Time-cost tradeoff analysis with minimized project financing cost
Tài liệu tham khảo
Burns, 1996, The LP/IP hybrid method for construction time-cost trade-off analysis, Constr. Manag. Econ., 14, 265, 10.1080/014461996373511
Feng, 1997, Using genetic algorithms to solve construction time-cost trade-off problems, J. Comput. Civ. Eng., 11, 184, 10.1061/(ASCE)0887-3801(1997)11:3(184)
Adeli, 1997, Scheduling/cost optimization and neural dynamics model for construction, J. Constr. Eng. Manag., 123, 450, 10.1061/(ASCE)0733-9364(1997)123:4(450)
Chen, 2009, A two-phase GA model for resource-constrained project scheduling, Autom. Constr., 18, 485, 10.1016/j.autcon.2008.11.003
Long, 2009, A genetic algorithm-based method for scheduling repetitive construction projects, Autom. Constr., 18, 499, 10.1016/j.autcon.2008.11.005
Senouci, 2001, Resource scheduling using neural dynamics model of Adeli and park, J. Constr. Eng. Manag., 127, 28, 10.1061/(ASCE)0733-9364(2001)127:1(28)
Elazouni, 2004, Finance-based scheduling of construction projects using integer programming, J. Constr. Eng. Manag., 130, 15, 10.1061/(ASCE)0733-9364(2004)130:1(15)
Ali, 2009, Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities, Constr. Manag. Econ., 27, 839, 10.1080/01446190903191764
Elazouni, 2007, Expanding finance-based scheduling to devise overall-optimized project schedules, J. Constr. Eng. Manag., 133, 86, 10.1061/(ASCE)0733-9364(2007)133:1(86)
El-Abbasy, 2016, MOSCOPEA: multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm, Autom. Constr., 71, 153, 10.1016/j.autcon.2016.08.038
El-Abbasy, 2017, Generic scheduling optimization model for multiple construction projects, J. Comput. Civ. Eng., 31, 10.1061/(ASCE)CP.1943-5487.0000659
Liu, 2008, Resource-constrained construction project scheduling model for profit maximization considering cash flow, Autom. Constr., 17, 966, 10.1016/j.autcon.2008.04.006
Fathi, 2010, GA-based multi-objective optimization of finance-based construction project scheduling, KSCE J. Civ. Eng., 14, 627, 10.1007/s12205-010-0849-2
Chen, 2009, Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints, Autom. Constr., 18, 434, 10.1016/j.autcon.2008.10.007
Eshtehardian, 2009, Fuzzy-based MOGA approach to stochastic time-cost trade-off problem, Autom. Constr., 18, 692, 10.1016/j.autcon.2009.02.001
Zhu, 2014, Calibrating rail transit assignment models with genetic algorithm and automated fare collection data, Comput. Aided Civ. Inf. Eng., 29, 518, 10.1111/mice.12075
Lee, 2015, An advanced stochastic time-cost tradeoff analysis based on a CPM-guided genetic algorithm, Comput. Aided Civ. Inf. Eng., 30, 824, 10.1111/mice.12148
Arditi, 2000, Business failures in the construction industry, Eng. Constr. Archit. Manag., 7, 120, 10.1108/eb021137
Peterson, 2013
Lu, 2016, A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM), Int. J. Proj. Manag., 34, 3, 10.1016/j.ijproman.2015.09.004
Kramer, 2010
Simpson
Mitchell, 1998