The effects of height and vertical position of slot on the reduction of scour hole depth around bridge abutments

Ain Shams Engineering Journal - Tập 10 - Trang 651-659 - 2019
Mehdi Osroush1, Seyed Abbas Hosseini1, Amir Abbas Kamanbedast2, Amir Khosrojerdi3
1Department of Civil Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran
2Department of Water Science and Engineering, Ahvaz Branch, Islamic Azad University, Ahvaz, Iran
3Agricultural Sciences and Food Industries Faculty, Science and Research Branch, Islamic Azad University, Tehran, Iran

Tài liệu tham khảo

Johnson, 1998, Probabilistic bridge scour estimates, J Hydraul Eng, 124, 750, 10.1061/(ASCE)0733-9429(1998)124:7(750) Kwan TF. A study of abutment scour. New Zealand; 1988. Wong WH. Scour at bridge abutments. No. Monograph; 1982. Dongol, 1994 Kothyari, 2001, Scour around spur dikes and bridge abutments, J Hydraul Res, 39, 367, 10.1080/00221680109499841 Barbhuiya, 2004, Local scour at abutments: a review, Sadhana, 29, 449, 10.1007/BF02703255 Kumar, 1999, Reduction of local scour around bridge piers using slots and collars, J Hydraul Eng, 125, 1302, 10.1061/(ASCE)0733-9429(1999)125:12(1302) Chiew, 1992, Scour protection at bridge piers, J Hydraul Eng, 118, 1260, 10.1061/(ASCE)0733-9429(1992)118:9(1260) Monocad, 2009, Scour protection of circular bridge piers with collars and slots, J Hydraul Res, 47, 119, 10.3826/jhr.2009.3244 Radice, 2012, On flow-altering countermeasures for scour at vertical-wall abutment, Arch Hydro-Eng Environ Mech, 59, 137 Setia, 2013, Sour protection by a slot through a model bridge Pier, J Indian Water Res Soc, 33, 9 EL-Ghorab, 2013, Reduction of scour around bridge piers using a modified method for vortex reduction, Alexandria Eng J, 52, 467, 10.1016/j.aej.2013.04.001 Azevedo ML, Leite FC, Lima MMCL. Experimental study of scour around circular and elongated bridge piers with and without pier slot, V Conferência Nacional de Mecânica dos Fluidos, Termodinâmica e Energia-MEFTE 2014; 2014. Elnikhely, 2017, minimizing scour around bridge pile using holes, Ain Shams Eng J, 8, 499, 10.1016/j.asej.2016.06.016 Melville, 1992, Local scour at bridge abutments, J Hydraul Eng, 118, 615, 10.1061/(ASCE)0733-9429(1992)118:4(615) Raudkivi, 1983, Clear-water scour at cylindrical piers, J Hydraul Eng, 109, 338, 10.1061/(ASCE)0733-9429(1983)109:3(338) Chang, 1998, Maryland SHA procedure for estimating scour at bridge abutments part 2-clear water scour