Time-cost tradeoff analysis with minimized project financing cost

Automation in Construction - Tập 98 - Trang 110-121 - 2019
S.M. Reza Alavipour1, David Arditi1
1Dept. of Civil and Architectural Engineering, Illinois Institute of Technology, Chicago, IL 60616, United States of America

Tài liệu tham khảo

Burns, 1996, The LP/IP hybrid method for construction time-cost trade-off analysis, Constr. Manag. Econ., 14, 265, 10.1080/014461996373511 Feng, 1997, Using genetic algorithms to solve construction time-cost trade-off problems, J. Comput. Civ. Eng., 11, 184, 10.1061/(ASCE)0887-3801(1997)11:3(184) Adeli, 1997, Scheduling/cost optimization and neural dynamics model for construction, J. Constr. Eng. Manag., 123, 450, 10.1061/(ASCE)0733-9364(1997)123:4(450) Chen, 2009, A two-phase GA model for resource-constrained project scheduling, Autom. Constr., 18, 485, 10.1016/j.autcon.2008.11.003 Long, 2009, A genetic algorithm-based method for scheduling repetitive construction projects, Autom. Constr., 18, 499, 10.1016/j.autcon.2008.11.005 Senouci, 2001, Resource scheduling using neural dynamics model of Adeli and park, J. Constr. Eng. Manag., 127, 28, 10.1061/(ASCE)0733-9364(2001)127:1(28) Elazouni, 2004, Finance-based scheduling of construction projects using integer programming, J. Constr. Eng. Manag., 130, 15, 10.1061/(ASCE)0733-9364(2004)130:1(15) Ali, 2009, Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities, Constr. Manag. Econ., 27, 839, 10.1080/01446190903191764 Elazouni, 2007, Expanding finance-based scheduling to devise overall-optimized project schedules, J. Constr. Eng. Manag., 133, 86, 10.1061/(ASCE)0733-9364(2007)133:1(86) El-Abbasy, 2016, MOSCOPEA: multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm, Autom. Constr., 71, 153, 10.1016/j.autcon.2016.08.038 El-Abbasy, 2017, Generic scheduling optimization model for multiple construction projects, J. Comput. Civ. Eng., 31, 10.1061/(ASCE)CP.1943-5487.0000659 Liu, 2008, Resource-constrained construction project scheduling model for profit maximization considering cash flow, Autom. Constr., 17, 966, 10.1016/j.autcon.2008.04.006 Fathi, 2010, GA-based multi-objective optimization of finance-based construction project scheduling, KSCE J. Civ. Eng., 14, 627, 10.1007/s12205-010-0849-2 Chen, 2009, Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints, Autom. Constr., 18, 434, 10.1016/j.autcon.2008.10.007 Eshtehardian, 2009, Fuzzy-based MOGA approach to stochastic time-cost trade-off problem, Autom. Constr., 18, 692, 10.1016/j.autcon.2009.02.001 Zhu, 2014, Calibrating rail transit assignment models with genetic algorithm and automated fare collection data, Comput. Aided Civ. Inf. Eng., 29, 518, 10.1111/mice.12075 Lee, 2015, An advanced stochastic time-cost tradeoff analysis based on a CPM-guided genetic algorithm, Comput. Aided Civ. Inf. Eng., 30, 824, 10.1111/mice.12148 Arditi, 2000, Business failures in the construction industry, Eng. Constr. Archit. Manag., 7, 120, 10.1108/eb021137 Peterson, 2013 Lu, 2016, A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM), Int. J. Proj. Manag., 34, 3, 10.1016/j.ijproman.2015.09.004 Kramer, 2010 Simpson Mitchell, 1998