The impacts of uncertainty in the predicted dam breach floods on economic damage estimation

KSCE Journal of Civil Engineering - Tập 7 Số 3 - Trang 343-350 - 2003
Jong-Seok Lee1, Joon Woo Noh2
1Member of KSCE, Senior Researcher, Korea Institute of Construction & Transportation Technology Evaluation and Planning, Korea
2Member of KSCE, Research Engineer, Dept. of Civil Engineering, Colorado State University, Colorado, USA

Tóm tắt

Từ khóa


Tài liệu tham khảo

Bohn, M.P., Whleer, T.A., and Parry, G.W. (1988)Approaches to uncertainty analysis in probabilistic risk assessment, NUREG/CR-4836, SAND 87-0871, U.S.A.

Bowles, D.S. (2000) “Advances in the practice and use of portfolio risk assessment.”Proceedings of the 2000 Australian Committee on Large Dams (ANCOLD) Annual Meeting, Cairns, Queensland, Australia.

Charles Yoe (1992) “Quantitative risk assessment and technology transfer: Software developments.”Risk-based decision making in water resources V, ASCE. pp. 92–107.

Federal Energy Regulatory Commission (1991)Engineering guidelines for evaluation of hydropower projects, Office of Hydropower Licensing, Washington, D.C., U.S.A.

Fread, D.L. (1981) “Some limitations of dam break flood routing models,”ASCE Fall Convention, St. Louis, MO, U.S.A., p. 15.

Fread, D.L. (1984)DAMBRK: The NWS Dam-Break Flood Forecasting Model, National Weather Service (NWS), Maryland, U.S.A.

Froehlich, D.C. (1995), “Embankment dam breach parameters revisited.”ASCE Conference on Water Resources Engineering, San Antonio, TX, U.S.A.

Jarrett, R.D. (1984), “Hydraulics of high gradient streams,”J. of hydraulic engineering, ASCE, Vol. 10, No. 11, pp. 1519–1539.

Lee J.S. (2002) “Uncertainty in dam breach flood routing results for dam safety risk assessment.”Korea water engineering research, Vol. 3, No. 4, pp. 215–234.

Karl, M.D. (1998). “Risk analysis of a seepage/piping dam safety issue.”Managing the risks of dam project development, safety and operation: Eighteenth annual USCOLD lecture series, Buffalo, NY, U.S.A.

Kung C.S. and Yang X.L. (1993)Dam-break flood simulation and river parameter uncertainty, Royal Institute of technology, Stockholm, Sweden.

Morgan, M.G. and Henrion, M. (1990)Uncertainty: A guide to dealing with uncertainty in quantitative risk and policy analysis, Cambridge university press, NY, U.S.A.

Moore, D.S. and McCabe, G.P. (1993)Introduction to the practice of statistics, W.H. Freeman and Company, NY, U.S.A.

National Weather Service (1998)National Weather Service FLDWAV MODEL, Version 1.0, Hydrologic research laboratory, Office of hydrology, National Weather Service (NWS), NOAA.

Palisade Corporation (1996)Guide to using @Risk. Risk analysis and simulation add-in for Microsoft Excell or Lotus 1-2-3, Newfield, NY, U.S.A.

RAC Engineers & Economists and U.S. Army Corps of Engineers (1999)Alamo Dam Demonstration Risk Assessment: Summary Report (Draft report), Los Angeles District, LA, U.S.A.

U.S. Army Corps of Engineers (1986)General report flood emergency plan for Alamo Dam, Los Angeles District, LA, U.S.A.

U.S. Army Corps of Engineers (1992)Guidelines for risk and uncertainty analysis in water resources planning, Volume II. IWR Report92-R-2, U.S.A.

Vick, S. and Stewart, R. (1996) “Risk analysis in dam safety practice, Uncertainty in the geologic environment: From theory to practice.”Geotechnical Special Publication, ASCE, No. 58, pp. 586–603.

Von Thun, Lawrence, J., and Gillette, D.R. (1990) “Guidance on breach parameters.” Unpublished manuscript, p. 15.

Wahl, T.L. (1998) Predictionof embankment dam breach parameters: A literature review and needs assessment, DSO-98-004, U.S. Bureau of Reclamation, U.S.A..