Simulation of recovery of upper remnant coal pillar while mining the ultra-close lower panel using longwall top coal caving

Guorui Feng1, Pengfei Wang1
1College of Mining Engineering, Taiyuan University of Technology, Taiyuan 030024, China

Tài liệu tham khảo

BP. Energy outlook 2019 edition. London; 2019. Bai, 2018, Vertical stress and stability of interburden over an abandoned pillar working before upward mining: a case study, R Soc Open Sci, 5, 10.1098/rsos.180346 Ghabraie, 2016, Mechanism and prediction of ground surface subsidence due to multiple-seam longwall mining, 1 Zhang, 2016, Residual coal exploitation and its impact on sustainable development of the coal industry in China, Energy Policy, 96, 534, 10.1016/j.enpol.2016.06.033 Chen, 2016, Strip coal pillar design based on estimated surface subsidence in Eastern China, Rock Mech Rock Eng, 49, 3829, 10.1007/s00603-016-0988-y Gao, 2014, Study on the width of the non-elastic zone in inclined coal pillar for strip mining, Int J Rock Mech Min Sci, 72, 304, 10.1016/j.ijrmms.2014.09.013 Esterhuizen, 2010, Numerical model calibration for simulation coal pillars, gob and overburden response, 46 Chen, 2018, Extraction of the remnant coal pillar in regular and irregular shapes: a case study, J Loss Prev Process Ind, 55, 191, 10.1016/j.jlp.2018.06.012 Feng, 2019, Stability of gate roads next to an irregular yield pillar: a case study, Rock Mech Rock Eng, 52, 2741, 10.1007/s00603-018-1533-y Wang, 2017, A coupled macro- and meso-mechanical model for heterogeneous coal, Int J Rock Mech Min Sci, 94, 64, 10.1016/j.ijrmms.2017.03.002 Itasca Consulting Group Inc, 2018