The NBI Control System for the EAST
Tóm tắt
Từ khóa
Tài liệu tham khảo
Y. Wan, J. Li, P. Weng, First engineering commissioning of EAST tokamak. Plasma Sci. Technol. 8, 253–254 (2006)
L. Hu, X. Zhang, R. Yao, EAST neutral beam injection project for EAST Tokamak. Nucl. Tech. 20, 149–152 (2006)
C. Hu, Y. Xie, NBI Team, Development of megawatt level high current ion source. Plasma Sci. Technol. 14, 75–77 (2012)
P. Sheng, C. Hu, et al., Control framework of neutral beam injection system for EAST. In 9th Asia-Pacific Conference on Plasma Science and Technology (Huangshan, China, 2008)
Y. Wu, J. Luo, Z. Ji et al., Development of the central timing system on the EAST Tokamak. Nucl. Tech. 30, 789–792 (2007)
D. Wu, C. Hu, P. Sheng et al., Design of main control consol software in EAST neutral beam injector’s control system for the first beam line. J Fusion Energ. 32, 317–418 (2013)