E, Moreno-Flores J (2013). The resource leveling problem with multiple resources using an adaptive genetic algorithm. Automation in Construction, 29: 161–172
Popescu C M (1976). How to use CPM in practice, Part II—Resources. Austin: University of Texas at Austin
Prateapusanond A (2003). Study on a Comprehensive Practice of Total Float Pre-allocation and Management for the Application of a CPM-based Construction Contract. Dissertation for the Doctoral Degree.
Blacksburg, VA: Virginia Polytechnic Institute Project Management Institute (2017). A Guide to the Project Management Body of Knowledge (PMBOK). Pennsylvania: Project Management Institute
Qiao J, Li Y (2018). Resource leveling using normalized entropy and relative entropy. Automation in Construction, 87: 263–272
Sakka Z, El-Sayegh S (2007). Float consumption impact on cost and schedule in the construction industry. Journal of Construction Engineering and Management, 133(2): 124–130
Savin D, Alkass S, Fazio P (1996). Construction resource leveling using neural networks. Canadian Journal of Civil Engineering, 23(4): 917–925
Senouci A B, Adeli H (2001). Resource scheduling using neural dynamics model of Adeli and Park. Journal of Construction Engineering and Management, 127(1): 28–34
Son J, Skibniewski M J (1999). Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1): 23–31
Wagner H M, Giglio R J, Glaser R G (1964). Preventive maintenance scheduling by mathematical programming. Management Science, 10(2): 316–334
Wiest J D, Levy F K (1977). A Management Guide to PERT/CPM: With GERT/PDM/DCPM and Other Networks. 2nd ed. Upper Saddle River, NJ: Prentice-Hall