The use of the SACADA taxonomy to analyze simulation records: Insights and suggestions

Reliability Engineering & System Safety - Tập 159 - Trang 174-183 - 2017
J. Park1, Y.J. Chang2, Y. Kim1, S. Choi1, S. Kim1, W. Jung1
1Korea Atomic Energy Research Institute (KAERI), South Korea
2U.S. Nuclear Regulatory Commission (NRC), South Korea

Tài liệu tham khảo

American Society of Mechanical Engineers/American National Standard (ASME/ANS). Standard for level 1/large early release frequency probabilistic risk assessment for nuclear power plant applications, ASME/ANS RA-Sa-2009, Addenda to ASME/ANS RA-S-2008; 2009. Bareith, A., Karsa, Z. Simulator data collection for HRA purpose at NPP PAKS, Hungary. In: simulator data for HRA purposes, OECD/NEA workshop, November 4–6, Budapest, Hungary; 2009 Beare, 1984 Chang, 2012 Chang, 2014, The SACADA database for human reliability and human performance, Reliab Eng Syst Saf, 125, 117, 10.1016/j.ress.2013.07.014 Combustion Engineering Owners Group (CEOG). Model for failure of RCP seals given loss of seal cooling, CEOG Task 1136, CE NPSD-1199-NP; 2000. Forester, 2006 Gertman, 2005 Hallbert, 2006, 1 Hallbert, 2014 Hirschberg, S Dang VN. Critical operator actions: human reliability modeling and data issues Final task report for Principal Working Group 5, Task94-1, OECD/NEA; 1996. International Atomic Energy Agency (IAEA). Collection and classification of human reliability data for use in probabilistic safety assessments. IAEA-TECDOC-1048, Vienna; 1998. Institute of Electrical and Electronics Engineers (IEEE). IEEE guide for incorporating human action reliability analysis for nuclear power generating stations. IEEE Std. 1082, Revised in 2010; 1997. International Atomic Energy Agency (IAEA). Regulatory review of probabilistic safety assessment (PSA) level 1. IAEA-TECDOC-1135, Vienna; 2000. International Atomic Energy Agency (IAEA). Safety assessment and verification for nuclear power plants. IAEA-NS-G-1.2, Vienna; 2001. International Atomic Energy Agency (IAEA). Development and application of level 1 probabilistic safety assessment for nuclear power plants. IAEA-SSG-3, Vienna; 2010. Japan Nuclear Energy Safety Organization (JNES). Human reliability data collection and evaluation guideline. Draft version 3 (written in Japanese); 2009. Kim, 2015, Identification human-induced initiating events in the low power and shutdown operation using the commission error search and assessment method, Nucl Eng Technol, 47, 187, 10.1016/j.net.2014.12.006 Kim, 2015, A statistical approach to estimating effects of performance shaping factors on human error probabilities of soft controls, Reliab Eng Syst Saf, 142, 378, 10.1016/j.ress.2015.06.004 Kirwan, 1994 Kirwan B, Basra G, Taylor-Adams SE, CORE-data: a computerized human error database for human reliability support, In: Proceedings on IEEE sixth annual human factors meeting. Orlando, Florida; 1997. p. 9-7–12. Kolaczkowski, 2005 Labarthe JP, Garza CD, The human factors evaluation program of a control room: the French EPR approach. Hum Factors Ergon Manuf Serv Ind. vol. 21(4). p. 331–49. Lee, 2013, Quantitative estimation of the human error probability during soft control operations, Ann Nucl Energy, 57, 318, 10.1016/j.anucene.2013.02.018 Lin, 2010, Evaluation of operators' performance for automation design in the fully digital control room of nuclear power plants, Hum Factors Ergon Manuf Serv Ind, 20, 10 Lois E, Dang VN, Forester J, Broberg H, Massaiu S, Hildebrandt M, Braarud PØ, Parry G, Julius J, Boring R, Männistö I, Bye A. International HRA empirical study – description of overall approach and pilot phase results from comparing HRA methods to simulator performance data, NUREG/IA-2016, vol. 1, U.S. Nuclear Regulatory Commission, Washington, DC (also issued as HWR-844, OECD Halden Reactor ProjectWork Report, Halden, Norway, 2008); 2009. Moieni, 1994, Advances in human reliability analysis methodology. Part I: frameworks, models and data, Reliab Eng Syst Saf, 44, 27, 10.1016/0951-8320(94)90105-8 Nuclear Energy Agency (NEA). HRA data and recommended actions to support the collection and exchange of HRA data. Report of working group on risk assessment, nuclear energy agency, NEA/CSNI/R(2008)9; 2008. Nuclear Energy Institute (NEI). Probabilistic risk assessment (PRA) peer review process guidance, NEI 00-02, Rev. A3; 2000. Park, 2007, OPERA – a human performance database under simulated emergencies of nuclear power plants, Reliab Eng Syst Saf, 92, 503, 10.1016/j.ress.2006.01.007 Park, 2013 Park, 2014 Pasquale, 2015, A simulator for human error probability analysis (SHERPA), Reliab Eng Syst Saf, 139, 17, 10.1016/j.ress.2015.02.003 Roth, 1994, 1994 Spurgin, 2004, 7 Sträter, O. Evaluation of human reliability on the basis of operational experience, Ph.D. dissertation, economics and social science. Munich Technical University; 2000. Taylor-Adams, 1995, Human reliability data requirements, Int J Qual Reliab Manag, 12, 24, 10.1108/02656719510076221 U.S. Nuclear Regulatory Commission (NRC). CE technology cross training R325C. Available from 〈http://pbadupws.nrg.gov/docs/ML1125/ML11251A006.html〉; 2011. U.S. Nuclear Regulatory Commission (NRC). Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors, NUREG-1122, Rev. 2 Supplement 1. Available at 〈http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/〉; 2007 U.S. Nuclear Regulatory Commission (NRC), Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling Water Reactors, NUREG-1123, Rev. 2. Supp. 1. Available at 〈http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/〉; 2007. U.S. Nuclear Regulatory Commission (NRC). Operator licensing examination standards for power reactor, NUREG-1021, Rev. 10. Available at 〈http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/〉; 2014. Werner, 1995, Results and insights from level-1 probabilistic safety assessments for nuclear power plants in France, Germany, Japan, Sweden, Switzerland, and the United States, Reliab Eng Syst Saf, 48, 165, 10.1016/0951-8320(95)00016-U