The cost of inflated planned lead times in MRP systems
Tóm tắt
Tài liệu tham khảo
Huge E.G., 1979, Managing Manufacturing Lead Times, Harvard Business Review, 57, 116
Kriebel C.H., 1971, A Production Management Operating System Simulation: FACTORY‐2
Plossl G.W., 1979, The Role of Top Management in the Control of Inventory
10.1287/mnsc.27.5.571
D.A.Waliszewski.Leadtime Reduction in Multiflow Job Shop.APICS 22nd Annual Conference ProceedingsOctober 1979;209.
Watson H.J., 1981, Computer Simulation in Business
10.1287/mnsc.23.8.872
Wemmerlov U., 1979, Design Factors in MRP Systems: A Limited Survey, Production and Inventory Management, 20, 15
Wight O., 1970, Input/Output Control: A Real Handle on Lead Time, Production and Inventory Management, 11, 9