Supply chain implications of concurrent engineering
Tóm tắt
Từ khóa
Tài liệu tham khảo
Anon (1993),Marketing Rules of Thumb.
Anumba, C.J.et al. (1995), “An approach to modelling construction as a competitive manufacturing process”,Competitive Manufacturing – Proceedings of the 12th Annual Conference of the Irish Manufacturing Committee, University College, Cork.
Braun, C.‐F.V. (1990), “The acceleration trap”,Sloan Management Review, Vol. 32 No. 1, pp. 49‐58.
Broughton, T. (1990), “Simultaneous engineering in aero gas turbine design and manufacture”,Proceedings of the 1st International Conference on Simultaneous Engineering, Status Meetings, London.
Clark, K.B. and Fujimoto, T. (1987a),Overlapping Problem Solving in Product Development, Harvard Business School, Boston, MA.
Clark, K.B. and Fujimoto, T. (1987b),Product Development in the World Auto Industry: Strategy, Organisation and Performance, Brookings Institute Microeconomics Conference, Brookings Institute, Washington, DC.
Cullen, T.H.L. (1990),The Public Inquiry into the Piper Alpha Disaster, HMSO, London.
Dobson, J. (1991),Information and Denial of Service, Database Security and Prospects V., North Holland, Amsterdam.
Egan, J. (1998),Rethinking Construction – Report of the Construction Task Force on the Scope for Improving the Quality and Efficiency of UK Construction Industry, Department of the Environment, Transport & the Regions, London.
Eversheim, W. (1990), “Trends and experience in applying simultaneous engineering in Germany”,Proceedings of the 1st International Conference on Simultaneous Engineering, Status Meetings, London.
Gregg, D. (1996), “Emerging challenges in business and manufacturing decision support”,The Science of Business Process Analysis, ESRC Business Process Resource Centre, University of Warwick, Coventry.
Haigh, G. (1992), “The fetish for sacking”,The Independent Monthly, Surrey Hills, Sydney, pp. 12‐15.
Hartley, J. and Mortimer, J. (1990),Simultaneous Engineering, Industrial Newsletters, Toddington, Dunstable.
Hoekstra, S. and Romme, J. (1992),Integral Logistic Structure – Developing Customer‐oriented Goods Flow, McGraw‐Hill, New York, NY.
Holberton, S. (1991), “Let’s do this in stages”,Financial Times, p. 8.
Holtham, C. (1993),Improving the Performance of Workgroups through Information Technology, City University Business School, London.
Joyner, S.M.et al. (1996),User and Organisational Requirements, HUSAT Research Institute, Elms Grove, Loughborough.
Mattei, D. (1996), “Why solids data exchange is not solid”,Computer‐aided Engineering, Vol. 15, pp. 28‐9.
May, A.et al. (1996a),Suppliers and Manufacturers in Automotive Collaboration: Final Experiment Running and Evaluation, HUSAT Research Institute, Loughborough University, Loughborough.
May, A.J.et al. (1999b), “Virtual team working in the European automotive industry: user and organisational requirements and a case study”,International Journal of Human Factors in Manufacturing.
Mitleton‐Kelly, E. (1997),Complex Adaptive Systems in an Organisational Context: Organisations as Co‐evolving Complex Adaptive Systems, ESRC Business Process Resource Centre, University of Warwick, Warwick.
Mumford, E. (1983), “Participative systems design: practice and theory”,Journal of Occupational Behaviour, Vol. 4, pp. 47‐57.
PA Consultants (1989),Manufacturing into the Late 1990s, PA Consulting Group, London.
Prahalad, C.K. and Hamel, G. (1990), “The core competence of the corporation”,Harvard Business Review, Vol. 68 No. 3, pp. 79‐91.
Reinertsen, D.G. (1983), “Whodunit? The search for new‐product killers”,Electronic Business, July, pp. 62‐6.
Sinclair, M.A.et al. (1995), “A discussion of simultaneous engineering and the manufacturing supply chain, from an ergonomics perspective”,International Journal of Industrial Engineering, Vol. 16 Nos 4‐6, pp. 263‐82.
Yang, H.M. and Anumba, C.J. (1999),Collaborative Decision Making in Construction – Potential Area for Fuzzy Systems?, Advances in Soft Computing, De Montfort University, Leicester.