The impact of contractors' management capability on cost and time performance of construction projects in Nigeria
Tóm tắt
Từ khóa
Tài liệu tham khảo
Abiola, R.O. (2000), “Management implications of trends in the construction cost in Nigeria”, The Quantity Surveyor, Vol. 30 No. 11, pp. 35‐40.
Adams, O.A. (1990), “Improving indigenous construction capacity need of management training and development”, The Professional Builder, Vol. 6 No. 3, pp. 48‐55.
Ajanlekoko, J.O. (1990), “The rise in costs of building materials and the structural adjustment programme – how proportionate?”, The Nigerian Quantity Surveyor, Vol. 9, pp. 44‐52.
Aje, I.O. (2008), “The impact of contractors' prequalification and criteria of award on construction project performance in Lagos and Abuja, Nigeria”, unpublished PhD thesis, The School of Postgraduate Studies Federal University of Technology, Akure.
Aje, I.O., Olatunji, O.A. and Odugbuye, O. (2007), “Evaluating health and safety performance of some major Nigerian construction sites”, paper presented at CIB World Building Congress, Cape Town, May 14‐18.
Ajibade, A.O. (2006), “The impact of contractors management capability on construction project performance in Nigeria”, unpublished B.Tech. dissertation, Federal University of Technology, Akure.
Akande, C.S.O. (1993), “Contract system in Nigeria: which way forward? – a return to sanity”, Construction in Nigeria, Vol. 8, pp. 4‐7.
Akintoye, A. and Fitzgerald, E. (2000), “A survey of current cost estimating practices in the UK”, Construction Management and Economics, Vol. 18 No. 2, pp. 161‐72.
Budget Monitoring and Price Intelligent Unit (2005), The ABC of the Contract Due Process Policy. A Manual on Public Procurement Reform Programme in Nigeria, 1st ed., Government Press, Abuja.
Bureau of Public Procurement (2007), Public Procurement Act 2007, Bureau of Public Procurement, Abuja.
Cheung, S.O., Wong, P.S.P., Fung, A.S.Y. and Coffey, W.V. (2006), “Predicting project performance through neural networks”, International Journal of Project Management, Vol. 24, pp. 204‐15.
Chua, D.K.H., Kog, Y.C. and Loh, P.K. (1999), “Critical success factors for different project objectives”, Journal of Construction Engineering and Management, Vol. 125 No. 3, pp. 142‐50.
Fellows, R. and Liu, A. (1997), Research Methods for Construction, Blackwell Science, London.
Harris, F.C. and McCaffer, R. (1995), Modern Construction Management, 4th ed., Blackwell Scientific, Oxford.
Hatush, Z. and Skitmore, R.M. (1997a), “Criteria for contractor selection”, Construction Management and Economics, Vol. 15 No. 1, pp. 19‐38.
Hatush, Z. and Skitmore, R.M. (1997b), “Evaluating contractor prequalification data: selection criteria and project success factors”, Construction Management and Economics, Vol. 15 No. 2, pp. 129‐47.
Hatush, Z. and Skitmore, R.M. (1998), “Contractor selection using multiattribute utility theory: an additive model”, Building and Environment, Vol. 33 Nos 2/3, pp. 105‐15.
Holt, G.D. (1996), “Applying cluster analysis to construction contractors' classification”, Building and Environment, Vol. 31 No. 6, pp. 557‐68.
Holt, G.D. (1998), “Which contractor selection methodology”, International Journal of Project Management, Vol. 16 No. 3, pp. 153‐64.
Holt, G.D., Olomolaiye, P.O. and Harris, F.C. (1994), “Factors influencing UK construction clients choice of contractors”, Building and Environment, Vol. 29 No. 2, pp. 241‐8.
Holt, G.D., Olomolaiye, P.O. and Harris, F.C. (1995), “A review of contractor selection practice in the UK construction industry”, Building and Environment, Vol. 30 No. 4, pp. 553‐61.
Jaselskis, J. and Russell, J.S. (1992), “Risk analysis approach to selection of contractor evaluation method”, Journal of Construction Engineering and Management, Vol. 118 No. 4, pp. 814‐21.
Kaming, P.F., Olomolaiye, P.O., Holt, G.D. and Harris, F.C. (1997), “Factors influencing construction time and cost overruns on high rise projects in Indonesia”, Construction Management and Economics, Vol. 15 No. 1, pp. 83‐94.
McCaffer, R. (1979), “Bidding behaviour”, Quantity Surveying (New Zealand), August 12‐15, pp. 6‐13.
Mansfield, N.R., Ugwu, O.O. and Doran, T. (1994), “Causes of delay and cost overruns in Nigerian construction projects”, International Journal of Project Management, Vol. 12 No. 4, pp. 254‐60.
Odusami, K.T. (1998), “Pre‐qualification and selection of contractors”, Construction in Nigeria, Vol. 13 No. 1, pp. 26‐32.
Ogunsemi, D.R. and Aje, I.O. (2006), “A model for contractor selection in Nigeria”, Journal of Financial Management of Property and Construction, Vol. 11 No. 1, pp. 33‐43.
Ogunsemi, D.R. and Jagboro, G.O. (2006), “Time‐cost model for building projects in Nigeria”, Construction Management and Economics, Vol. 24, January‐March, pp. 258‐353.
Ogunsemi, D.R., Aje, I.O., Awodele, O.A. and Abiola‐Falemu, J.O. (2006), “An assessment of contractors prequalification criteria in Nigeria”, Proceedings of the Quantity Surveying National Convention, University of Sains, Penang Malaysia, September 4‐5, pp. 34‐45.
Omole, A.O. (2002), “Case study of a life project bewildered by risks claims and disputes (A Review of ICE Condition of Contract)”, paper presented at three‐day workshop, Managing Risks, Contractual Claims and Disputes in Engineering Projects, Nigeria Society of Engineers, Lagos, July.
Osoba, E.B. (1993), “Construction site management training”, Construction in Nigeria, Vol. 10 No. 1, pp. 9‐15.
Piertroforte, R., Bon, R. and Gregori, T. (2000), “Regional development and construction in Italy: an input – output analysis; 1959‐1992”, Construction Management and Economics, Vol. 18, pp. 151‐9.
Russell, J.S., Jaselskis, E.Y. and Lawrence, S.P. (1997), “Continuous assessment of project performance”, Journal of Construction Engineering and Management, Vol. 123 No. 1, pp. 64‐71.
Shash, A.A. and Abdul‐Hadi, N.H. (1993), “The effect of contractor size on mark ‐up size decision in Saudi Arabia”, Construction Management and Economics, Vol. 11, pp. 421‐9.
Tarawneh, S.A. (2004), “Evaluation of prequalification criteria‐ client perspective; Jordan case study”, Journal of Applied Sciences, Vol. 4 No. 3, pp. 354‐63.
Wong, C.H. and Holt, G.D. (2003), “Developing a contractor classification model using a multivariate discriminate analysis approach”, RICS Foundation Research Paper Series, Vol. 4 No. 20, pp. 1‐23.
Xiano, H. and Proverbs, D. (2005), “Factors influencing contractors performance: an international investigation”, Engineering, Construction and Architectural Management, Vol. 10 No. 5, pp. 322‐32.
Adams, S. (1989), Practical Buildability, C.I.R.I.A. Building Design Report, Butterworth, London.
Alarcon, L.F. and Ashey, D.B. (1996), “Modelling project performance for decision making”, Journal of Construction Engineering and Management, Vol. 122 No. 3, pp. 265‐73.
Lim, C.S. and Mohamed, M.Z. (1999), “Criteria for project success: an explanatory examination”, International Journal of Project Management, Vol. 17 No. 4, pp. 243‐8.
Torbica, Z.M. and Stroh, R.C. (1999), “An assessment model for quality performance control in residential construction”, ASCE Proceedings of the 35th Annual Conference, California Polytechnique, State University, San Lius Obisco, California, pp. 363‐70.