Sustainable procurement in the Canadian construction industry: current practices, drivers and opportunities

Journal of Cleaner Production - Tập 109 - Trang 305-314 - 2015
Rajeev Ruparathna1, Kasun Hewage1
1School of Engineering, University of British Columbia, Okanagan Campus, BC, Canada

Tài liệu tham khảo

Adetunji, 2003, Sustainability and the UK construction industry: a review, Eng. Sustain., 156, 15 Akadiri, 2012, Development of sustainable assessment criteria for building materials selection, Eng. Constr. Archit. Manag., 19, 666, 10.1108/09699981211277568 Anthonissen, 2015, Using carbon dioxide emissions as a criterion to award road construction projects: a pilot case in Flanders, J. Clean. Prod., 102, 96, 10.1016/j.jclepro.2015.04.020 Bartlett, 2001, Organizational research: determining appropriate sample size in survey research appropriate sample size in survey research, Inform. Technol. Learn. Perform. J., 19, 43 Betts, 2011 Bock, 2002, Small sample market research, Int. J. Mark. Res., 44, 235, 10.1177/147078530204400205 Bratt, 2013, Assessment of criteria development for public procurement from a strategic sustainability perspective, J. Clean. Prod., 52, 309, 10.1016/j.jclepro.2013.02.007 Carter, 2007, Sustainable development policy perceptions and practice in the UK social housing sector, Constr. Manag. Econ., 25, 399, 10.1080/01446190600922578 Chen, 2008, Knowledge-driven ANP approach to vendors evaluation for sustainable construction, J. Constr. Eng. Manag., 134, 928, 10.1061/(ASCE)0733-9364(2008)134:12(928) Construction Industry Institute, 2015 Cox, 2006 Cox, 2010, Triangulation, Encycl. Case Study Res., 945 Environment Canada, 2010 Essa, 2008, Pre-construction evaluation practices of sustainable housing projects in the UK, Eng. Constr. Archit. Manag., 15, 514, 10.1108/09699980810916960 Faith-Ell, 2006, The application of environmental requirements in Swedish road maintenance contracts, J. Clean. Prod., 14, 163, 10.1016/j.jclepro.2004.11.004 Fellows, 2003 Fitch, 2015, Economic sustainability of DBO water based on wastewater projects in the U. S.: three case studies, J. Constr. Eng. Manag., 141, 05015001, 10.1061/(ASCE)CO.1943-7862.0000967 Given, 2008 Gopalakrishnan, 2012, Sustainable supply chain management: a case study of British Aerospace (BAe) Systems, Int. J. Prod. Econ., 140, 193, 10.1016/j.ijpe.2012.01.003 Hall, 2010, Briefing: a practical initiative for the construction industry, Eng. Sustain., 163, 181, 10.1680/ensu.2010.163.4.181 Hampton, 1994, Procurement issues, J. Manage. Eng., 10, 45 Hassini, 2012, A literature review and a case study of sustainable supply chains with a focus on metrics, Int. J. Prod. Econ., 140, 69, 10.1016/j.ijpe.2012.01.042 Heldman, 2011 Hewage, 2007 Holyk, 2008 Human Resources and Skills Development Canada, 2013 Hwang, 2013, Project management knowledge and skills for green construction: overcoming challenges, Int. J. Project Manag., 31, 272, 10.1016/j.ijproman.2012.05.004 Häkkinen, 2011, Barriers and drivers for sustainable building, Build. Res. Inform., 39, 239, 10.1080/09613218.2011.561948 ICLEI, 2007 Industry Canada, 2011 Industry Canada, 2012 Jones, 2006, Corporate social responsibility and the UK construction industry, J. Corp. Real Estate, 8, 134, 10.1108/14630010610711757 Kashyap, 2003 Lastewka, 2005 Levine, 2011 Liu, 2011, Adopting innovative procurement techniques: obstacles and drivers for adopting public private partnerships in New Zealand, Const. Innov. Inform. Process, Manag., 11, 452, 10.1108/14714171111175918 Martins, 2009 Mason, 2010, Sample size and saturation in PhD studies using qualitative interviews, Forum: Qual. Social Res., 11 McMichael, 2003, New visions for addressing sustainability, Science, 302, 1919, 10.1126/science.1090001 Meehan, 2011, Sustainable procurement practice, Bus. Strat. Environ., 20, 94, 10.1002/bse.678 Michelsen, 2009, Green procurement in Norway: a survey of practices at the municipal and county level, J. Environ. Manag., 91, 160 Miller, 2008 Mosgaard, 2013, Greening non-product-related procurement – when policy meets reality, J. Clean. Prod., 39, 137, 10.1016/j.jclepro.2012.08.018 Perera, 2007 Preuss, 2009, Addressing sustainable development through public procurement: the case of local government, Supply Chain Manag., 14, 213, 10.1108/13598540910954557 Price Water Coopers, 2009 Ra, 2012 Rietbergen, 2013, Assessing the potential impact of the CO2 performance ladder on the reduction of carbon dioxide emissions in the Netherlands, J. Clean. Prod., 52, 33, 10.1016/j.jclepro.2013.03.027 Robinson, 2004, Squaring the circle? Some thoughts on the idea of sustainable development, Ecol. Econ., 48, 369, 10.1016/j.ecolecon.2003.10.017 Rowlinson, 1999 Ruparathna, 2015, Sustainable procurement in the Canadian construction industry: challenges and benefits, Can. J. Civil Eng., 42, 417, 10.1139/cjce-2014-0376 Sarkis, 2012, Incorporating sustainability into contractor evaluation and team formation in the built environment, J. Clean. Prod., 31, 40, 10.1016/j.jclepro.2012.02.029 Sears, 2008 Sebastian, 2011, Changing roles of the clients, architects and contractors through BIM, Eng. Constr. Archit. Manag., 18, 176, 10.1108/09699981111111148 Sev, 2009, How can the construction industry contribute to sustainable development? A conceptual framework, Sustain. Dev., 17, 161, 10.1002/sd.373 Shen, 2010, Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice, J. Clean. Prod., 18, 254, 10.1016/j.jclepro.2009.10.014 Shen, 2002, Implementation of environmental management in the Hong Kong construction industry, Int. J. Project Manag., 20, 535, 10.1016/S0263-7863(01)00054-0 Shiers, 2006, Sustainable construction: the development and evaluation of an environmental profiling system for construction products, Constr. Manag. Econ., 24, 1177, 10.1080/01446190600892987 Sourani, 2011, Barriers to addressing sustainable construction in public procurement strategies, Eng. Sustain., 164, 229, 10.1680/ensu.2011.164.4.229 Sourani, 2008 Spence, 1995, Sustainable development and the construction industry, Habitat Int., 19, 279, 10.1016/0197-3975(94)00071-9 Statistics Canada, 2009 Statistics Canada, 2012 Sustainable Procurement Task Force, 2006 Swan, 2007, Mutual objective setting for partnering projects in the public sector, Eng. Constr. Archit. Manag., 14, 119, 10.1108/09699980710731254 Tam, 2004, Green construction assessment for environmental management in the construction industry of Hong Kong, Int. J. Project Manag., 22, 563, 10.1016/j.ijproman.2004.03.001 Tarantini, 2011, A life cycle approach to green public procurement of building materials and elements: a case study on windows, Energy, 36, 2473, 10.1016/j.energy.2011.01.039 Trochim, 2008 Tysseland, 2008, Life cycle cost based procurement decisions, Int. J. Project Manag., 26, 366, 10.1016/j.ijproman.2007.09.005 United Nations, 2002 United Nations, 2011 Uttam, 2015, Competitive dialogue procedure for sustainable public procurement, J. Clean. Prod., 86, 403, 10.1016/j.jclepro.2014.08.031 Varnäs, 2009, Environmental consideration in procurement of construction contracts: current practice, problems and opportunities in green procurement in the Swedish construction industry, J. Clean. Prod., 17, 1214, 10.1016/j.jclepro.2009.04.001 Varnäs, 2008 Walker, 2012, The relationship between sustainable procurement and e-procurement in the public sector, Int. J. Prod. Econ., 140, 256, 10.1016/j.ijpe.2012.01.008 Walker, 2008 Xia, 2014, How public owners communicate the sustainability requirements of green design-build projects, J. Constr. Eng. Manag., 140, 04014036, 10.1061/(ASCE)CO.1943-7862.0000879