The performance measurement of construction projects managed by ISO-certified contractors in Malaysia
Tóm tắt
Từ khóa
Tài liệu tham khảo
Abdul-Rahman, H. (1994) Towards project – Wide quality management in construction. Seminar on Building towards the 21st Century through Improving Construction Industry Performance; 8 September, Kuala Lumpur.
Ahmed, S.M. and Kangari, R. (1995) Analysis of client-satisfaction factors in construction industry. Journal Management in Engineering 11 (2): 36–44.
Andi and Minato, T. (2003) Design documents quality in Japanese construction industry. International Journal of Project Management 21: 537–546.
Arditi, D. and Gunaydin, H.M. (1997) Total quality management in the construction process. International Journal of Project Management 15 (4): 235–243.
Atkinson, R. (1999) Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management 17 (6): 337–342.
Barber, P., Graves, A., Hall, M., Sheath, D. and Tomkins, C. (2000) Quality failure costs in civil engineering projects. International Journal of Quality & Reliability Management 17 (4/5): 479–492.
Barkley, B. and Saylor, J. (1994) Customer-driven Project Management. New York: McGraw-Hill.
Biazzo, S. and Bernardi, G. (2003) Process management practices and quality systems standards: Risks and opportunities of the new ISO 9001 certification. Business Process Management Journal 9 (2): 149–169.
BS 5750. (1987) Quality Systems. Specification for Design, Development, Production, Installation and Servicing. UK: The British Standards Institution.
BSRIA. (2003) Customer satisfaction service for M&E contractors: A proposal report, http://www.bsria.co.uk/goto/content.asp?section¼services&content¼constructionþpractice&service¼customerþsatisfactionþresearchþforþm%26eþcontractors&page¼1&lang .
Bubshait, A.A. and Almohawis, S.A. (1994) Evaluating the general conditions of a construction contract. International Journal of Project Management 12 (3): 133–135.
Chan, A.P.C. (2001) Time-cost relationship of public sector projects in Malaysia. International Journal of Project Management 19: 223–229.
Chan, A.P.C. and Tam, C.M. (2000) Factors affecting the quality of building projects in Hong Kong. International Journal of Quality & Reliability Management 17 (4/5): 423–441.
Chan, A.P.C., Scott, D. and Lam, E.W.M. (2002) Framework of success criteria for design/build projects. Journal of Management in Engineering 18 (3): 120–128.
Chini, A.R. and Valdez, H.E. (2003) ISO 9000 and the U.S. construction industry. Journal of Management in Engineering, ASCE 19 (2): 78–82.
Cianfrani, C.A., Tsiakais, J.J. and West, J. (2002) ISO 9000:2000 Handbook. USA: ASQ Quality Press.
Coleman, S. and Douglas, A. (2003) Where next for ISO 9000 companies? The TQM Magazine 15 (2): 88–92.
Contract Journal. (2004) Holy rood building four months late and £30m over budget, http://www.contractjournal.com .
De Vaus, D. (1991) Surveys in Social Research. North Sydney: Allen & Unwin.
Ebrahimpour, M., Withers, B.E. and Hikmet, N. (1997) Experiences of US- and foreign-owned firms: A new perspective on ISO 9000 implementation. International Journal of Production Research 35 (2): 569–576.
Ganaway, N.B. (2006) Construction Business Management: A Guide to Contracting for Business Success. London: Butterworth-Heinemann.
Georgy, M.E., Chang, L.M. and Zhang, L. (2005) Prediction of engineering performance: A Neurofuzzy approach. Journal of Construction Engineering and Management 131 (5): 548–557.
Gillham, B. (2000) Developing a Questionnaire. London: Continuum.
Hill, N., Self, B. and Roche, G. (2002) Customer Satisfaction Measurement for ISO 9000:2000. Oxford: Butterworth-Heinemann.
Kartha, C.P. (2002) ISO 9000:2000 quality management systems standards: TQM focus in the new revision. The Journal of American Academy of Business 2: 1–6.
Kometa, S., Olomolaiye, P.O. and Harris, F.C. (1995) An evaluation of clients’ needs and responsibilities in the construction process. Engineering, Construction and Architectural Management 2 (1): 45–56.
Kumaraswamy, M.M. and Thorpe, A. (1999) Systematizing construction project evaluations. Journal of Management in Engineering 12 (1): 34–39.
Latham, M. (1994) Constructing the Team. London: HMSO.
Lee, T.Y. (1998) The development of ISO 9000 certification and the future of quality management. International Journal of Quality and Reliability Management 15 (2): 162–177.
Lesley, M. and Malcolm, M. (1992) Implementing Total Quality Management. London: Financial Times Prentice-Hall.
Lim, C. and Mohamed, M. (2000) An exploratory study into recurring construction problems. International Journal of Project Management 18: 267–273.
Locke, E.A. (1970) Job satisfaction and job performance: A theoretical analysis. Organisational Behaviour and Human Performance 5: 484–500.
Love, P.E.D., Gunasekaran, A. and Li, H. (1998) Improving the competitiveness of manufacturing companies through continuous incremental change. TQM Magazine 10 (3): 177–185.
Murphy, R.J. (2002) Implementing an ISO 9001:2000 Based Quality Management System: Including Safety and Environmental Considerations. Rockville, MD: ABS Consulting Press.
Odeh, A.M. and Battaineh, H.T. (2002) Causes of construction delay: Traditional contracts. International Journal of Project Management 20: 67–73.
Parasuraman, A., Zeithaml, V.A. and Berry, L.L. (1988) Service quality: A multi-item scale for measuring consumer perceptions of quality. Journal of Retailing 64: 13–40.
Parfitt, M.K. and Sanvido, V.E. (1993) Checklist of critical success factors for building projects. Journal of Management in Engineering 9 (3): 243–249.
Rose, K.H. (1995) A performance measurement model. Quality Progress 28 (2): 63–66.
Salter, A. and Torbett, R. (2003) Innovation and performance in engineering design. Journal of Construction Management and Economics 21: 573–580.
Soetanto, R. and Proverbs, D.G. (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research 5 (2): 233–255.
Songer, A.D. and Molenaar, K.R. (1996) Selection factors and success criteria for design-build in the US and UK. Journal of Construction Procurement 2 (2): 69–82.
Songer, A.D. and Molenaar, K.R. (1997) Project characteristics for successful public-sector design-build. Journal of Construction Engineering Management 123 (1): 34–40.
Sousa, S. and Teixeira, J. (2004) Prevention measures to reduce risk of falling from heights (in Portuguese). IX National Symposium of ISMAI, Porto: 14–15 October.
Taormina, T. (2002) Implementing ISO 9001:2000: The Journey from Conformance to Performance. Upper Saddle River, NJ: Prentice-Hall.
Terziovski, M. and Power, D. (2007) Increasing ISO 9000 certification benefits: A continuous improvement approach. International Journal of Quality & Reliability Management 24 (2): 141–163.
Terziovski, M., Power, D. and Sohal, A.S. (2003) The longitudinal effects of the ISO 9000 certification process on business performance. European Journal of Operational Research 146 (3): 580–595.
Turner, D. (1984) Standard Contracts for Building. England: George Godwin.
Willis, T.H. and Willis, W.D. (1996) A quality performance management system for industrial construction engineering projects. International Journal of Quality & Reliability Management 13 (9): 38–48.
Works Bureau. (2001) Quality Management System Certification of Consultants and Contractors for Public Works Administered by the Works Group of Departments. Hong Kong: Works Bureau Technical Circular.
Yeung, A.C.L., Lee, T.S. and Chan, L.Y. (2003) Senior management perspectives and ISO 9000 effectiveness: An empirical research. International Journal of Production Research 41 (3): 545–569.
Zuckerman, A. (2001) ISO 9000:2000 now official. World Trade 14 (4): 68–69.