The combined positive impact of Lean methodology and Ventana Symphony autostainer on histology lab workflow
Tóm tắt
Histologic samples all funnel through the H&E microtomy staining area. Here manual processes intersect with semi-automated processes creating a bottleneck. We compare alternate work processes in anatomic pathology primarily in the H&E staining work cell. We established a baseline measure of H&E process impact on personnel, information management and sample flow from historical workload and production data and direct observation. We compared this to performance after implementing initial Lean process modifications, including workstation reorganization, equipment relocation and workflow levelling, and the Ventana Symphony stainer to assess the impact on productivity in the H&E staining work cell. Average time from gross station to assembled case decreased by 2.9 hours (12%). Total process turnaround time (TAT) exclusive of processor schedule changes decreased 48 minutes/case (4%). Mean quarterly productivity increased 8.5% with the new methods. Process redesign reduced the number of manual steps from 219 to 182, a 17% reduction. Specimen travel distance was reduced from 773 ft/case to 395 ft/case (49%) overall, and from 92 to 53 ft/case in the H&E cell (42% improvement). Implementation of Lean methods in the H&E work cell of histology can result in improved productivity, improved through-put and case availability parameters including TAT.
Tài liệu tham khảo
Sunyog M: Lean management and Six-Sigma yield big gains in hospital's immediate response laboratory. Quality improvement techniques save more than $400,000. Clin Leadersh Manag Rev. 2004, 18 (5): 255-258.
Kim CS, Spahlinger DA, Kin JM, Billi JE: Lean health care: What can hospitals learn from a world-class automaker?. J Hosp Med. 2006, 1 (3): 191-199. 10.1002/jhm.68.
Ben-Tovim DI, Bassham JE, Bolch D, Martin MA, Dougherty M, Szwarcbord M: Lean thinking across a hospital: Redesigning care at the Flinders Medical Centre. Aust Health Rev. 2007, 31 (1): 10-15.
D'Angelo R, Zarbo RJ: The Henry Ford Production system: Measures of Process Defects and Waste in Surgical Pathology as a Basis for Quality Improvement Initiatives. Amer J Clin Pathol. 2007, 128 (3): 423-429. 10.1309/X6N1Y3V2CB9HUL8G.
Raab SS, Grzybicki DM, Condel JL, Stewart WR, Turcsanyi BD, Mahood LK, Becich MJ: Effect of Lean method implementation in the histopathology section of an anatomical pathology laboratory. J Clin Pathol. 2008, 61 (11): 1193-1199. 10.1136/jcp.2007.051326. Epub 2007 Aug 3
Condel JL, Sharbaugh DT, Raab SS: Error-free pathology applying Lean production methods to anatomic pathology. Clin Lab Med. 2004, 24: 865-899. 10.1016/j.cll.2004.07.001.
Bryant PM, gulling RD: Faster, better, cheaper: Lean labs are the key to future survival. Clin Leadersh Manag Rev. 2006, 20: E2-
Mercer Corp. Gearing up for change. Accessed 18 May 2009, [http://www.mercer.com/flipbook/assets/pdf/GearingUpArticle.pdf]
Vernon SE: Continuous throughput rapid tissue processing revolutionizes histopathology work flow. Lab Med. 2005, 36 (5): 466-469. 10.1309/Y5YF5Q0EWX512LPP.
Buesa RJ: Histology: A unique area of the medical laboratory. Annals of Diagnostic Pathology. 2007, 11 (2): 137-141. 10.1016/j.anndiagpath.2007.01.002.
Buesa RJ: A puzzling, perplexing problem: Histology staffing levels still a work in progress. Advance for MLP. 2006, 18 (20): 22-
The pre-publication history for this paper can be accessed here:http://www.biomedcentral.com/1472-6890/10/2/prepub