Supplier selection in automobile industry: A mixed balanced scorecard–fuzzy AHP approach

Alexandria Engineering Journal - Tập 55 Số 1 - Trang 93-100 - 2016
Masoud Rahiminezhad Galankashi1, Syed Ahmad Helmi1, Pooria Hashemzahi2
1Department of Material, Manufacturing and Industrial Engineering, Faculty of Mechanical Engineering, Universiti Teknologi Malaysia, 81310 Johor, Malaysia
2Department of Mechanical Engineering, Faculty of Engineering, University of Malaya, 50603 Kuala Lumpur, Malaysia

Tóm tắt

Từ khóa


Tài liệu tham khảo

Michaels, 1995, Activity-specific role stress in purchasing, Int. J. Purchas. Mater. Manage., 31, 10

Patton, 1996, Use of human judgment models in industrial buyers’ vendor selection decisions, Ind. Market. Manage., 25, 135, 10.1016/0019-8501(95)00073-9

J. Kontio, A case study in applying a systematic method for COTS selection, in: Software Engineering, 1996, IEEE Proceedings of the 18th International Conference on 1996, 1996.

Shyur, 2006, A hybrid MCDM model for strategic vendor selection, Math. Comput. Modell., 44, 749, 10.1016/j.mcm.2005.04.018

De Boer, 2001, A review of methods supporting supplier selection, Eur. J. Purchas. Supply Manage., 7, 75, 10.1016/S0969-7012(00)00028-9

Wu, 2009, A fuzzy MCDM approach for evaluating banking performance based on Balanced Scorecard, Expert Syst. Appl., 36, 10135, 10.1016/j.eswa.2009.01.005

De Boer, 1998, Outranking methods in support of supplier selection, Eur. J. Purchas. Supply Manage., 4, 109, 10.1016/S0969-7012(97)00034-8

Castro-Lacouture, 2007, Supply chain optimization tool for purchasing decisions in B2B construction marketplaces, Autom. Constr., 16, 569, 10.1016/j.autcon.2006.08.005

Lima Junior, 2014, A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection, Appl. Soft Comput., 21, 194, 10.1016/j.asoc.2014.03.014

Galankashi, 2013, Supplier selection for electrical manufacturing companies based on different supply chain strategies, Electr. Eng.

Dargi, 2014, Supplier selection: a fuzzy-ANP approach, Proc. Comput. Sci., 31, 691, 10.1016/j.procs.2014.05.317

Ghodsypour, 1998, A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming, Int. J. Product. Econ., 56, 199, 10.1016/S0925-5273(97)00009-1

Spekman, 1988, Strategic supplier selection: understanding long-term buyer relationships, Bus. Horiz., 31, 75, 10.1016/0007-6813(88)90072-9

Chen, 2006, A fuzzy approach for supplier evaluation and selection in supply chain management, Int. J. Prod. Econ., 102, 289, 10.1016/j.ijpe.2005.03.009

Neely, 1995, Performance measurement system design: a literature review and research agenda, Int. J. Oper. Prod. Manage., 15, 80, 10.1108/01443579510083622

Kaplan, 1996, Linking the balanced scorecard to strategy, Calif. Manage. Rev., 39, 10.2307/41165876

Kaplan, 1996, vol. 6

Sharma, 2007, An integrated BSC–AHP approach for supply chain management evaluation, Meas. Bus. Excell., 11, 57, 10.1108/13683040710820755

Lee, 2008, A fuzzy AHP and BSC approach for evaluating performance of IT department in the manufacturing industry in Taiwan, Expert Syst. Appl., 34, 96, 10.1016/j.eswa.2006.08.022

Cebeci, 2009, Fuzzy AHP-based decision support system for selecting ERP systems in textile industry by using balanced scorecard, Expert Syst. Appl., 36, 8900, 10.1016/j.eswa.2008.11.046

Tseng, 2010, Implementation and performance evaluation using the fuzzy network balanced scorecard, Comput. Educ., 55, 188, 10.1016/j.compedu.2010.01.004

Yüksel, 2010, Using the fuzzy analytic network process (ANP) for Balanced Scorecard (BSC): a case study for a manufacturing firm, Expert Syst. Appl., 37, 1270, 10.1016/j.eswa.2009.06.002

Wang, 2010, Integrating hierarchical balanced scorecard with non-additive fuzzy integral for evaluating high technology firm performance, Int. J. Prod. Econ., 128, 413, 10.1016/j.ijpe.2010.07.042

Chang, 2007, An application of AHP and sensitivity analysis for selecting the best slicing machine, Comput. Ind. Eng., 52, 296, 10.1016/j.cie.2006.11.006

Bentes, 2012, Multidimensional assessment of organizational performance: integrating BSC and AHP, J. Bus. Res., 65, 1790, 10.1016/j.jbusres.2011.10.039

Ravi, 2005, Analyzing alternatives in reverse logistics for end-of-life computers: ANP and balanced scorecard approach, Comput. Ind. Eng., 48, 327, 10.1016/j.cie.2005.01.017

Niebecker, 2010, Collaborative and cross-company project management within the automotive industry using the Balanced Scorecard, Int. J. Manage. Proj. Bus., 3, 328, 10.1108/17538371011036617

Jalali Naini, 2011, Designing a mixed performance measurement system for environmental supply chain management using evolutionary game theory and balanced scorecard: a case study of an auto industry supply chain, Conserv. Recycl., 55, 593, 10.1016/j.resconrec.2010.10.008

Habidin, 2012, A proposed strategic balanced scorecard model: strategic control system and organizational performance in Malaysian automotive industry, J. Bus. Manage., 1, 39

W. Thanaraksakul, B. Phruksaphanrat. Supplier evaluation framework based on balanced scorecard with integrated corporate social responsibility perspective, in: Proceedings of the International MultiConference of Engineers and Computer Scientists; 2009.

Zimmermann, 2009, Two case studies on developing, implementing and evaluating a balanced scorecard in distribution channel dyads, Int. J. Logis.: Res. Appl., 12, 63, 10.1080/13675560802141697

Coskun, 2008, Measurement frequency of performance indicators and satisfaction on corporate performance: a survey on manufacturing companies, Eur. J. Econ., Finance Adm. Sci., 13, 79

Azar, 2011, A BSC method for supplier selection strategy using TOPSIS and VIKOR: a case study of part maker industry, Manage. Sci. Lett., 1, 559, 10.5267/j.msl.2011.05.005

E.M. Sabóia, et al., Strategic management indicators for internal logistics: a proposal based on the Balanced Scorecard for an automotive sector company, in 12th International Conference on Industrial Engineering and Operations Management, 2006.

Boran, 2009, A multi-criteria intuitionistic fuzzy group decision making for supplier selection with TOPSIS method, Expert Syst. Appl., 36, 11363, 10.1016/j.eswa.2009.03.039

Saaty, 1988, What is the Analytic Hierarchy Process?, Springer

Millet, 1998, Ethical decision making using the analytic hierarchy process, J. Bus. Ethics, 17, 1197, 10.1023/A:1005700314298

Zadeh, 1965, Fuzzy sets, Inf. Control, 8, 338, 10.1016/S0019-9958(65)90241-X

Salii, 1965, Binary⧹mathfrakL-relations, Izvestiya Vysshikh Uchebnykh Zavedenii. Matematika, 1, 133

Dubois, 1988

Liang, 2006, FM-test: a fuzzy-set-theory-based approach to differential gene expression data analysis, BMC Bioinformatics, 7, S7, 10.1186/1471-2105-7-S4-S7

Kong, 2005, Applying fuzzy analytic hierarchy process to evaluate success factors of e-commerce, Int. J. Inf. Syst. Sci., 1, 406

Galankashi, 2015, Prioritizing green supplier selection criteria using fuzzy analytical network process, Proc. CIRP, 26, 689, 10.1016/j.procir.2014.07.044

Galankashi, 2016, Performance evaluation of a petrol station queuing system: a simulation-based design of experiments study, Adv. Eng. Softw., 92, 15, 10.1016/j.advengsoft.2015.10.004

Galankashi, 2013, Assessment of supply chain strategies and analysis on the performance of companies deployed strategy using activity based approach, J. Teknol., 64

Eldosouky, 2014, Management of construction cost contingency covering upside and downside risks, Alex. Eng. J., 53.4, 863, 10.1016/j.aej.2014.09.008

Aziz, 2014, Smart optimization for mega construction projects using artificial intelligence, Alex. Eng. J., 53, 591, 10.1016/j.aej.2014.05.003

Issa, 2013, Implementation of lean construction techniques for minimizing the risks effect on project construction time, Alex. Eng. J., 52, 697, 10.1016/j.aej.2013.07.003

Aziz, 2013, Factors causing cost variation for constructing wastewater projects in Egypt, Alex. Eng. J., 52, 51, 10.1016/j.aej.2012.11.004

Aziz, 2013, Applying lean thinking in construction and performance improvement, Alex. Eng. J., 52, 679, 10.1016/j.aej.2013.04.008