Updating the models and uncertainty of mechanical parameters for rock tunnels using Bayesian inference

Geoscience Frontiers - Tập 12 - Trang 101198 - 2021
Hongbo Zhao1,2, Bingrui Chen2, Shaojun Li2, Zhen Li3, Changxing Zhu3
1School of Civil and Architectural Engineering, Shandong University of Technology, Zibo 255000, Shandong, China
2State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, Hubei, China
3School of Civil Engineering, Henan Polytechnic University, Jiaozuo 454003, China

Tài liệu tham khảo

Adoko, 2017, Bayesian prediction of TBM penetration rate in rock mass, Eng. Geol., 226, 245, 10.1016/j.enggeo.2017.06.014 Beck, 2002, Bayesian updating of structural models and reliability using Markov Chain Monte Carlo simulation, J. Eng. Mech., 128, 380, 10.1061/(ASCE)0733-9399(2002)128:4(380) Beck, 1998, Updating models and their uncertainties. Part I: Bayesian statistical framework, J. Eng. Mech., 124, 455, 10.1061/(ASCE)0733-9399(1998)124:4(455) Cao, 2016, Quantification of prior knowledge in geotechnical site characterization, Eng. Geol., 203, 107, 10.1016/j.enggeo.2015.08.018 Chen, 2003, 92 Cheung, 2009, Bayesian model updating using hybrid Monte Carlo simulation with application to structural dynamic models with many uncertain parameters, J. Eng. Mech., 135, 243, 10.1061/(ASCE)0733-9399(2009)135:4(243) Jardine, R.J., Potts, D.M., Higgins, K.G., Chowdhury, R., Zhang S., Flentje, P., 2004. Reliability updating and geotechnical back-analysis, in: Proc., Advances in Geotechnical Engineering: The Skempton Conf. Thomas Telford Limited, London, 29-31 March 2004, Volume 2, 815-821. Collins, 1974, Statistical identification of structures, AIAA J., 12, 185, 10.2514/3.49190 DiazDelaO, 2017, Bayesian updating and model class selection with subset simulation, Comput. Methods Appl. Mech. Engrg., 317, 1102, 10.1016/j.cma.2017.01.006 Engelund, 1998, A probabilistic model for chloride-ingress and initiation of corrosion in reinforced concrete structures, Struct. Saf., 20, 69, 10.1016/S0167-4730(97)00022-2 Fahimifar, 2010, Analytical solution for the excavation of circular tunnels in a visco-elastic Burger’s material under hydrostatic stress field, Tunn. Undergr. Space Technol., 25, 297, 10.1016/j.tust.2010.01.002 Feng, 2015, Predicting tunnel squeezing with incomplete data using Bayesian Networks, Eng. Geol., 195, 214, 10.1016/j.enggeo.2015.06.017 Feng, 2015, Estimation of deformation modulus of rock masses based on Bayesian model selection and Bayesian updating approach, Eng. Geol., 199, 19, 10.1016/j.enggeo.2015.10.002 Feng, 2019, Prediction of time-dependent tunnel convergences using a Bayesian updating approach, Tunn. Undergr. Space Technol., 94, 103118, 10.1016/j.tust.2019.103118 Feng, 2004, A new displacement back analysis to identify mechanical geomaterial parameters based on hybrid intelligent methodology, Int. J. Numer. Anal. Methods Geomech., 28, 1141, 10.1002/nag.381 Ferrero, 2013, In-situ stress measurements interpretations in large underground marble quarry by 3D modeling, Int. J. Rock Mech. Min. Sci., 60, 103, 10.1016/j.ijrmms.2012.12.008 Gelman, 2013 Geyskens, 1998, Bayesian prediction of elastic modulus of concrete, J. Struct. Eng., 124, 89, 10.1061/(ASCE)0733-9445(1998)124:1(89) Gilbert, 1998, Uncertainty in back analysis of slopes: Kettleman Hills case history, J. Geotech. Geoenviron. Eng., 124, 1167, 10.1061/(ASCE)1090-0241(1998)124:12(1167) Gioda, 1981, Numerical identification of soil structure interaction pressures, Int. J. Numer. Anal. Methods Geomech., 5, 33, 10.1002/nag.1610050105 Goodman, 1989 Jiang, 2020, Efficient probabilistic back analysis of spatially varying soil parameters for slope reliability assessment, Eng. Geol., 271, 105597, 10.1016/j.enggeo.2020.105597 Kelly, 2015, Bayesian updating for one-dimensional consolidation measurements, Can. Geotech. J., 52, 1318, 10.1139/cgj-2014-0338 Lee, 2012 Li, 2020, Bayesian approach for sequential probabilistic back analysis of uncertain geomechanical parameters and reliability updating of tunneling-induced ground settlements, Adv. Civ. Eng. Li, 2017, Predicting rock burst hazard with incomplete data using Bayesian networks, Tunn. Undergr. Spacce Technol., 61, 61, 10.1016/j.tust.2016.09.010 Li, 2013, Slope reliability analysis by updated support vector machine and Monte Carlo simulation, Nat. Hazards, 65, 707, 10.1007/s11069-012-0396-x Li, 2016, Identifying geomechanical parameters of high cut rock slopes by an improved multi-output support vector machine method, Environ. Earth Sci., 75, 673, 10.1007/s12665-016-5491-y Luckman, 1987, Use of stochastic stability analysis for Bayesian back calculation of pore pressures acting in a cut at failure Lynch, 2007 Malakoff, 1999, Bayes offers a ‘new’ way to make sense of numbers, Science, 286, 1460, 10.1126/science.286.5444.1460 Oreste, 2005, Back analysis techniques for the improvement of the understanding of rock in underground constructions, Tunn. Undergr. Space Technol., 20, 7, 10.1016/j.tust.2004.04.002 Pant, M., Guenot, A., 1982. Analysis of convergence behind the face of a tunnel, in: Proceedings of the 3rd International Symposium, Brighton, England, pp. 197-204. Papadimitriou, 2001, Updating robust reliability using structural test data, Probab. Eng. Mech., 16, 103, 10.1016/S0266-8920(00)00012-6 Papaioannou, 2012, Reliability updating in geotechnical engineering including spatial variability of soil, Comput. Geotech., 42, 44, 10.1016/j.compgeo.2011.12.004 Park, 2005, Probabilistic analysis of rock slope stability and random properties of discontinuity parameters, Interstate Highway 40, Western North Carolina, USA. Eng. Geol., 79, 230, 10.1016/j.enggeo.2005.02.001 Peck, 1969, Advantages and limitations of the observational method in applied soil mechanics, Géotechnique, 19, 171, 10.1680/geot.1969.19.2.171 Pichler, 2003, Back analysis of model parameters in geotechnical engineering by means of soft computing, Int. J. Numer. Methods Eng., 57, 1943, 10.1002/nme.740 Sakurai, 1983, Back analysis of measured displacements of tunnels, Rock Mech. Rock Eng., 16, 173, 10.1007/BF01033278 Straub, 2010, Bayesian network enhanced with structural reliability methods: Application, J. Eng. Mech., 136, 1259, 10.1061/(ASCE)EM.1943-7889.0000170 Sun, 2019, Bayesian updating for progressive excavation of high rock slopes using multi-type monitoring data, Eng. Geol., 252, 1, 10.1016/j.enggeo.2019.02.013 Tuia, 2011, Multi output support vector regression for remote sensing biophysical parameter estimation, IEEE Geosci. Remote Sens. Lett., 8, 804, 10.1109/LGRS.2011.2109934 Vardakos, 2012, Parameter identification in numerical modeling of tunneling using the Differential Evolution Genetic Algorithm DEGA, Tunn. Undergr. Space Technol., 28, 109, 10.1016/j.tust.2011.10.003 Wang, 2013, Probabilistic back analysis of slope failure – A case study in Taiwan, Comput. Geotech., 51, 12, 10.1016/j.compgeo.2013.01.008 Yu, 2007, An intelligent displacement back–analysis method for earth–rockfill dams, Comput. Geotech., 34, 423, 10.1016/j.compgeo.2007.03.002 Zhang, 2010, Micro-porosity structure of coarse granular soils, J. Geotech. Geoenviron. Eng., 136, 1425, 10.1061/(ASCE)GT.1943-5606.0000348 Zhang, 2010, Efficient probabilistic back–analysis of slope stability model parameters, J. Geotech. Geoenviron. Eng., 136, 99, 10.1061/(ASCE)GT.1943-5606.0000205 Zhang, 2012, Characterising geotechnical model uncertainty by hybrid Markov Chain Monte Carlo simulation, Comput. Geotech., 43, 26, 10.1016/j.compgeo.2012.02.002 Zhang, 2013, Probabilistic parameter estimation and predictive uncertainty based on field measurements for unsaturated soil slope, Comput. Geotech., 48, 72, 10.1016/j.compgeo.2012.09.011 Zhao, 2015, A practical indirect back analysis approach for geomechanical parameters identification, Mar. Geores. Geotechnol., 33, 212, 10.1080/1064119X.2013.836258 Zhao, 2009, Geomechanical parameters identification by particle swarm optimization and support vector machine, Appl. Math. Model., 33, 3997, 10.1016/j.apm.2009.01.011 Zhao, 2016, Inverse analysis of geomechanical parameters by the artificial bee colony algorithm and multi-output support vector machine, Inverse Probl. Sci. Eng., 24, 1266, 10.1080/17415977.2016.1178257 Zheng, 1998, Role of non-destructive evaluation in time-dependent reliability analysis, Struct. Saf., 20, 325, 10.1016/S0167-4730(98)00021-6