Spare parts management for technical systems: resupply of spare parts under limited budgets

W.D. Rustenburg1,2, G.J. van Houtum1, W.H.M. Zijm1
1Faculty of Technology Management, Eindhoven University of Technology, Eindhoven, The Netherlands
2Royal Netherlands Navy, Naval Maintenance Company, Den Helder, The Netherlands

Tóm tắt

In this paper, we study the operational availability of a complex technical system consisting of several components. The components are subject to breakdowns, and hence for each component a limited number of spare parts are held in stock. If a system's component fails and it can not be replaced immediately, due to a lack of spares, the system becomes unavailable until a new component is installed. Failed components are disposed of and hence, to keep the spare parts stock at an appropriate level, new components have to be purchased. We assume that only a limited annual budget is available for procurement, while any further procurement requires a considerable lead time. We investigate at an aggregate level what budgets are needed to attain a target availability level for the system. In addition, we develop various operational strategies for spending the annual budget during each year. Numerical results indicate that the so-called Balance Focussed strategy provides the best results in terms of system availability as a function of time.

Từ khóa


Tài liệu tham khảo

Graves, S.C. (1985) A multi-echelon inventory model for a repairable item with one-for-one replenishment. Management Science, 31, 1247–1256.

Muckstadt, J. (1973) A model for a multi-item, multi-echelon, multi-indenture inventory system. Management Science, 20, 472–481.

Rustenburg, W.D., Van Houtum, G.J. and Zijm, W.H.M. (1998) Spare parts management at the Royal Netherlands Navy: VARI-METRIC and beyond (revised version). BETA Working Paper WP-39, University of Twente.

Sherbrooke, C.C. (1968) METRIC: a multi-echelon technique for recoverable item control. Operations Research, 16, 122–141.

Sherbrooke, C.C. (1986) VARI-METRIC: improved approximations for multi-indenture, multi-echelon availability models. Operations Research, 34, 311–319.

Sherbrooke, C.C. (1992) Optimal Inventory Modeling of Systems: Multi-Echelon Techniques, Wiley, New York.

Silver, E.A., Pyke, D.F. and Peterson, R. (1998) Inventory Management and Production Planning and Scheduling, Wiley, New York.

Slay, F.M. (1984) VARI-METRIC: an approach to modelling multi-echelon resupply when the demand process is Poisson with a gamma prior. Report AF301–3, Logistics Management Institute, Washington D.C.

Van Houtum, G.J. and Zijm, W.H.M. (1997) Incomplete convolutions in production and inventory models. OR Spektrum, 19, 97–107.

Van Houtum, G.J. and Zijm, W.H.M. (1991) Computational procedures for stochastic multi-echelon production systems. International Journal of Production Economics, 23, 223–237.