Use of float consumption rate in resource leveling of construction projects

Atilla Damcı1, Gül Polat1, Firat Dogu Akin1, Harun Turkoglu1
1Department of Civil Engineering, Istanbul Technical University, İstanbul, Turkey

Tóm tắt

Từ khóa


Tài liệu tham khảo

Ahuja H N (1976). Construction Performance Control by Networks. New York: John Wiley and Sons

Al-Gahtani K (2009). Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135(2): 88–95

Ammar M (2003). Float analysis of non-serial repetitive activities. Construction Management and Economics, 21(5): 535–542

Anagnostopoulos K P, Koulinas G K (2010). A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(2): 163–175

Arditi D, Tokdemir O B, Suh K (2001). Effect of learning on line of balance scheduling. International Journal of Project Management, 19(5): 265–277

Arditi D, Tokdemir O B, Suh K (2002). Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6): 545–556

Benjaoran V, Tabyang W, Sooksil N (2015). Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9): 711–723

Burgess A R, Killebrew J B (1962). Variation in activity level on a cyclical arrow diagram. Journal of Industrial Engineering, 13(2): 76–83

Christodoulou S E, Ellinas G, Aslani P (2009). Entropy-based scheduling of resource-constrained construction projects. Automation in Construction, 18(7): 919–928

Christodoulou S E, Ellinas G, Michaelidou-Kamenou A (2010). Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5): 518–527

Damci A, Arditi D, Polat G (2013a). Resource leveling in line-of-balance scheduling. Computer-Aided Civil and Infrastructure Engineering, 28(9): 679–692

Damci A, Arditi D, Polat G (2013b). Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9): 1108–1116

Damci A, Arditi D, Polat G (2016). Impacts of different objective functions on resource leveling in line-of-balance scheduling. KSCE Journal of Civil Engineering, 20(1): 58–67

Damci A, Polat G (2014). Impacts of different objective functions on resource leveling in construction projects. Journal of Civil Engineering and Management, 20(4): 537–547

Damci A, Polat G, Akin F D, Turkoglu H (2019). Resource levelling with float consumption rate. In: Proceedings of the Creative Construction Conference 2019. Budapest, 597–602

de la Garza J, Prateapusanond A, Ambani N (2007). Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11): 836–845

de la Garza J, Vorster M, Parvin M (1991). Total float traded as commodity. Journal of Construction Engineering and Management, 117(4): 716–727

Easa S M (1989). Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2): 302–316

El-Sayegh S (2018). Resource levelling optimization model considering float loss impact. Engineering, Construction, and Architectural Management, 25(5): 639–653

Gong D, Rowings Jr J E (1995). Calculation of safe float use in risk-analysis-oriented network scheduling. International Journal of Project Management, 13(3): 187–194

Gould F E (2012). Managing the Construction Process: Estimating, Scheduling, and Project Control. 4th ed. Upper Saddle River, NJ: Prentice Hall

Hajdu M (2015). Point-to-point versus traditional precedence relations for modeling activity overlapping. Procedia Engineering, 123: 208–215

Hajdu M (2018). Survey of precedence relationships: Classification and algorithms. Automation in Construction, 95: 245–259

Hariga M, El-Sayegh S M (2011). Cost optimization model for the multiresource leveling problem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1): 56–64

Harris R B (1978). Precedence and Arrow Networking Techniques for Construction. New York: John Wiley and Sons

Harris R B (1990). Packing method for resource leveling (PACK). Journal of Construction Engineering and Management, 116(2): 331–350

Hashemi Doulabi S H, Seifi A, Shariat S Y (2011). Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2): 137–146

Hiyassat MAS (2000). Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4): 278–284

Hiyassat MAS (2001). Applying modified minimum moment method to multiple resource leveling. Journal of Construction Engineering and Management, 127(3): 192–198

Householder J L, Rutland H E (1990). Who owns the float? Journal of Construction Engineering and Management, 116(1): 130–133

Kyriklidis C, Vassiliadis V, Kirytopoulos K, Dounias G (2014). Hybrid nature-inspired intelligence for the resource leveling problem. Operations Research, 14(3): 387–407

Lu M, Li H (2003). Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4): 412–420

Naylor H F W (2012). Construction Project Management: Planning and Scheduling. New York: Delmar Pub

Ponce de Leon G (1986). Float ownership: Specs treatment. Cost Engineering, 28(10): 12–15

Ponz-Tienda J L, Yepes V, Pellicer E, Moreno-Flores J (2013). The resource leveling problem with multiple resources using an adaptive genetic algorithm. Automation in Construction, 29: 161–172

Popescu C M (1976). How to use CPM in practice, Part II—Resources. Austin: University of Texas at Austin

Prateapusanond A (2003). Study on a Comprehensive Practice of Total Float Pre-allocation and Management for the Application of a CPM-based Construction Contract. Dissertation for the Doctoral Degree.

Blacksburg, VA: Virginia Polytechnic Institute Project Management Institute (2017). A Guide to the Project Management Body of Knowledge (PMBOK). Pennsylvania: Project Management Institute

Qiao J, Li Y (2018). Resource leveling using normalized entropy and relative entropy. Automation in Construction, 87: 263–272

Sakka Z, El-Sayegh S (2007). Float consumption impact on cost and schedule in the construction industry. Journal of Construction Engineering and Management, 133(2): 124–130

Savin D, Alkass S, Fazio P (1996). Construction resource leveling using neural networks. Canadian Journal of Civil Engineering, 23(4): 917–925

Senouci A B, Adeli H (2001). Resource scheduling using neural dynamics model of Adeli and Park. Journal of Construction Engineering and Management, 127(1): 28–34

Son J, Skibniewski M J (1999). Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1): 23–31

Wagner H M, Giglio R J, Glaser R G (1964). Preventive maintenance scheduling by mathematical programming. Management Science, 10(2): 316–334

Wiest J D, Levy F K (1977). A Management Guide to PERT/CPM: With GERT/PDM/DCPM and Other Networks. 2nd ed. Upper Saddle River, NJ: Prentice-Hall