Two due date assignment problems in scheduling a single machine

Operations Research Letters - Tập 34 - Trang 683-691 - 2006
Dvir Shabtay1, George Steiner1
1Michael G. DeGroote School of Business, Management Science and Information Systems Area, McMaster University, Hamilton, Ontario, Canada L8S 4M4

Tài liệu tham khảo

Bagchi, 1986, Minimizing mean absolute deviation of completion times about a common due date, Naval Res. Logistics, 33, 227, 10.1002/nav.3800330206 Bagchi, 1986, Minimizing mean squared deviation of completion times about a common due date, Manage. Sci., 33, 894, 10.1287/mnsc.33.7.894 Baker, 1990, Sequencing with earliness and tardiness penalties: a review, Oper. Res., 38, 22, 10.1287/opre.38.1.22 Birman, 2004, A note on due-date assignment in a two-machine flow-shop, Comput. Oper. Res., 31, 473, 10.1016/S0305-0548(02)00225-3 Chen, 1996, Scheduling and common due date assignment with earliness–tardiness penalties and batch delivery costs, Eur. J. Oper. Res., 93, 49, 10.1016/0377-2217(95)00133-6 Cheng, 1996, Batch scheduling and common due-date assignment on a single machine, Discrete Appl. Math., 70, 231, 10.1016/0166-218X(96)80468-9 De, 1991, Optimal delivery time quotation and order sequencing, Decision Sci., 22, 379, 10.1111/j.1540-5915.1991.tb00353.x Du, 1990, Minimizing total tardiness on one machine is NP-hard, Math. Oper. Res., 15, 483, 10.1287/moor.15.3.483 Gordon, 2002, A survey of the state-of-the-art of common due date assignment and scheduling research, Eur. J. Oper. Res., 139, 1, 10.1016/S0377-2217(01)00181-3 Graham, 1979, Optimization and approximation in deterministic sequencing and scheduling: a survey, Ann. Discrete Math., 5, 287, 10.1016/S0167-5060(08)70356-X Hall, 1991, Earliness–tardiness scheduling problems 1: weighted deviation of completion times about a common due date, Oper. Res., 39, 836, 10.1287/opre.39.5.836 Kahlbacher, 1993, Parallel machine scheduling to minimize costs for earliness and number of tardy jobs, Discrete Appl. Math., 47, 139, 10.1016/0166-218X(93)90088-6 Karp, 1972, Reducibility among combinatorial problems Lawler, 1977, A pseudopolynomial time algorithm for sequencing jobs to minimize total tardiness, Ann. Discrete Math., 1, 331, 10.1016/S0167-5060(08)70742-8 Mosheiov, 2001, A common due-date assignment problem on parallel identical machines, Comput. Oper. Res., 28, 719, 10.1016/S0305-0548(99)00127-6 Panwalkar, 1992, Single-machine sequencing with controllable processing times, Eur. J. Oper. Res., 59, 298, 10.1016/0377-2217(92)90144-X Panwalkar, 1982, Common due date assignment to minimize total penalty for the one machine scheduling problem, Oper. Res., 30, 391, 10.1287/opre.30.2.391 Papadimitriu, 1982 Potts, 1985, A branch and bound algorithm for the total weighted tardiness problem, Oper. Res., 33, 363, 10.1287/opre.33.2.363 Sahni, 1976, Algorithms for scheduling independent tasks, J. Assoc. Comput. Mach., 23, 116, 10.1145/321921.321934 Seidmann, 1981, Optimal assignment of due dates for a single processor scheduling problem, Int. J. Prod. Res., 19, 393, 10.1080/00207548108956667 Slotnick, 2005, Manufacturing lead-time rules: customer retention versus tardiness costs, Eur. J. Oper. Res., 169, 825, 10.1016/j.ejor.2003.07.023 Smith, 1956, Various optimizers for single-stage production, Naval Res. Logistics Q., 3, 59, 10.1002/nav.3800030106 Tapan, 2003, Static scheduling research to minimize weighted and unweighted tardiness: a state-of-the-art, Int. J. Prod. Econ., 83, 1, 10.1016/S0925-5273(02)00265-7