Two Formulations for non-Interference Parallel Machine Scheduling Problems

IFAC-PapersOnLine - Tập 48 - Trang 272-276 - 2015
Gabriela Naves Maschietto1, Yassine Ouazene2, Farouk Yalaoui2, Maurício Cardoso de Souza1, Martín Goméz Ravetti1
1Universidade Federal de Minas Gerais, Belo Horizonte, Brazil
2Université de Technologie de Troyes, Troyes, France

Tài liệu tham khảo

Bielli, 2006, Object oriented model for container terminal distributed simulation, European Journal of Operational Research, 175, 1731, 10.1016/j.ejor.2005.02.037 Bierwirth, 2009, A fast heuristic for quay crane scheduling with interference constraints, Journal of Scheduling, 12, 345, 10.1007/s10951-009-0105-0 Bierwirth, 2010, A survey of berth allocation and quay crane scheduling problems in container terminals, European Journal of Operational Research, 202, 615, 10.1016/j.ejor.2009.05.031 Chung, 2012, A modified genetic algorithm for quay crane scheduling operations, Expert Systems with Applications, 39, 4213, 10.1016/j.eswa.2011.09.113 da Silva Neto, 2013, Montagem de cargas e sequen-ciamento de caminhões em um centro de distribuição Keha, 2009, Mixed integer programming formulations for single machine scheduling problems, Computers & Industrial Engineering, 56, 357, 10.1016/j.cie.2008.06.008 Kim, 2004, A crane scheduling method for port container terminals, European Journal of operational research, 156, 752, 10.1016/S0377-2217(03)00133-4 Lee, 2008, Quay crane scheduling with non-interference constraints in port container terminals, Transportation Research Part E: Logistics and Transportation Review, 44, 124, 10.1016/j.tre.2006.08.001 Li, 2009, Discrete time model and algorithms for container yard crane scheduling, European Journal of Operational Research, 198, 165, 10.1016/j.ejor.2008.08.019 Ng, 2005, Crane scheduling in container yards with inter-crane interference, European Journal of Operational Research, 164, 64, 10.1016/j.ejor.2003.11.025 Rocha, 2008, Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times, Computers & Operations Research, 35, 1250, 10.1016/j.cor.2006.07.015 Tang, 2014, Crane scheduling in a warehouse storing steel coils, IIE Transactions, 46, 267, 10.1080/0740817X.2013.802841 Xie, 2014, Multi-crane scheduling in steel coil warehouse, Expert Systems with Applications, 41, 2874, 10.1016/j.eswa.2013.10.022 Zäpfel, 2006, Warehouse sequencing in the steel supply chain as a generalized job shop model, International Journal of Production Economics, 104, 482, 10.1016/j.ijpe.2004.10.005 Zeng, 2009, Integrating simulation and optimization to schedule loading operations in container terminals, Computers & Operations Research, 36, 1935, 10.1016/j.cor.2008.06.010