The need for life‐cycle integration of project processes

Emerald - Tập 6 Số 3 - Trang 235-255 - 1999
ALIJAAFARI1, KITSANAMANIVONG1
1Department of Civil Engineering, University of Sydney, NSW 2006, Australia

Tóm tắt

The focus of this paper is on life‐cycle objective‐based project management systems in general, and SPMIS in particular. SPMIS (short for Smart Project Management Information System), has been designed: (a) to facilitate the employment of life‐cycle objective‐based project management approaches; and (b) to support concurrent engineering and construction, thus promoting greater integration of the processes under which projects are proposed and implemented. In order to validate the functions designed for SPMIS the authors undertook a detailed case study of a large capital project. The actual project management functions employed by the project team on the case project were researched and charted using the best current PM practices as the guide. While this field research shed light on the actual needs and requirements, the design of the SPMIS functions was approached from first principles in order to incorporate the basic shift from the traditional objectives of cost, time, and quality to life‐cycle objective functions, such as return on investment, facility operability, and life‐cycle integration. This paper describes the fundamental philosophy and framework for the development of life‐cycle objective function‐based project management systems in general, and contrasts these with the existing PM methods.

Từ khóa


Tài liệu tham khảo

Abdalla J.A., Artificial Intelligence and Structural Engineering. Second Int. Conf. Appl. Artif. Intel. Civ. Struct. Eng., 147

Ahn B.J., 1995, Journal of the Architectural Institute of Korea, 11, 281

Couillard J., 1995, Project Management Journal, 26, 3

10.1061/(ASCE)9742-597X(1994)10:3(46)

De Ridder H.A., 1994, Design and Construct of Complex Engineering Systems

Dharwadkar P.V., 1996, Proceedings of the Third ASCE Congress on Computing in Civil Engineering, 7

10.1680/icien.1995.28038

Haugstad T ., 1996, IPMA 96 World Congress on Project Management and 12th AFITEP Annual Meeting, June 2 4 - 2 6, 555

Howell I., 1996, International Construction Information Technology Conference, INCIT 96 Proceedings, 4

Itol K., Preparing for Construction in the 21st Century Construction Congress, 3

10.1061/(ASCE)0733-9364(1997)123:4(427)

10.1016/S0263-7863(97)00037-9

10.1061/(ASCE)0742-597X(1996)12:4(62)

10.1016/0263-7863(96)84512-1

Jaafari A., 1994, Proceedings: SCAL Convention; Construction Vision 2000, 163

Lautier, E.B. (1996) Concurrent Project Management CPM. In: IPMA 96 World Congress on Project Management and 12th AFITEP Annual Meeting, June 2 4 - 2 6 , 1996, pp.655-662.

10.1109/TBME.1985.325519

Shtub A., 1994, Engineering, Technology, and Implementation, 434

Storm, P. (1996)

Tah J.H.M., 1995, Computing in Civil Engineering (New York), 1, 672

Webb A., 1996, Project Manager Today